Summary Introduction
To draw: The an x bar chart to be used in conjunction with an R-chart.
Introduction: Statistical process control is a statistical technique used to analyze the functioning of production process. It helps to determine the factors that leads to poor quality in the production process. It also determines the measures that have to be taken in order to correct the production process.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
The Road King Tire Company in Birmingham wants to monitor the quality of the tires it manufactures. Each day the company quality-control manager takes a sample of 100 tires, tests them, and determines the number of defective tires. The results of 20 samples have been recorded as follows:
Sample
Number of Defectives
Sample
Number of Defectives
1
14
11
18
2
12
12
10
3
9
13
19
4
10
14
20
5
11
15
17
6
7
16
18
7
8
17
18
8
14
18
22
9
16
19
24
10
17
20
23
Construct a P -chart for this process using 2q limits and describe the variation in the process.
Note:-
Do not provide handwritten solution. Maintain accuracy and quality in your answer. Take care of plagiarism.
Answer completely.
You will get up vote for sure.
Organic Grains LLC uses statistical process control to ensure that its health-conscious, low-fat, multigrain sandwich loaves have the proper weight.
Based on a previously stable and in-control process, the control limits of the x- and R-charts are:
UCL-4.86, LCL- = 4.52,
UCLR=1.344, LCLR = 0.
Over the past few days, they have taken five random samples of four loaves each and have found the following:
Based on the x-chart, is one or more samples beyond the control limits?
Sample
1
2
3
4
5
Yes
No
Loaf # 1
4.8
4.4
4.5
4.6
5.0
Net Weight
Loaf # 2
4.7
4.8
4.5
4.9
4.8
Loaf # 3
5.0
4.7
4.9
4.7
4.7
Loaf # 4
4.7
4.8
4.6
4.5
4.6
6 of 11
5
3. The manager of a building-supplies company randomly samples incoming lumber to see whether
it meets quality specifications. From each shipment, 100 pieces of 2 x 4 lumber are inspected and
judged according to whether they are first (acceptable) or second (defective) grade. The
proportions of second-grade 2 x 4s recorded for 30 shipments were as follows:
a. Construct a control chart for the proportion of second-grade 2 x 4s in samples of 100 pieces of
lumber.
b. Explain how the control chart can be of use to the manager of the building supplies company.
Shipment
No.
Proportion
of second
grade
1
0.14
2
0.22
3
0.21
4
0.15
0.19
0.26
7
0.18
8
0.22
9
0.23
10
0.21
11
0.2
12
0.14
13
0.25
14
0.2
15
0.19
16
0.18
17
0.22
18
0.22
19
0.17
20
0.21
21
0.21
22
0.13
23
0.15
24
0.2
25
0.23
26
0.23
27
0.12
28
0.19
29
0.19
30
0.26
Chapter 3 Solutions
Operations and Supply Chain Management, 9th Edition WileyPLUS Registration Card + Loose-leaf Print Companion
Ch. 3.S - Prob. 1QCh. 3.S - Prob. 2QCh. 3.S - Prob. 3QCh. 3.S - Prob. 4QCh. 3.S - Prob. 5QCh. 3.S - Prob. 6QCh. 3.S - Prob. 7QCh. 3.S - The Great Lakes Company, a grocery store chain,...Ch. 3.S - Prob. 2PCh. 3.S - Prob. 3P
Ch. 3.S - The Fast Break Computer Company assembles personal...Ch. 3.S - Prob. 5PCh. 3 - Using Sampling and Statistics to Analyze...Ch. 3 - Prob. 2.1ASCCh. 3 - Prob. 3.1ASCCh. 3 - Prob. 4.1ASCCh. 3 - Prob. 5.1ASCCh. 3 - Prob. 1QCh. 3 - Prob. 2QCh. 3 - Prob. 3QCh. 3 - Prob. 4QCh. 3 - Prob. 5QCh. 3 - Prob. 6QCh. 3 - Prob. 7QCh. 3 - Prob. 8QCh. 3 - Prob. 9QCh. 3 - Prob. 10QCh. 3 - Prob. 11QCh. 3 - Prob. 1PCh. 3 - Prob. 2PCh. 3 - Prob. 3PCh. 3 - Prob. 4PCh. 3 - Prob. 5PCh. 3 - Prob. 6PCh. 3 - Prob. 7PCh. 3 - Prob. 8PCh. 3 - Prob. 9PCh. 3 - Prob. 10PCh. 3 - Prob. 11PCh. 3 - Prob. 12PCh. 3 - Prob. 13PCh. 3 - Prob. 14PCh. 3 - Prob. 15PCh. 3 - Prob. 16PCh. 3 - Prob. 17PCh. 3 - Prob. 18PCh. 3 - Prob. 20PCh. 3 - Prob. 21PCh. 3 - Prob. 22PCh. 3 - Prob. 23PCh. 3 - Prob. 24PCh. 3 - Prob. 25PCh. 3 - Prob. 26PCh. 3 - Prob. 27PCh. 3 - Prob. 28PCh. 3 - Prob. 29PCh. 3 - Prob. 30PCh. 3 - Prob. 32PCh. 3 - Prob. 33PCh. 3 - Prob. 34PCh. 3 - Prob. 36PCh. 3 - Prob. 37PCh. 3 - Prob. 38PCh. 3 - Prob. 39PCh. 3 - Prob. 40PCh. 3 - Elon Corporation manufactures parts for an...Ch. 3 - Prob. 42PCh. 3 - Prob. 44PCh. 3 - Prob. 45PCh. 3 - Prob. 46PCh. 3 - Prob. 47PCh. 3 - Metropolitan General Hospital is a city-owned...Ch. 3 - Prob. 50PCh. 3 - Prob. 51PCh. 3 - The Shuler Motor Mile is a high-volume discount...Ch. 3 - Prob. 1.1CPCh. 3 - Prob. 2.1CPCh. 3 - Improving Service Time at Daves Burgers Daves...
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- A. Choudhury’s bowling ball factory in Illinois makes bowling balls of adult size and weight only. The standard devia-tion in the weight of a bowling ball produced at the factory is known to be 0.12 pounds. Each day for 24 days, the averageweight, in pounds, of nine of the bowling balls produced that dayhas been assessed as follows: a) Establish a control chart for monitoring the average weights of the bowling balls in which the upper and lower control lim-its are each two standard deviations from the mean. What are the values of the control limits?b) If three standard deviations are used in the chart, how do thesevalues change? Why?arrow_forwardThe Road King Tire Company in Birmingham wants to moni-tor the quality of the tires it manufactures. Each day the com-pany quality-control manager takes a sample of 100 tires, tests them, and determines the number of defective tires. The re-sults of 20 samples have been recorded as follows:Construct a p-chart for this process using 2 limits and for each of the last 30 weekdays are shown as follows:describe the variation in the process. Sample Defectives Sample Defectives1 14 11 182 12 12 103 9 13 194 10 14 205 11 15 176 7 16 187 8 17 188 14 18 229 16 19 2410 17 20 23arrow_forwardC-Spec, Inc., is attempting to determine whether an existing machine is capable of milling an engine part that has a key specification of 3 ± 0.005 inches. After a trial run on this machine, C-Spec has determined that the machine has a sample mean of 3.004 inches with a standard deviation of 0.004 inch. a. Calculate the Cpk for this machine. (Round your answer to 3 decimal places.) Cpkarrow_forward
- Auto pistons at Wemming Chung's plant in Shanghai are produced in a forging process, and the diameter is a critical factor that must be controlled. From sample sizes of 5 pistons produced each day, the mean and the range of this diameter have been as follows: Day Mean (mm) Range R (mm) 158 4.3 151.2 4.4 155.7 4.2 153.5 4.8 156.6 4.5 What is the UCL using 3-sigma?(round your response to two decimal places). 1. 2. 4.arrow_forwardC-Spec, Inc., is attempting to determine whether an existing machine is capable of milling an engine part that has a key specification of 4 ± .003 inches. After a trial run on this machine, C-Spec has determined that the machine has a sample mean of 4.001 inches witha standard deviation of .002 inch. (Answer in Appendix D)a. Calculate the Cpk for this machine.b. Should C-Spec use this machine to produce this part? Why?arrow_forwardThe objective of statistical process control (SPC) is to: Determine whether a batch of raw materials should be accepted or rejected. Determine whether a batch of finished goods should be accepted or rejected. Detect assignable cause variations versus normal random variations in the process. Identify variable versus attribute measures.arrow_forward
- C-Spec, Inc., is attempting to determine whether an existing machine is capable of milling an engine part that has a key specification of 5 ± 0.006 inches. After a trial run on this machine, C-Spec has determined that the machine has a sample mean of 5.001 inches with a standard deviation of 0.005 inch. Calculate the Cpk for this machine. (Round your answer to 3 decimal places.)arrow_forwardNanosElectron, Inc. manufactures 75,000 circuit boards per month. A random sample of 800 boards is inspected every week for three characteristics. During a recent week, four defects were found for one characteristic, two defects were found for another characteristic, and one defect was found for the third characteristic. If these inspections produced defect counts that were representative of the population, what is the overall sigma level for this process? What is the sigma level for the characteristic that showed four defects?arrow_forwardFive samples of size 4 were taken from a process. A range chart was developed that had LCLR = 0 and UCLR = 2.50. Similarly, an average chart was developed with the average range from the five samples, with LCL = 15.0 and UCL = 24.0. The ranges for each of the five samples were 1.75, 2.42, 2.75, 2.04, and 2.80, respectively. The values of the sample average for each sample were 19.5, 22.3, 17.4, 20.1, and 18.9, respectively. What can you tell management from this analysis? The process variability is out of control, and we cannot make a statement about the process average. The process variability is out of control, but the process average is in control. The process variability and the process average are out of control. We cannot tell if the process variability or the process average is out of control. Need the answer in 10 minutes, if possible. Pleasearrow_forward
- At Gleditsia Triacanthos Company, a certain manufactured part is deemed acceptable if its length is between 12.45 to 12.55 inches. The process is normally distributed with an average of 12.49 inches and a standard deviation of 0.014 inches. a) is the process capable of meeting specifications? b) Does the process meet specifications?arrow_forwardC-Spec, Inc., is attempting to determine whether an existing machine is capable of milling an engine part that has a key specification of 4 ± 0.003 inches. After a trial run on this machine, C-Spec has determined that the machine has a sample mean of 4.001 inches with a standard deviation of 0.0004 inch. a. Calculate the Cpk for this machine. (Round your answer to 3 decimal places.) Cpk b. Should C-Spec use this machine to produce this part? O Yes O Noarrow_forwardC-Spec, Incorporated is attempting to determine whether an existing machine is capable of milling an engine part that has a key specification of 4 ± 0.003 inch. After a trial run on this machine, C-Spec has determined that the machine has a sample mean of 4.001 inches with a standard deviation of 0.002 inch. Calculate the capability index ( Cpk��� ) for this machine. Note: Round your answer to 3 decimal places. Should C-Spec use this machine to produce this part? multiple choice Yes Noarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.