a)
To determine: The standard time for the operation.
Introduction: The amount of the dependency on human effort by an organization in terms of achieving its goals is given by the work design. It is directly linked to the productivity of an organization where good work design helps in achieving high productivity.
a)
Answer to Problem 9P
Explanation of Solution
Given information:
Performance rating | Observations (minutes per cycles) | Allowance | ||||
1 | 2 | 3 | 4 | 5 | ||
0.9 | 1.4 | 1.42 | 1.39 | 1.38 | 1.41 | 0.10 |
1.2 | 2.1 | 2.05 | 2 | 1.85 | 1.8 | 0.10 |
1.11 | 1.6 | 1.4 | 1.5 | 1.45 | 1.55 | 0.10 |
Formula:
Element | Performance rating | Observations (minutes per cycles) | Allowance | Observed time | Normal time | Afjob | Standard time | ||||
1 | 2 | 3 | 4 | 5 | |||||||
A | 0.9 | 1.4 | 1.42 | 1.39 | 1.38 | 1.4 | 0.10 | 1.4 | 1.26 | 1.10 | 1.39 |
B | 1.2 | 2.1 | 2.05 | 2 | 1.85 | 1.8 | 0.10 | 1.96 | 2.352 | 1.10 | 2.59 |
C | 1.11 | 1.6 | 1.4 | 1.5 | 1.45 | 1.6 | 0.10 | 1.5 | 1.665 | 1.10 | 1.83 |
Standard time for operation | 5.80 |
Calculation of standard time of operation:
Excel Worksheet:
Element A:
Normal time is calculated by multiplying observed timing, 1.4 and performance rating, 0.9 which yields 1.26 minutes.
Allowance factor is calculated by adding 1 with the allowance factor 0.10 to give 1.10.
Standard time for element A is calculated by multiplying normal time of 1.26 minutes with allowance factor of 1.10 which gives 1.39 minutes.
Same process applies for element B and C which yields the standard times as 2.59 and 1.83. The standard time for operation is obtained by adding 1.39, 2.59 and 1.83 minutes which gives 5.80 minutes.
Hence, the standard time for the operation is 5.80 minutes.
b)
To determine: The number of observations for element A
Introduction: The amount of the dependency on human effort by an organization in terms of achieving its goals is given by the work design. It is directly linked to the productivity of an organization where good work design helps in achieving high productivity.
b)
Answer to Problem 9P
Explanation of Solution
Given information:
Performance rating | Observations (minutes per cycles) | Allowance | ||||
1 | 2 | 3 | 4 | 5 | ||
0.9 | 1.4 | 1.42 | 1.39 | 1.38 | 1.41 | 0.10 |
1.2 | 2.1 | 2.05 | 2 | 1.85 | 1.8 | 0.10 |
1.11 | 1.6 | 1.4 | 1.5 | 1.45 | 1.55 | 0.10 |
Confidence= 98%
4% of true value
Formula:
Calculation of number of observations for element A:
In the above formula the sample standard deviation is calculated by,
Calculation of standard deviation:
Element A | Differences | Square of differences | Standard deviation |
1.4 | 0 | 0 | 0.015811 |
1.42 | 0.02 | 0.0004 | |
1.39 | -0.01 | 0.0001 | |
1.38 | -0.02 | 0.0004 | |
1.41 | 0.01 | 0.0001 | |
Mean=1.4 | SSQ=0.001 |
Excel worksheet:
Z value for confidence interval of 98% is 2.33.
The confidence interval
Using z = 2.33:
The number of observations from the standard z table for confidence level of 98% is calculated by dividing the product of 2.33 and 0.0158 with product of 0.04 and 1.40 and squaring the resultant which gives 0.4322. Rounding off the value it gives the number of observation as 1.
Hence, the number of observation is 1.
c)
To determine: The number of observations for element C.
Introduction: The amount of the dependency on human effort by an organization in terms of achieving its goals is given by the work design. It is directly linked to the productivity of an organization where good work design helps in achieving high productivity.
c)
Answer to Problem 9P
Explanation of Solution
Given information:
Performance rating | Observations (minutes per cycles) | Allowance | ||||
1 | 2 | 3 | 4 | 5 | ||
0.9 | 1.4 | 1.42 | 1.39 | 1.38 | 1.41 | 0.10 |
1.2 | 2.1 | 2.05 | 2 | 1.85 | 1.8 | 0.10 |
1.11 | 1.6 | 1.4 | 1.5 | 1.45 | 1.55 | 0.10 |
Confidence= 90%
0.10 minute of actual value.
Formula:
Calculation of number of observations for element C:
In the above formula the sample standard deviation is calculated by,
Calculation of standard deviation:
Element C | Differences | Square of differences | Standard deviation |
1.6 | 0.1 | 0.01 | 0.0791 |
1.4 | -0.1 | 0.01 | |
1.5 | 0 | 0 | |
1.45 | -0.05 | 0.0025 | |
1.55 | 0.05 | 0.0025 | |
Mean=1.5 | SSQ=0.025 |
Excel worksheet:
Z value for confidence interval of 90% is 1.65.
The confidence interval
- Using z = 1.64:
The number of observations from the standard z table for confidence level of 90 is calculated by dividing the product of 1.64 and 0.0791 with 0.10 and squaring the resultant which gives 1.6828.
- Using z = 1.65:
The number of observations from the standard z table for confidence level of 90 is calculated by dividing the product of 1.65 and 0.0791 with 0.10 and squaring the resultant which gives 1.7034.
Hence, the number of observations for element C is 2
Want to see more full solutions like this?
Chapter 7 Solutions
Operations Management
- . Given the following information, determine the sample sizeneeded if the standard time estimate is to be within 5 percent ofthe true mean 97 percent of the time. Work Element Standard Deviation (minutes) Mean Observed Time (minutes)l 0.20 1.102 0.10 0.803 0.15 0.904 0.10 1.00arrow_forwardEach year, Lord & Taylor, Ltd., sets up a giftwrapping station to assist its customers with holiday shopping. Preliminary observations of one worker at the stationproduced the following sample time (in minutes per package):3.5, 3.2, 4.1, 3.6, 3.9. Based on this small sample, what number of observations would be necessary to determine the truecycle time with a 95% confidence level and an accuracy of{5%?arrow_forwardK Claudine Soosay recorded the following times assembling a watch: Observation No. 1234567co 8 Time (minutes) 0.12 0.10 0.11 0.11 0.15 0.10 0.10 0.10 Observation No. 9 10 11 12 13 14 15 16 Time (minutes) 0.11 0.08 0.11 0.10 0.10 0.11 0.14 0.08arrow_forward
- 8. A teller at a drive-up window at a bank had the following service times (in minutes) for 20 randomly selected customers: SAMPLE 1 2 3 4 4.5 4.6 4.5 4.7 4.2 4.5 4.6 4.6 4.2 4.4 4.4 4.8 4.3 4.7 4.4 4.5 4.3 4.3 4.6 4.9 Select a chart to monitor the central tendency of the process, what are the 3-sigma control limits using a mean chart? Keep 3 decimal places. Select one: a. LCL = 4.212, UCL = 4.788 b. LCL = 4.414, UCL = 4.586 c. LCL = 4.245, UCL = 4.755 d. None of the other options. e. LCL = 4.385, UCL = 4.615arrow_forwarderations Management Spring21 Time left 1:09:19 stion In a fabric manufacturing factory, the quality control process using control charts from SPC. In an hour there are a total of 5 samples are taken each having 5 observations regarding the thickness of fabric in measured in millimeters. In a particular hour, the sample means (X-bar) are noted to be: 156.46, 199.62, 189.31, 102.22, and112.09 respectively. In the same sample, the corresponding ranges are: 11.97, 12.17, 13.94, 11.86, and 11.83 respectively. What are the lower and upper control limits for the X-bar chart? et ered ed out of O a. None is correct lag O b. 156.55, 170.47 tion O C. 144.77, 159.11 O d. 145.40, 190.72 O e. 143.55, 165.47 Of. 142.92, 160.66 Fi PREVIOUS PAGE NEXT PAGE O Type here to search %23arrow_forwardSupervisor Kenneth Peterson wants to determine the percent of time a machine in his area is idle. He decides to use work sampling, and his initial estimate is that the machine is idle 18% of the time. (Round all intermediate calculations to at least two decimal places before proceeding with further calculations.) Part 2 The number of observations that need to be taken by Peterson to be 98.00% confident that the results will be less than 6% from the true result = enter your response here (round your response to the immediate higher whole number).arrow_forward
- Bank manager Art Hill wants to determine the percentageof time that tellers are working and idle. He decides touse work sampling, and his initia l estimate is that the tellers a reid le 15% of the time. How many observations should Hill take tobe 95.45% confident that the results wi ll not be more than ± 4%from the true result?arrow_forward20. A teller at a drive-up window at a bank had the following service times (in minutes) for 20 randomly Chapter Ten Quality Control selected customers. SAMPLE 1 4. 4.5 4.6 4.5 4.7 4.2 4.5 4.6 4.6 4.2 4.4 4.4 4.8 4.3 4.7 4.4 4.5 4.3 4.3 4.6 4.9 a. Determine the mean of each sample. b. If the process parameters are unknown, estimate its mean and standard deviation. c. Estimate the mean and standard deviation of the sampling distribution. d. What would three-sigma control limits for the process be? What alpha risk would they provide? e. What alpha risk would control limits of 4.14 and 4.86 provide? f. Using limits of 4.14 and 4.86, are any sample means beyond the control limits? If so, which one(s)? g. Construct control limits? If so, which one(s)? ontrol charts for means and ranges using Table 10.3. Are any samples beyond the h. Explain why the control limits are different for means in parts d and g. i. If the process has a known mean of 4.4 and a known standard deviation of .18, what…arrow_forwardSupervisor Kenneth Peterson wants to detem1ine thepercentage of time a machine in his a rea is idle. He decides to usework sampling, and his initial estimate is that the machine is idle 20%of the time. How many observations should Peterson take to be 98%confident that the results will be Jess than 5% from the true results?arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.