Concept explainers
Elon Corporation manufactures parts for an aircraft company. It uses a computerized numerical controlled (CNC) machining center to produce a specific part that has a design (nominal) target of 1.275 inches with tolerances of ±0.024 inch. The CNC process that manufactures these parts has a mean of 1.281 inches and a standard deviation of 0.008 inch. Compute the process capability ratio and process capability index, and comment on the overall capability of the process to meet the design specifications.
Want to see the full answer?
Check out a sample textbook solutionChapter 3 Solutions
Operations and Supply Chain Management, 9th Edition WileyPLUS Registration Card + Loose-leaf Print Companion
Additional Business Textbook Solutions
Business in Action
Principles of Operations Management: Sustainability and Supply Chain Management (10th Edition)
Business in Action (8th Edition)
Operations Management
Operations Management: Processes and Supply Chains (11th Edition)
Operations Management: Sustainability and Supply Chain Management (12th Edition)
- SCENARIO B: A woodcutting operation has a target (nominal) value of 200 inches and consistently averages 200.1 inches with a standard deviation of .05 inches. The design engineers have established an upper specification limit of 200.25 and a lower specification limit of 199.75 inches.arrow_forwardA metal fabricator produces connecting rods with an outer diameter that has a 1 ± 0.04 inch specification. A machine operator takes several sample measurements over time and determines the sample mean outer diameter to be 1.003 inches with a standard deviation of 0.020 inch. Calculate the process capability index.arrow_forwardProblem 1: Auto pistons at Wemming Chung’s plant in Shanghai are produced in a forging process, and the diameter is a critical factor that must be controlled. From sample sizes of 10 pistons produced each day, the mean and the range of this diameter have been as follows: Day Mean (mm) Range (mm) 1 156.9 4.2 2 153.2 4.6 3 153.6 4.1 4 155.5 5.0 5 156.6 4.5 a) What are the UCL x (line on top of x, counldn't find the button to do it) and LCL x (line on top of x) , using 3σ? Plot the data. b) What are the UCL R and LCL R , using 3σ? Plot the data. c) Is the Process in Control? (Please screen shot the EXCEl if its in excel) Note:- Do not provide handwritten solution. Maintain accuracy and quality in your answer. Take care of plagiarism. Answer completely. You will get up vote for sure.arrow_forward
- Boston Electric Generators has been getting many complaints from its major customer, Home Station, about the quality of its shipments of home generators. Daniel Shimshak, the plant manager, is alarmed that a customer is providing him with the only information the company has on shipment quality. He decides to collect information on defective shipments through a form he has asked his drivers to complete on arrival at customers' stores. The forms for the first 283 shipments have been turned in. They show the following over the past 8 weeks: Reason for Defective Shipment A. 50- 40- 30- 20- 10- 0- Number of defects A B C D A: Incorrect bill of lading B: Trucks late C: Incorrect truckload D: Damaged product O B. Week 1 This exercise contains only part c. c) Choose the correct Pareto chart for the type of defects that have occurred. 50- 40- 30- 20- 10- 0- 2345∞ 6 7 8 No. of Shipments 23 29 30 37 35 42 元 41 46 Number of defects A B C D A: Incorrect bill of lading B: Trucks late C: Damaged…arrow_forwardBoston Electric Generators has been getting many complaints from its major customer, Home Station, about the quality of its shipments of home generators. Daniel Shimshak, the plant manager, is alarmed that a customer is providing him with the only information the company has on shipment quality. He decides to collect information on defective shipments through a form he has asked his drivers to complete on arrival at customers' stores. The forms for the first 285 shipments have been turned in. They show the following over the past 8 weeks: Week 1 234567 8 This exercise contains only part c. No. of Shipments 23 31 30 37 35 42 43 44 No. of Shipments Incorrect with Bill of Defects 10 11 11 12 12 14 15 16 Reason for Defective Shipment Lading 4 1 3 4 5 4 Incorrect Damaged Trucks Truckload Product Late 4 5 5 4 5668 2 7212N 3 AN 4 2 0 4 3111C 2arrow_forwardStudies on a machine that molds plastic water pipe indicate that when it is injecting1-inch diameter pipe, the process standard deviation is 0.05 inches. The one-inchpipe has a specification of 1-inch plus or minus 0.10 inch. What is the processcapability index (Cp) if the long-run process mean is 1 inch?arrow_forward
- A team of undergraduate business students was asked to recommend improvement to the data entry process at the county appraiser’s office. The team identified several types of errors, such as posting an incorrect name or entering an incorrect parcel number. The deed abstractors were asked to keep a record of the errors in data entry that were sent to them. The following table is a frequency distribution of errors: Defect Total Posting error in name Posting error in parcel Property sold after tax bills were mailed Inappropriate call transfer (not part of deeds>mapping) Posting error in legal description>incompletelegal description Deeds received after tax bills printed Correspondence errors Miscellaneous errors 23 21 5 18 4 6 2 1 a. Construct a Pareto diagram of these defects in data entry.b. What recommendations would you suggest to the county appraiser?arrow_forwardBoston Electric Generators has been getting many complaints from its major customer, Home Station, about the quality of its shipments of home generators. Daniel Shimshak, the plant manager, is alarmed that a customer is providing him with the only information the company has on shipment quality. He decides to collect information on defective shipments through a form he has asked his drivers to complete on arrival at customers' stores. The forms for the first 287 shipments have been turned in. They show the following over the past 8 weeks: Week No. of Shipments No. of Shipments with Defects 1 23 10 2 31 11 3 32 12 4 39 13 5 35 12 6 40 14 7 41 14 8 46 17 This exercise contains only part a. a) Using the point drawing tool eight times, develop a scatter diagram using total number of shipments and number of defective shipments. Part 2arrow_forward2) The specification for a Lindemann’s stainless steel chimney liner requires a thickness of 7.1 mm ± 0.1 mm. The firm’s quality analyst determines that the liner process operates at a mean thickness of 7.13 mm with the standard deviation of the process being 0.02 mm. a) Calculate the upper and the lower limits for the stainless steel chimney liner. b) Calculate the Cpand Cpkfor this process. Hint: Cp = (Upper Specification Limit – Lower Specification Limit)/6sigma Cpk = minimum of [(Upper Specification Limit – Xbar)/3sigma], [(Xbar – Lower Specification Limit)/3sigma]arrow_forward
- A machine is used to fill cans of motor oil additive. A single sample can is selected every hour and the net weight of the can is obtained. Since the filling process is automated, it has very stable variability, and long experience indicates that s = 0.02 oz. The process target (process mean when in control) is 8.02 oz. A tabular cusum is being used for this process with standardized values h=4.5 and k=0.5. If the values of Cumulative sums at the end of measurement 7 were C," + = 0.030 and C,¯ = 0.0 , and measurement 8 is equal to Xg = 8.071, what will be the Cumulative sum at the end of measurement 8, that is C3 + = ? 0.041 0.071 0.051 0.046 0.061arrow_forwardWest Battery Corp. has recently been receiving complaints from retailers that its 9-volt batteries are not lasting as long as other name brands. James West, head of the TQM program at West's Austin plant, believes there is no problem because his batteries have had an average life of 60 hours, about 10% longer than competitors' models. To raise the lifetime above this level would require a new level of technology not available to West. Nevertheless, he is concerned enough to set up hourly assembly line checks. Previously, after ensuring that the process was running properly, West took samples of 5 9-volt batteries for 25 test to establish the standards for control chart limits. Those 25 tests are shown in the following table: Sample Data Sample Data Hour Hour Sample Taken 1 Sample Taken 1 2 4 5 R 2 3 4 R 1 60 61 60 59 67 61.4 8 14 62 69 51 62 56 60.0 18 55 57 70 56 46 56.8 24 15 67 53 63 69 70 64.4 17 60 45 58 49 57 53.8 15 16 72 58 51 44 64 57.8 28 66 81 61 51 60 63.8 30 17 49 49 58 68…arrow_forwardSam’s Long Life 60-watt light bulbs are designed to have a life of 1,350 hours with tolerance of ± 340 hours. A recent representative sample from the process that makes these light bulbs revealed a mean of 1,290 hours, with a standard deviation of 94 hours. Compute a. Compute the process capability ratio and the process capability index, and comment on the overall capability of the process b. Explain to what extent the process for producing Sam’s Long Life 60-watt light bulbs would have to be improved to achieve 4-sigma quality. c. show detail workarrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.