Facility layout study. Facility layout and material flowpath design are major factors in the productivity analysis of automated manufacturing systems. Facility layout is concerned with the location arrangement of machines and buffers for work-in-process. Flowpath design is concerned with the direction of manufacturing material flows (e.g., unidirectional or bidirectional; Lee, Lei, and Pinedo. Annals of Operations Research, 1997). A manufacturer of printed circuit boards is interested in evaluating two alternative existing layout and flowpath designs. The output of each design was monitored for 8 consecutive working days. The data (shown here) are saved in the file. Design 2 appears to be superior to Design 1. Do you agree? Explain fully.
Working Days | Design 1 (units) | Design 2 (units) |
8/16 | 1,220 | 1,273 |
8/17 | 1,092 | 1,363 |
8/18 | 1,136 | 1,342 |
8/19 | 1,205 | 1,471 |
8/20 | 1,086 | 1,299 |
8/23 | 1,274 | 1,457 |
8/24 | 1,145 | 1,263 |
Want to see the full answer?
Check out a sample textbook solutionChapter 8 Solutions
Statistics for Business and Economics (13th Edition)
- A quality control engineer studied the relationship between years of experience as a system control engineer and the capacity of the engineer to complete within a given time a complex control design including the debugging of all computer programs and control devices. A group of 25 engineers having widely differing amounts of experience (measured in months of experience) was given the same control design project. The results of the study are given in the following table with y 5 1 if the project was successfully completed in the allocated time and y 5 0 if the project was not successfully completed. a. Determine whether experience is associated with the probability of completing the task. b. Compute the probability of successfully completing the task for an engineer havingarrow_forwardA manager of inventory systems believes that inventory models are important decision- making tools. The manager often uses an Economic Order Quantity policy, but has never considered a backorder model, because the company has always treated backorders as a bad practice to be avoided. However, with upper management's continued pressure to cut costs, you have been asked to analyze the economics of a backorder policy for some products. A specific product has annual demand of 800 units, an order cost of $150/order, an annual holding cost of $3/item, and a backorder cost of $20/item. Your task it to determine the annual savings, when compared with an EOQ model, that backorders would allow. Assume 250 working days per year.arrow_forwardHow is co-ordination achieved in team-based, project-based and process-based structures?arrow_forward
- Quantitative research: A. Emphasizes how a participant in a given setting constructs the world around the participant B. Involves data that are contained in context C. Involves data that have the potential for revealing complexities D. Emphasizes the answer to a specific research quotaarrow_forwardPlease answer C. and D. Palisades Eco-Park is a small ecological reserve that admits a relatively small number of visitors on any day, but provides both educational and entertaining lectures, exhibitions, and opportunities to observe nature. The company has collected the following data on labor costs and number of visitors to the park over the last 30 months. Month Labor Cost Visitors 1 $ 25,820 1,700 2 $ 36,290 2,592 3 $ 39,968 2,811 4 $ 31,648 2,222 5 $ 34,809 2,373 6 $ 32,672 2,181 7 $ 32,023 2,205 8 $ 38,334 2,676 9 $ 38,568 2,760 10 $ 46,933 3,572 11 $ 42,157 2,976 12 $ 39,030 2,804 13 $ 34,444 2,415 14 $ 33,173 2,336 15 $ 36,971 2,508 16 $ 26,500 2,099 17 $ 30,663 3,397 18 $ 29,961 2,786 19 $ 27,590 2,412 20 $ 30,003 2,972 21 $ 25,692 2,000 22 $ 24,655 1,794 23 $ 28,892 3,267 24 $ 30,153 3,817 25 $ 28,119 2,592 26 $ 31,690 3,274 27 $ 28,651 2,989 28 $ 29,927 3,050 29 $ 28,438 2,511 30 $ 27,874 2,075…arrow_forwardIf data set has a relationtionship that is best described by a linear model, then the residual plot willarrow_forward
- Identify an LP problem and construct a model that describes it. Make sure to include the following: 1. Quick discussion on what motivates you to choose that problem; 2. Define the problem; 3. Define the variables;arrow_forwardNO chatgpt, solve by hand, and provide all graphs , tables, and visualzaions.arrow_forwardThe Lawson Fabric Mill Produces five different fabrics. Each fabric can be woven on one or more of the mill’s 36 looms. The sales department’s forecast of demand for the next month is shown in below Table 1, along with data on the selling price per yard, variable cost per yard, and purchase price per yard. The mill operates 24 hours a day and is scheduled for 30 days during the coming month. The mill has two types of looms: draw and regular. The draw looms are more versatile and can be used for all five fabrics. The regular looms can produce only three of the fabrics. The mill has a total of 36 looms: 8 are draw and 28 are regular. The rate of production for each fabric on each type of loom is given in below Table 2. The time required to change over from producing one fabric to another is negligible and does not have to be considered. The Lawson Fabric Mill satisfies all demand with either its own fabric or fabric purchased from another mill. Fabrics that cannot be woven at the…arrow_forward
- Charity Navigator is America's leading independent charity evaluator. The following data show the total expenses (), the percentage of the total budget spent on administrative expenses, the percentage spent on fundraising expenses, and the percentage spent on program expenses for supersized charities. Administrative expenses include overhead, administrative staff and associated costs, and organizational meetings. Fundraising expenses are what a charity spends to raise money, and program expenses are what the charity spends on the programs and services it exists to deliver. The sum of the three percentages does not add to because of rounding. # Charity Total Expenses($) AdministrativeExpenses(%) FundraisingExpenses(%) ProgramExpenses(%) 1 American Red Cross 3,354,177,445 3.9 3.8 92.1 2 World Vision 1,205,887,020 4.0 7.5 88.3 3 Smithsonian Institution 1,080,995,083 23.5 2.6 73.7 4 Food For The Poor 1,050,829,851 0.7 2.4 96.8 5 American…arrow_forwardThe table below gives adult wine consumption.arrow_forward*NEED HELP WITH 1, 2, and 3*DYNAMIC INVENTORY MODELSPLEASE WALK THROUGH WITH EXCEL IF POSSIBLE, PLEASE!Mohawk Industries builds transmissions for a large automobile manufacturer. One of its transmissionassemblies requires part #HD234, purchased from a supplier within the same industrial park. Because ofthe close proximity of its supplier, the lead me for part #HD234 is negligible.The demand for part #HD234 varies according to the orders received from the automobile manufacturer.The requirements schedule for the next 10 periods is shown below: Period 1 2 3 4 5 6 7 8 9 10 Total Demand 115 50 175 95 150 225 75 70 40 20 1,015 This requirements schedule is considered fairly typical. Furthermore, the cost of placing an order with anearby supplier is $85.00, the purchase cost is $65.00, and the holding cost fracon is 0.01 per period.Mohawk is in the process of assessing different lot-sizing policies. It is interested in several that havebeen suggested.Before it can decide among them,…arrow_forward
- MATLAB: An Introduction with ApplicationsStatisticsISBN:9781119256830Author:Amos GilatPublisher:John Wiley & Sons IncProbability and Statistics for Engineering and th...StatisticsISBN:9781305251809Author:Jay L. DevorePublisher:Cengage LearningStatistics for The Behavioral Sciences (MindTap C...StatisticsISBN:9781305504912Author:Frederick J Gravetter, Larry B. WallnauPublisher:Cengage Learning
- Elementary Statistics: Picturing the World (7th E...StatisticsISBN:9780134683416Author:Ron Larson, Betsy FarberPublisher:PEARSONThe Basic Practice of StatisticsStatisticsISBN:9781319042578Author:David S. Moore, William I. Notz, Michael A. FlignerPublisher:W. H. FreemanIntroduction to the Practice of StatisticsStatisticsISBN:9781319013387Author:David S. Moore, George P. McCabe, Bruce A. CraigPublisher:W. H. Freeman