EBK PRINCIPLES OF OPERATIONS MANAGEMENT
10th Edition
ISBN: 8220102744059
Author: HEIZER
Publisher: PEARSON
expand_more
expand_more
format_list_bulleted
Question
Chapter 10, Problem 25P
a)
Summary Introduction
To determine: The normal time for the operation
Introduction: Time study is the basis that helps set the standard time; it would time a sample of the performance of the worker.
b)
Summary Introduction
To determine: The standard time for the operation.
Introduction: Time study is the basis that helps set the standard time, it would time a sample of the performance of the worker.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Latisha Simmons, a loan processor at Wentworth Bank, has been timed performing four work
elements, with the results shown in the following table.
Task
Element
1
2
3
4
Performance
Rating
110%
85%
90%
85%
1
0.6
0.6
0.5
1.4
Observation (minutes per cycle)
2
3
4
0.3
0.8
0.5
1.9
0.6
0.7
0.6
1.9
0.4
0.6
0.5
1.7
The allowances for tasks such as this are personal, 8%; fatigue, 12%; and delay, 3%.
minutes (round your response to two
a) The normal time for the complete operation :
=
decimal places).
b) The standard time for this process = minutes (round your response to two decimal
places).
0.5
0.8
0.5
1.4
State and describe some of the limitations of time study method ?
K
Latisha Simmons, a loan processor at Wentworth Bank, has been timed performing four work elements,
with the results shown in the following table.
Task
Element
1
2
3
4
Performance
Rating
115%
95%
85%
80%
1
0.5
0.6
0.7
1.6
Observation (minutes per cycle)
2
3
4
0.4
0.9
0.4
1.9
0.5
0.7
0.6
2.1
0.3
0.6
0.4
1.7
5
0.3
0.7
0.4
1.5
The allowances for tasks such as this are personal, 8%; fatigue, 10%; and delay, 2%.
a) The normal time for the complete operation =
minutes (round your response to two decimal places).
b) The standard time for this process = minutes (round your response to two decimal places).
Chapter 10 Solutions
EBK PRINCIPLES OF OPERATIONS MANAGEMENT
Ch. 10 - Prob. 1EDCh. 10 - Prob. 1DQCh. 10 - Prob. 2DQCh. 10 - Prob. 3DQCh. 10 - Prob. 4DQCh. 10 - Prob. 5DQCh. 10 - Prob. 6DQCh. 10 - Prob. 7DQCh. 10 - Prob. 8DQCh. 10 - Prob. 9DQ
Ch. 10 - Prob. 10DQCh. 10 - Prob. 11DQCh. 10 - Prob. 12DQCh. 10 - Prob. 13DQCh. 10 - Prob. 14DQCh. 10 - Prob. 1PCh. 10 - Prob. 2PCh. 10 - Prob. 3PCh. 10 - Prob. 4PCh. 10 - Prob. 5PCh. 10 - Prob. 6PCh. 10 - Prob. 7PCh. 10 - Prob. 8PCh. 10 - Prob. 9PCh. 10 - Prob. 10PCh. 10 - Prob. 11PCh. 10 - Prob. 12PCh. 10 - Prob. 13PCh. 10 - Prob. 14PCh. 10 - Prob. 15PCh. 10 - Prob. 16PCh. 10 - Prob. 17PCh. 10 - Prob. 18PCh. 10 - Prob. 19PCh. 10 - Prob. 20PCh. 10 - Prob. 21PCh. 10 - Prob. 22PCh. 10 - Virginia College promotes a wide variety of...Ch. 10 - Prob. 24PCh. 10 - Prob. 25PCh. 10 - Prob. 26PCh. 10 - Prob. 27PCh. 10 - Prob. 28PCh. 10 - Prob. 29PCh. 10 - Prob. 30PCh. 10 - Prob. 31PCh. 10 - Prob. 32PCh. 10 - Prob. 33PCh. 10 - Prob. 34PCh. 10 - Prob. 35PCh. 10 - Prob. 36PCh. 10 - Prob. 37PCh. 10 - Prob. 38PCh. 10 - Prob. 1CSCh. 10 - Prob. 2CSCh. 10 - Prob. 3CSCh. 10 - Prob. 4CSCh. 10 - Prob. 1.1VCCh. 10 - Prob. 1.2VCCh. 10 - Prob. 1.3VCCh. 10 - Prob. 2.1VCCh. 10 - Prob. 2.2VCCh. 10 - Prob. 2.3VCCh. 10 - Prob. 2.4VC
Knowledge Booster
Similar questions
- Peter Rourke, a loan processor a t Wentworth Bank,has been timed performing four work elements, with the resultsshown in the fo llowing table. The allowances for tasks such asth is are personal, 7%; fa tigue, 10%; and delay, 3%. a) What is the normal time?b) What is the standard time?arrow_forwardInstalling mufflers at the O'Sullivan Garage in Golden, Colorado, involves five work elements. Jill O'Sull ivanhas timed workers performing these tasks seven times, with the results shown in the following table: By agreement with her workers, Jill allows a 10% fatigue factor and a 10% personal-time factor, but no time for delay. To compute standard time for the work operatio n, Jill excludes all observations that a ppear to be unusual or nonrecurring. She does not want an error of mo re than ±5%.a) What is the standard time for the task?b) How many observations are needed to assu re a 95% confidence level?arrow_forward6- A time study on a manual work eycle was taken by observing times. There are three regular elements in the work eycle as follows: a, b, and d. Element e is an iregular element performed every 4 cycles. Observed times and performance ratings of the elements are also given in the figure. Determine a. the normal time b. the standard time for the work cycle, using an allowance factor of 25%. Select your choice according to part a and b's answer where both of them must be true. Work element Observed time Performance rating a b d 0,52min 0,25 min 1,20 min 0,26 min 80% 75% 92% 100% a) a:1.9675; b:1.9675 b) a:1.1395; b:1.1395 c) a: 1.1395; b:1.4814 d) a: 1.1395; b:1.4244 e) a: 1.9675; b:2.4594arrow_forward
- Describe some of the limitations of time study method ?arrow_forwardThe ISME Department at WSU promotes its industrial engineering program by mailing thousands of individually composed and typed letters to prospective students and their families. A time study has been conducted on teh task of preparing the letters for mailing (see data in the table below). WSU's personal, delay, and fatigue allowance factor is 13% of the shift time. What is the standard time of the overall job studied? Write your answer with one decimal point. Observations in Minutes Job Element (A) Compose and type letter (B) Type envelope address 2 1 2 3 4 5 Performance Rating 7 9 8 1 2 118 1 3 1 100 (C) Stuff, stamp, seal, and sort envelopes 1 4 2 1 111 Correct Answer: 11.46±1arrow_forwardFind out the standard time using the following data: Average time for machine elements = 6 min. Average time for manual elements = 3 min. Performance rating =110% Allowances = 11%arrow_forward
- Please don't copyarrow_forwardAfter training, Mary Fernandez, a computer tech-nician, had an average observed time for memory-chip tests of 12 seconds. Mary’s performance rating is 100%. The firm has apersonal fatigue and delay allowance of 15%.a) Find the normal time for this process.b) Find the standard time for this process.arrow_forwardCompany ABC received an order to produce 14 units of a new product. A 75% improvement curve was expected for this project. Since the customer was satisfied with the quality in the first 14 units, ABC received an order for 16 additional units. It was calculated that these new units (last 16 units) will take 556.50 hours to produce. Based on all the information so far, the time to produce the 16th unit was approximately: Add your answer Integer, decimal, or E notation allowedarrow_forward
- Following are the observations (in minutes) for four elements of a task. Element 1 AWNI 2 3 4 Element 1 NM 4 2 1 4.8 3 3.5 2.6 2 4.8 1.1 3.1 2.7 от Cycle 3 4.2 3.5 2.6 4 4.4 1.5 3.0 2.8 5 4.6 Determine the observed time (OT) for each element. Note: The second element occurs only in every other cycle. (Round the final answers to 2 decimal places.) - 3.1 2.8 5.0 6 4.1 1.5 3.5 2.4arrow_forward6. A process at a watch assembly plant has been changed. The process is divided into three work elements (see table below). A time study has been performed with the following results. The time standard for the process previously was 14.5 minutes. Based on the new time study, should the time standard be revised (essay & calculation format)? The new time study had an initial sample of four observations, with the results shown in the following table. The performance rating factor (RF) is shown for each element, and the allowance for the whole process is 18 percent of the total normal time. Element 1 Element 2 Element 3 Obs 1 Obs 2 2.60 2.34 4.94 4.78 2.18 1.98 Obs 3 3.12 5.10 2.13 Obs 4 2.86 4.68 2.25 Average (min) 2.730 4.875 2.135 RF Normal Time 1.0 1.1 0.9 2.730 5.363 1.922arrow_forwardExplain the steps involved in conducting a time study,and discuss any difficulties you might envision at varioussteps.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.