a)
To determine: The standard time for the operation.
Introduction: The amount of the dependency on human effort by an organization in terms of achieving its goals is given by the work design. It is directly linked to the productivity of an organization where good work design helps in achieving high productivity.
a)
Answer to Problem 10P
Explanation of Solution
Given information:
Element | Performance rating | Observations (minutes per cycles) | Allowance | |||||
1 | 2 | 3 | 4 | 5 | 6 | |||
1 | 1.1 | 1.2 | 1.17 | 1.16 | 1.22 | 1.24 | 1.15 | 0.15 |
2 | 1.15 | 0.83 | 0.87 | 0.78 | 0.82 | 0.85 | 0 | 0.15 |
3 | 1.05 | 0.58 | 0.53 | 0.52 | 0.59 | 0.6 | 0.54 | 0.15 |
Formula:
Calculation of standard time of operation:
Element | Performance rating | Observations (minutes per cycles) | Allowance | Observed time | Normal time | Afjob | Standard time | |||||
1 | 2 | 3 | 4 | 5 | 6 | |||||||
1 | 1.1 | 1.2 | 1.17 | 1.16 | 1.22 | 1.24 | 1.15 | 0.15 | 1.198 | 1.317 | 1.15 | 1.52 |
2 | 1.15 | 0.83 | 0.87 | 0.78 | 0.82 | 0.85 | 0 | 0.15 | 0.83 | 0.954 | 1.15 | 1.10 |
3 | 1.05 | 0.58 | 0.53 | 0.52 | 0.59 | 0.6 | 0.54 | 0.15 | 0.564 | 0.592 | 1.15 | 0.68 |
Standard time for operation | 3.29 |
Excel Worksheet:
Element 1:
Observed time is calculated by taking mean for the 1.2, 1.17, 1.16, 1.22, 1.24 and 1.15 which gives 1.198.
Normal time is calculated by multiplying observed timing, 1.198 and performance rating, 1.1 which yields 1.317 minutes.
Allowance factor is calculated by adding 1 with the allowance factor 0.15 to give 1.15.
Standard time for element 1 is calculated by multiplying normal time of 1.317 minutes with allowance factor of 1.15 which gives 1.52 minutes.
Same process applies for element 2 and 3 which yields the standard times as 1.10 and 0.68. The standard time for operation is obtained by adding 1.52, 1.10 and 1.68 minutes which gives 3.29 minutes.
Hence, the standard time for the operation is 3.29 minutes.
b)
To determine: The number of observations for element 2.
Introduction: The amount of the dependency on human effort by an organization in terms of achieving its goals is given by the work design. It is directly linked to the productivity of an organization where good work design helps in achieving high productivity.
b)
Answer to Problem 10P
Explanation of Solution
Given information:
Element | Performance rating | Observations (minutes per cycles) | Allowance | |||||
1 | 2 | 3 | 4 | 5 | 6 | |||
1 | 1.1 | 1.2 | 1.17 | 1.16 | 1.22 | 1.24 | 1.15 | 0.15 |
2 | 1.15 | 0.83 | 0.87 | 0.78 | 0.82 | 0.85 | 0 | 0.15 |
3 | 1.05 | 0.58 | 0.53 | 0.52 | 0.59 | 0.6 | 0.54 | 0.15 |
Confidence= 95.5%
1% of true value
Formula:
Calculation of number of observations for element A:
In the above formula the sample standard deviation is calculated by,
Calculation of standard deviation:
Element 2 | Differences | Square of differences | Standard deviation |
0.83 | 0 | 0 | 0.0339 |
0.87 | 0.04 | 0.0016 | |
0.78 | -0.05 | 0.0025 | |
0.82 | -0.01 | 0.0001 | |
0.85 | 0.02 | 0.0004 | |
Mean=0.83 | SSQ=0.0046 |
Excel worksheet:
Z value for confidence interval of 95.5% is 2.00.
The confidence interval
- Using z = 2.00:
The number of observations from the standard z table for confidence level of 95.5% is calculated by dividing the product of 2.00 and 0.0339 with product of 0.01 and 0.83 and squaring the resultant which gives 66.7272.
- Using z = 2.01:
The number of observations from the standard z table for confidence level of 95.5% is calculated by dividing the product of 2.01 and 0.0339 with product of 0.01 and 0.83 and squaring the resultant which gives 67.3962.
Hence, the number of observation is 68.
c)
To determine: The number of observations needed to estimate the mean time for element 2 within 0.01 minute of its true value.
Introduction: The amount of the dependency on human effort by an organization in terms of achieving its goals is given by the work design. It is directly linked to the productivity of an organization where good work design helps in achieving high productivity.
c)
Answer to Problem 10P
Explanation of Solution
Given information:
Element | Performance rating | Observations (minutes per cycles) | Allowance | |||||
1 | 2 | 3 | 4 | 5 | 6 | |||
1 | 1.1 | 1.2 | 1.17 | 1.16 | 1.22 | 1.24 | 1.15 | 0.15 |
2 | 1.15 | 0.83 | 0.87 | 0.78 | 0.82 | 0.85 | 0 | 0.15 |
3 | 1.05 | 0.58 | 0.53 | 0.52 | 0.59 | 0.6 | 0.54 | 0.15 |
Confidence= 95.5%
0.10 minute of actual value.
Formula:
Calculation of number of observations for element C:
In the above formula the sample standard deviation is calculated by,
Z value for confidence interval of 95.5% is 2.00.
The confidence interval
- Using z = 2.00:
The number of observations from the standard z table for confidence level of 95.5 is calculated by dividing the product of 2.00 and 0.0339 with 0.01 and squaring the resultant which gives 45.9684.
- Using z = 2.00:
The number of observations from the standard z table for confidence level of 95.5 is calculated by dividing the product of 2.01 and 0.0339 with 0.01 and squaring the resultant which gives 46.4292.
Hence, the number of observations needed to estimate the mean time for element 2 within 0.01 minute of its true value is 46.
Want to see more full solutions like this?
Chapter 7 Solutions
Operations Management
- What would typically happen if an abnormally short time was recorded when conducting a stopwatch time study? a) It would be included in the study. b) It would be discarded. c) It would be factored by the performance rating. d) Inform the supervisor of the abnormality.arrow_forwardCompare stopwatch time study and work sampling.arrow_forwardwhat are the disadvantages of using work sampling to develop time standards for standard, repetitive operations?arrow_forward
- Virginia College promotes a wide variety of executive training courses for firms in the Arlington, Virginia, region. Director Wendy Tate believes that individually typed letters add a personal touch to marketing. To prepare letters for mailing, she conducts a time study of her secretaries. On the basis of the observations shown in the following table, she wishes to develop a time standard for the whole job. Performance Observation (minutes per cycle) Element Rating 1 2 3 4 5 6 Typing letter 80 % 2.6 3.5 2.9 2.0 2.5 3.2 Typing envelope 110 % 0.9 0.7 0.6 0.7 3.2 * 0.8 Stuffing envelope 90 % 0.4 0.5 1.8 * 0.2 0.5 0.6 Sealing, sorting…arrow_forwardWhat situations call for the use of work sampling instead of time study?arrow_forwardThe Dubuque Cement Company packs 80-pound bags of concrete mix. Time-study data for the filling activity are shown in the following table. Because of the high physical demands of the job, the company's policy is a 20% allowance for workers. (Round all intermediate calculations to two decimal places before proceeding with further calculations.) Performance Observation (seconds) Element Rating 1 2 3 4 5 Grasp and place bag 105 % 8 10 9 12 6 Fill bag 85 % 36 40 39 36 114 * Seal bag 105 % 14 17 13 19 17 Place bag on conveyor 85 % 7 6 9 30 ^ 34 ^ * Bag breaks open; included as delay in the allowance factor ^ Conveyor…arrow_forward
- The Dubuque Cement Company packs 80-pound bags of concrete mix. Time-study data for the filling activity are shown in the following table. Because of the high physical demands of the job, the company's policy is a 20% allowance for workers. (Round all intermediate calculations to two decimal places before proceeding with further calculations.) Performance Observation (seconds) Element Rating 1 2 3 4 5 Grasp and place bag 105 % 8 10 9 12 6 Fill bag 85 % 36 40 39 36 114 * Seal bag 105 % 14 17 13 19 17 Place bag on conveyor 85 % 7 6 9 30 ^ 34 ^ * Bag breaks open; included as delay in the allowance factor ^ Conveyor…arrow_forwardAn analyst made 30 observations over 15 minutes during which 12 units where produced. For 9 observations, the worker was seen working. Compute for the observed time.arrow_forwardII. Exercise You have been asked to develop a work sample for a receptionist position in a three-person law firm. The lawyers believe this might be the best way to evaluate applicants, especially because they are seeking someone with a disability and they do not believe in the practical credibility of standardized measures. 1. What information do you need to design the work sample? 2. What materials do you need? 3. What are the criteria for your observation schedule as the consumer performs the work sample?arrow_forward
- Management of Mittel Rhein AG of Köln, Germany, would like to reduce the amount of time between when a customer places an order and when the order is shipped. For the first quarter of operations during the current year the following data were reported: Inspection time- 0.7 daysWait time (from order to start of production) -16.6 daysProcess time -2.7 daysMove time -1.3 daysQueue time- 4.5 daysRequired:1. Compute the throughput time. (Round your answer to 1 decimal place.) 2. Compute the manufacturing cycle efficiency (MCE) for the quarter. (Round your answer to the nearest whole percentage (i.e., 0.12 should be entered as 12).) 3. What percentage of the throughput time was spent in non–value-added activities? (Round your answer to the nearest whole percentage (i.e., 0.12 should be entered as 12).) 4. Compute the delivery cycle time. (Round your intermediate calculations and final answer to 1 decimal place.) 5. If by using Lean Production all queue…arrow_forwardExplain a systematic way to analyze a process. ( 6 steps)?arrow_forwardWhen quoting vehicle modifications, how is an estimate presented to the customer? (30-50 words)arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.