Operations and Supply Chain Management, 9th Edition WileyPLUS Registration Card + Loose-leaf Print Companion
9th Edition
ISBN: 9781119371618
Author: Roberta S. Russell
Publisher: Wiley (WileyPLUS Products)
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 3, Problem 38P
Summary Introduction
To draw: The process capability ratio and process capability index.
Introduction: Statistical process control is a statistical technique used to analyze the functioning of production process. It helps to determine the factors that leads to poor quality in the production process. It also determines the measures that has to be taken in order to correct the production process.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
A. Choudhury’s bowling ball factory in Illinois makes
bowling balls of adult size and weight only. The standard devia-tion in the weight of a bowling ball produced at the factory is
known to be 0.12 pounds. Each day for 24 days, the averageweight, in pounds, of nine of the bowling balls produced that dayhas been assessed as follows:
a) Establish a control chart for monitoring the average weights
of the bowling balls in which the upper and lower control lim-its are each two standard deviations from the mean. What are
the values of the control limits?b) If three standard deviations are used in the chart, how do thesevalues change? Why?
An automatic filling machine is used to fill 1-liter bottles of cola. The machine’s output is approximately normal with a mean of 1.0 liter and standard deviation of .01 liter. Output is monitored using means of samples of 25 observations.
Determine upper and lower control limits that will include roughly 97% of the sample means when the process is in control. Using Appendix B, Table A to find the value of Z corresponding to the mean control limits.
A machine is used to fill cans of motor oil additive. A single sample can is selected every hour and the net
weight of the can is obtained. Since the filling process is automated, it has very stable variability, and long
experience indicates that s = 0.02 oz. The process target (process mean when in control) is 8.02 oz. A
tabular cusum is being used for this process with standardized values h=4.5 and k=0.5. If the values of
Cumulative sums at the end of measurement 7 were C,"
+
= 0.030 and C,¯ = 0.0 , and measurement 8 is
equal to Xg = 8.071, what will be the Cumulative sum at the end of measurement 8, that is C3
+
= ?
0.041
0.071
0.051
0.046
0.061
Chapter 3 Solutions
Operations and Supply Chain Management, 9th Edition WileyPLUS Registration Card + Loose-leaf Print Companion
Ch. 3.S - Prob. 1QCh. 3.S - Prob. 2QCh. 3.S - Prob. 3QCh. 3.S - Prob. 4QCh. 3.S - Prob. 5QCh. 3.S - Prob. 6QCh. 3.S - Prob. 7QCh. 3.S - The Great Lakes Company, a grocery store chain,...Ch. 3.S - Prob. 2PCh. 3.S - Prob. 3P
Ch. 3.S - The Fast Break Computer Company assembles personal...Ch. 3.S - Prob. 5PCh. 3 - Using Sampling and Statistics to Analyze...Ch. 3 - Prob. 2.1ASCCh. 3 - Prob. 3.1ASCCh. 3 - Prob. 4.1ASCCh. 3 - Prob. 5.1ASCCh. 3 - Prob. 1QCh. 3 - Prob. 2QCh. 3 - Prob. 3QCh. 3 - Prob. 4QCh. 3 - Prob. 5QCh. 3 - Prob. 6QCh. 3 - Prob. 7QCh. 3 - Prob. 8QCh. 3 - Prob. 9QCh. 3 - Prob. 10QCh. 3 - Prob. 11QCh. 3 - Prob. 1PCh. 3 - Prob. 2PCh. 3 - Prob. 3PCh. 3 - Prob. 4PCh. 3 - Prob. 5PCh. 3 - Prob. 6PCh. 3 - Prob. 7PCh. 3 - Prob. 8PCh. 3 - Prob. 9PCh. 3 - Prob. 10PCh. 3 - Prob. 11PCh. 3 - Prob. 12PCh. 3 - Prob. 13PCh. 3 - Prob. 14PCh. 3 - Prob. 15PCh. 3 - Prob. 16PCh. 3 - Prob. 17PCh. 3 - Prob. 18PCh. 3 - Prob. 20PCh. 3 - Prob. 21PCh. 3 - Prob. 22PCh. 3 - Prob. 23PCh. 3 - Prob. 24PCh. 3 - Prob. 25PCh. 3 - Prob. 26PCh. 3 - Prob. 27PCh. 3 - Prob. 28PCh. 3 - Prob. 29PCh. 3 - Prob. 30PCh. 3 - Prob. 32PCh. 3 - Prob. 33PCh. 3 - Prob. 34PCh. 3 - Prob. 36PCh. 3 - Prob. 37PCh. 3 - Prob. 38PCh. 3 - Prob. 39PCh. 3 - Prob. 40PCh. 3 - Elon Corporation manufactures parts for an...Ch. 3 - Prob. 42PCh. 3 - Prob. 44PCh. 3 - Prob. 45PCh. 3 - Prob. 46PCh. 3 - Prob. 47PCh. 3 - Metropolitan General Hospital is a city-owned...Ch. 3 - Prob. 50PCh. 3 - Prob. 51PCh. 3 - The Shuler Motor Mile is a high-volume discount...Ch. 3 - Prob. 1.1CPCh. 3 - Prob. 2.1CPCh. 3 - Improving Service Time at Daves Burgers Daves...
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- The Road King Tire Company in Birmingham wants to moni-tor the quality of the tires it manufactures. Each day the com-pany quality-control manager takes a sample of 100 tires, tests them, and determines the number of defective tires. The re-sults of 20 samples have been recorded as follows:Construct a p-chart for this process using 2 limits and for each of the last 30 weekdays are shown as follows:describe the variation in the process. Sample Defectives Sample Defectives1 14 11 182 12 12 103 9 13 194 10 14 205 11 15 176 7 16 187 8 17 188 14 18 229 16 19 2410 17 20 23arrow_forwardThe specifications for a gasket that installs between two engine parts calls for a thickness of 6.0 mm ± .2 mm. The standard deviation of the process is estimated to be 0.05 mm. The process is known to operate at a mean thickness of 6.1 mm What are the upper and lower specification limits for the gasket? What are the Cp and Cpk values for this process? Is this process capable of producing the desired part?arrow_forwardA Quality Analyst wants to construct a control chart for determining whether three machines, all producing the same product, are under control with regard to a particular quality variable. Accordingly, he sampled four units of output from each machine, with the following results: Machine Measurements #1 17 15 15 17 #2 16 25 18 25 # 3 23 24 23 22 What is the estimate of the process mean for whenever it is under control? What is the sample average range based upon this limited sample? What are the x-bar chart upper and lower control limits?arrow_forward
- Using samples of 197 credit card statements, an auditor found the following: Sample 1 3 errors Sample 2 3 errors Sample 3 5 errors Sample 4 9 errors 1. what alpha risk would control limits of .0470 and .0038 provide? 2. Using control limits of .0470 and .0038, is the process in control? 3. Construct a control chart for the process, assuming a fraction defective of 2 percent, using two-sigma control limits. Is the process in control?arrow_forwardChoose a product on the market and discuss how process control charts could be used to monitor and control its quality during manufacturing. Be sure to specify at least 2 process attributes that should be statistically monitored or controlled during the manufacturing of the product you have chosen.arrow_forwardThe production manager at Sunny Soda, Inc., is interested in tracking the quality of the company’s 12-ounce bottle filling line. The bottles must be filled within the tolerances set for this product because the dietary information on the label shows 12 ounces as the serving size. The design standard for the product calls for a fill level of 12.00 ± 0.10 ounces. The manager collected the following sample data (in fluid ounces per bottle) on the production process: Observation Sample 1 2 3 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 12.00 11.91 11.89 12.10 12.08 11.94 12.09 12.01 12.00 11.92 11.91 12.01 11.98 12.02 12.00 11.97 11.94 12.02 12.09 11.92 11.98 12.00 12.04 11.96 11.94 11.99 12.00 11.99 12.00 12.05 12.10 12.10 11.97 12.05 12.12 12.06 12.00 11.99 11.97 12.09 12.05 12.06 12.06 12.05 12.01 12.08 11.96 11.99 11.95 12.05 12.08 12.03 11.95 12.03 12.00 12.10 11.97 12.03 11.95 11.97 a. Are the process average and range in statistical control?b. Is the process capable…arrow_forward
- Organic Grains LLC uses statistical process control to ensure that its health-conscious, low-fat, multigrain sandwich loaves have the proper weight. Based on a previously stable and in-control process, the control limits of the x- and R-charts are: UCL-4.86, LCL- = 4.52, UCLR=1.344, LCLR = 0. Over the past few days, they have taken five random samples of four loaves each and have found the following: Based on the x-chart, is one or more samples beyond the control limits? Sample 1 2 3 4 5 Yes No Loaf # 1 4.8 4.4 4.5 4.6 5.0 Net Weight Loaf # 2 4.7 4.8 4.5 4.9 4.8 Loaf # 3 5.0 4.7 4.9 4.7 4.7 Loaf # 4 4.7 4.8 4.6 4.5 4.6arrow_forwardUsing samples of 200 credit card statements, an auditor found the following: Sample 1 2 3 4 Number with errors 4 2 5 9 a. Determine the fraction defective in each sample. b. If the true fraction defective for this process is unknown, what is your estimate of it? c. What is your estimate of the mean and standard deviation of the sampling distribution of fractions defective for samples of this size? d. What control limits would give an alpha risk of .03 for this process? Page 457 e. What alpha risk would control limits of .047 and .003 provide? f. Using control limits of .047 and .003, is the process in control? g. Suppose that the long-term fraction defective of the process is known to be 2 percent. What are the values of the mean and standard deviation of the sampling distribution? h. Construct a control chart for the process, assuming a fraction defective of 2 percent, using two-sigma control limits. Is the process in control? Can you show me the steps and formulas using excelarrow_forwardFactors for Computing Control Chart Limits (3 sigma) Auto pistons at Wemming Chung's plant in Shanghai are produced in a forging process, and the diameter is a critical factor that must be controlled. From sample sizes of 10 pistons produced each day, the mean and the range of this diameter have been as follows: Day Mean x (mm) Range R (mm) 1 156.9 4.2 2 153.2 4.6 3 153.6 4.1 4 155.5 5.0 5 156.6 4.5 Part 4 c) What are the (UCLx) and (LCLx) using 3-sigma? (UCLx) = mm (round your response to two decimal places). (LCLx) = mmarrow_forward
- A machine at the Pacific Fruit Company fills boxes withraisins. The labeled weight of the boxes is 9 ounces. The company wants to construct an R-chart to monitor the fill-ing process and make sure the box weights are in control. The quality-control department for the company sampledfive boxes every two hours for three consecutive workingdays. The sample observations are as follows: Construct an R-chart from these data with 3 control lim-its, plot the sample range values, and comment on process control. Samples Box Weights (oz)1 9.06 9.13 8.97 8.85 8.462 8.52 8.61 9.09 9.21 8.953 9.35 8.95 9.20 9.03 8.424 9.17 9.21 9.05 9.01 9.535 9.21 8.87 8.71 9.05 9.356 8.74 8.35 8.50 9.06 8.897 9.00 9.21 9.05 9.23 8.788 9.15 9.20 9.23 9.15 9.069 9.98 8.90 8.81 9.05 9.1310 9.03 9.10 9.26 9.46 8.4711 9.53 9.02 9.11 8.88 8.9212 8.95 9.10 9.00 9.06 8.95arrow_forwardQuality control programs often establish control limits that are three standard deviationsfrom the target mean of a process. If the mean of a sample taken from the process iswithin the control limits, the process is deemed satisfactory.A process is designed to fill bottles with 16 ounces of soda with a standard deviationof 0.5 ounces. Determine the control limits above and below the mean for this processusing a sample size of n = 30.arrow_forwardAuto pistons at Wemming Chung's plant in Shanghai are produced in a forging process, and the diameter is a critical factor that must be controlled. From sample sizes of 10 pistons produced each day, the mean and the range of this diameter have been as follows: a) What is the value of x? = x= 155.56 mm (round your response to two decimal places). b) What is the value of R? R 4.48 mm (round your response to two decimal places). c) What are the UCL; and LCL; using 3-sigma? Day 1 2 3 4 5 Upper Control Limit (UCL) = 156.94 mm (round your response to two decimal places). Lower Control Limit (LCL-) = 154.18 mm (round your response to two decimal places). d) What are the UCLR and LCLR using 3-sigma? Upper Control Limit (UCL) = 7.96 mm (round your response to two decimal places). Mean x (mm) 154.9 153.2 155.6 155.5 158.6 Range R (mm) 4.0 4.8 3.9 5.0 4.7 Lower Control Limit (LCL) = 1.00 mm (round your response to two decimal places). e) If the true diameter mean should be 155 mm and you want…arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.