Operations and Supply Chain Management, 9th Edition WileyPLUS Registration Card + Loose-leaf Print Companion
9th Edition
ISBN: 9781119371618
Author: Roberta S. Russell
Publisher: Wiley (WileyPLUS Products)
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 3, Problem 42P
Summary Introduction
To draw: To what extent the production process requires improvement to achieve Six Sigma quality.
Introduction: Statistical process control is a statistical technique used to analyze the functioning of production process. It helps to determine the factors that leads to poor quality in the production process. It also determines the measures that has to be taken in order to correct the production process.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Please do not give solution in image formate thanku.
The specification for a plastic liner for concrete highway projects calls for a thickness of 6.0 mm ± 0.1 mm. The standard deviation of the process is estimated to be 0.02 mm. The process is known to operate at a mean thickness of 6.03 mm. What is the Cp and Cpk for this process? Determine whether this process meet 3-sigma requirements, 6-sigma requirements, or doesn’t meet any requirements.
Linda Boardman, Inc., an equipment manufacturer in Boston, has submitted a sample cutoff valve to improve
your manufacturing process. Your process engineering department has conducted experiments and found
that the valve has a mean (u) of 12.00 and a standard deviation (o) of 0.06. Your desired performance is u =
12.00 ±3 standard deviations, where o = 0.070.
For the given information, the process capability index (Cpk) =
(round your response to three decimal
places)
Linda Boardman, Inc., an equipment manufacturer in Boston, has submitted a sample cutoff valve to improve your manufacturing process. Your process engineering department has
conducted experiments and found that the valve has a mean (μ) of 12.00 and a standard deviation (a) of 0.04. Your desired performance is μ = 12.00 ±3 standard deviations, where σ =
0.020.
For the given information, the process capability index (Cpk) = 0.875 (round your response to three decimal places).
Chapter 3 Solutions
Operations and Supply Chain Management, 9th Edition WileyPLUS Registration Card + Loose-leaf Print Companion
Ch. 3.S - Prob. 1QCh. 3.S - Prob. 2QCh. 3.S - Prob. 3QCh. 3.S - Prob. 4QCh. 3.S - Prob. 5QCh. 3.S - Prob. 6QCh. 3.S - Prob. 7QCh. 3.S - The Great Lakes Company, a grocery store chain,...Ch. 3.S - Prob. 2PCh. 3.S - Prob. 3P
Ch. 3.S - The Fast Break Computer Company assembles personal...Ch. 3.S - Prob. 5PCh. 3 - Using Sampling and Statistics to Analyze...Ch. 3 - Prob. 2.1ASCCh. 3 - Prob. 3.1ASCCh. 3 - Prob. 4.1ASCCh. 3 - Prob. 5.1ASCCh. 3 - Prob. 1QCh. 3 - Prob. 2QCh. 3 - Prob. 3QCh. 3 - Prob. 4QCh. 3 - Prob. 5QCh. 3 - Prob. 6QCh. 3 - Prob. 7QCh. 3 - Prob. 8QCh. 3 - Prob. 9QCh. 3 - Prob. 10QCh. 3 - Prob. 11QCh. 3 - Prob. 1PCh. 3 - Prob. 2PCh. 3 - Prob. 3PCh. 3 - Prob. 4PCh. 3 - Prob. 5PCh. 3 - Prob. 6PCh. 3 - Prob. 7PCh. 3 - Prob. 8PCh. 3 - Prob. 9PCh. 3 - Prob. 10PCh. 3 - Prob. 11PCh. 3 - Prob. 12PCh. 3 - Prob. 13PCh. 3 - Prob. 14PCh. 3 - Prob. 15PCh. 3 - Prob. 16PCh. 3 - Prob. 17PCh. 3 - Prob. 18PCh. 3 - Prob. 20PCh. 3 - Prob. 21PCh. 3 - Prob. 22PCh. 3 - Prob. 23PCh. 3 - Prob. 24PCh. 3 - Prob. 25PCh. 3 - Prob. 26PCh. 3 - Prob. 27PCh. 3 - Prob. 28PCh. 3 - Prob. 29PCh. 3 - Prob. 30PCh. 3 - Prob. 32PCh. 3 - Prob. 33PCh. 3 - Prob. 34PCh. 3 - Prob. 36PCh. 3 - Prob. 37PCh. 3 - Prob. 38PCh. 3 - Prob. 39PCh. 3 - Prob. 40PCh. 3 - Elon Corporation manufactures parts for an...Ch. 3 - Prob. 42PCh. 3 - Prob. 44PCh. 3 - Prob. 45PCh. 3 - Prob. 46PCh. 3 - Prob. 47PCh. 3 - Metropolitan General Hospital is a city-owned...Ch. 3 - Prob. 50PCh. 3 - Prob. 51PCh. 3 - The Shuler Motor Mile is a high-volume discount...Ch. 3 - Prob. 1.1CPCh. 3 - Prob. 2.1CPCh. 3 - Improving Service Time at Daves Burgers Daves...
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- C-Spec, Incorporated is attempting to determine whether an existing machine is capable of milling an engine part that has a key specification of 4 ± 0.003 inch. After a trial run on this machine, C-Spec has determined that the machine has a sample mean of 4.001 inches with a standard deviation of 0.002 inch. Calculate the capability index ( Cpk��� ) for this machine. Note: Round your answer to 3 decimal places. Should C-Spec use this machine to produce this part? multiple choice Yes Noarrow_forwardA manufacturer is selling pharmaceuticals that have a weight specification 199.8 to 200.2 mg, with a target value of 200 mg. Before sending its next shipment, the company collects a large sample of product and determines the mean weight of the sample is 199.89 mg, with a standard deviation of 0.035 mg. The process capability index for the current process is ____. Round to three decimal places.arrow_forwardThe process capability index (Cp/Cpk) Is the mean divided by the square of the standard deviation (variance) Is the ratio of the range of values produced divided by the range of values allowed Is the ratio of the range of values allowed divided by the range of values produced Defines the mean and standard deviation of the process Should be = 0.5 for a capable process Should be < 1 for a capable processarrow_forward
- T = -25°C A 0.5 m × 1 m double paned window is made of two silica glass panes 1 cm thick, with air in between. Under steady conditions, linear (constant gradient) Outdoors temperature profiles are found in both silica panes, as well as the air. If the room (and the inner surface of h=18Wm²K the inner glass pane) is at a temperature of 25°C, while outdoors it is -25°C with a convection coefficient of 18 W m² K-1, what is the rate of heat loss through the window? What is the rate of heat loss if the room temperature is decreased to 20°C? Finally, what is the rate of heat loss for a room temperature of 25°C, but with one of the panes (and the air) removed? 1 cm 1 cm Room Temperature, 25° C or 20º C 0.5 mm Air, k=0.024 W m¹ K¹ Silica glass, k = 0.90 W m³ Karrow_forwardWest Battery Corp. has recently been receiving complaints from retailers that its 9-volt batteries are not lasting as long as other name brands. James West, head of the TQM program at West's Austin plant, believes there is no problem because his batteries have had an average life of 60 hours, about 10% longer than competitors' models. To raise the lifetime above this level would require a new level of technology not available to West. Nevertheless, he is concerned enough to set up hourly assembly line checks. Previously, after ensuring that the process was running properly, West took samples of 5 9-volt batteries for 25 test to establish the standards for control chart limits. Those 25 tests are shown in the following table: Sample Data Sample Data Hour Hour Sample Taken 1 Sample Taken 1 2 4 5 R 2 3 4 R 1 60 61 60 59 67 61.4 8 14 62 69 51 62 56 60.0 18 55 57 70 56 46 56.8 24 15 67 53 63 69 70 64.4 17 60 45 58 49 57 53.8 15 16 72 58 51 44 64 57.8 28 66 81 61 51 60 63.8 30 17 49 49 58 68…arrow_forwardStudies on a machine that molds plastic water pipe indicate that when it is injecting1-inch diameter pipe, the process standard deviation is 0.05 inches. The one-inchpipe has a specification of 1-inch plus or minus 0.10 inch. What is the processcapability index (Cp) if the long-run process mean is 1 inch?arrow_forward
- West Battery Corp. has recently been receiving complaints from retailers that its 9-volt batteries are not lasting as long as other name brands. James West, head of the TQM program at West's Austin plant, believes there is no problem because his batteries have had an average life of 60hours, about 10% longer than competitors' models. To raise the lifetime above this level would require a new level of technology not available to West. Nevertheless, he is concerned enough to set up hourly assembly line checks. Previously, after ensuring that the process was running properly, West took samples of 5 9-volt batteries for 25 test to establish the standards for control chart limits. Those 25 tests are shown in the following table: Sample Data Sample Data Hour Sample Taken 1 2 3 4…arrow_forwardSam’s Long Life 60-watt light bulbs are designed to have a life of 1,350 hours with tolerance of ± 340 hours. A recent representative sample from the process that makes these light bulbs revealed a mean of 1,290 hours, with a standard deviation of 94 hours. Compute a. Compute the process capability ratio and the process capability index, and comment on the overall capability of the process b. Explain to what extent the process for producing Sam’s Long Life 60-watt light bulbs would have to be improved to achieve 4-sigma quality. c. show detail workarrow_forwardLinda Boardman, Inc., an equipment manufacturer in Boston, has submitted a sample cutoff valve to improve your manufacturing process. Your process engineering department has conducted experiments and found that the valve has a mean of 8.00 and a standard deviation of .04. Your desired performance is = 8.0 ± 30, where o = 0.047. Is the following statement true or false? Can Boardman produce the valve within the specified tolerance? (TRUE=yes, it can; FALSE=no, it cannot) O True O Falsearrow_forward
- Plot the temperature of deuterium (in K ) as a function of pressure from 100 kPa to 10,000kPa at a constant specific volume of 0.1m³/kg.arrow_forwardC-Spec, Inc., is attempting to determine whether an existing machine is capable of milling an engine part that has a key specification of 5 ± 0.006 inches. After a trial run on this machine, C-Spec has determined that the machine has a sample mean of 5.001 inches with a standard deviation of 0.005 inch. Calculate the Cpk for this machine. (Round your answer to 3 decimal places.)arrow_forwardA process generating attribute data has an estimated sigma capability = 3.3. Assuming the process mean is shifted +/- 1.5 sigma from the target value, what is the estimated dpmo? Estimated dpmo = ____.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.