Unused capacity, activity-based costing, activity-based management. Zarson’s Netballs is a manufacturer of high-quality basketballs and Volleyballs. Setup costs are driven by the number of setups. Equipment and maintenance costs increase with the number of machine-hours, and lease rent is paid per square foot. Capacity of the facility is 14,000 square feet, and Zarson is using only 80% of this capacity. Zarson records the cost of unused capacity as a separate line item and not as a product cost. The following is the budgeted information for Zarson:
Zarson’s Netballs Budgeted Costs and Activities For the Year Ended December 31, 2017 | |
Direct materials—basketballs | $ 168,100 |
Direct materials—Volleyballs | 303,280 |
Direct manufacturing labor—basketballs | 111,800 |
Direct manufacturing labor—Volleyballs | 100,820 |
Setup | 157,500 |
Equipment and maintenance costs | 115,200 |
Lease rent | 120,000 |
Total | $1,166,700 |
Other budget information follows:
Basketballs | Volleyballs | |
Number of balls | 58,000 | 85,000 |
Machine-hours | 13,500 | 10,500 |
Number of setups | 450 | 300 |
Square footage of production space used | 3,200 | 8,000 |
- 1. Calculate the budgeted cost per unit of cost driver for each indirect cost pool.
Required
- 2. What is the budgeted cost of unused capacity?
- 3. What is the budgeted total cost and the cost per unit of resources used to produce (a) basketballs and (b) Volleyballs?
- 4. Why might excess capacity be beneficial for Zarson? What are some of the issues Zarson should consider before increasing production to use the space?
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Zarson’s Netballs is a manufacturer of high-quality basketballs and volleyballs. Setup costs are driven by the number of setups. Equipment and maintenance costs increase with the number of machine-hours, and lease rent is paid per square foot. Capacity of the facility is 14,000 square feet, and Zarson is using only 80% of this capacity. Zarson records the cost of unused capacity as a separate line item and not as a product cost. The following is the budgeted information for Zarson
Zarson’s Netballs Budgeted Costs and Activities For the Year Ended December 31, 2017
Direct materials—basketballs $ 168,100
Direct materials—volleyballs 303,280
Direct manufacturing labor—basketballs 111,800
Direct manufacturing labor—volleyballs…
Zarson’s Netballs is a manufacturer of high-quality basketballs and volleyballs. Setup costs are driven by the number of setups. Equipment and maintenance costs increase with the number of machine-hours, and lease rent is paid per square foot. Capacity of the facility is 14,000 square feet, and Zarson is using only 80% of this capacity. Zarson records the cost of unused capacity as a separate line item and not as a product cost. The following is the budgeted information for Zarson
Zarson’s Netballs Budgeted Costs and Activities For the Year Ended December 31, 2017
Direct materials—basketballs $ 168,100
Direct materials—volleyballs 303,280
Direct manufacturing labor—basketballs 111,800
Direct manufacturing labor—volleyballs…
Zarson’s Netballs is a manufacturer of high-quality basketballs and volleyballs. Setup costs are driven by the number of setups. Equipment and maintenance costs increase with the number of machine-hours, and lease rent is paid per square foot. Capacity of the facility is 14,000 square feet, and Zarson is using only 80% of this capacity. Required. Zarson records the cost of unused capacity as a separate line item and not as a product cost. The following is the budgeted information for Zarson:(RESOURCE IN PICTURE ATTATCHED)
Q. Calculate the budgeted cost per unit of cost driver for each indirect cost pool.
Chapter 5 Solutions
Horngren's Cost Accounting: A Managerial Emphasis (16th Edition)
Ch. 5 - What is broad averaging, and what consequences can...Ch. 5 - Why should managers worry about product...Ch. 5 - What is costing system refinement? Describe three...Ch. 5 - What is an activity-based approach to designing a...Ch. 5 - Describe four levels of a cost hierarchy.Ch. 5 - Why is it important to classify costs into a cost...Ch. 5 - What are the key reasons for product cost...Ch. 5 - Prob. 5.8QCh. 5 - Department indirect-cost rates are never...Ch. 5 - Prob. 5.10Q
Ch. 5 - Prob. 5.11QCh. 5 - Prob. 5.12QCh. 5 - Activity-based costing is the wave of the present...Ch. 5 - Increasing the number of indirect-cost pools is...Ch. 5 - The controller of a retail company has just had a...Ch. 5 - Conroe Company is reviewing the data provided by...Ch. 5 - Prob. 5.17MCQCh. 5 - Cost hierarchy. Roberta, Inc., manufactures...Ch. 5 - ABC, cost hierarchy, service. (CMA, adapted)...Ch. 5 - Alternative allocation bases for a professional...Ch. 5 - Plant-wide, department, and ABC Indirect cost...Ch. 5 - Plant-wide, department, and activity-cost rates....Ch. 5 - ABC, process costing. Sander Company produces...Ch. 5 - Department costing, service company. DLN is an...Ch. 5 - Activity-based costing, service company....Ch. 5 - Activity-based costing, manufacturing. Decorative...Ch. 5 - ABC, retail product-line profitability. Fitzgerald...Ch. 5 - Prob. 5.28ECh. 5 - Activity-based costing. The job-costing system at...Ch. 5 - ABC, product costing at banks,...Ch. 5 - Problems 5-31 Job costing with single direct-cost...Ch. 5 - Job costing with multiple direct-cost categories,...Ch. 5 - Job costing with multiple direct-cost categories,...Ch. 5 - First-stage allocation, time-driven activity-based...Ch. 5 - First-stage allocation, time-driven activity-based...Ch. 5 - Department and activity-cost rates, service...Ch. 5 - Activity-based costing, merchandising. Pharmahelp,...Ch. 5 - Choosing cost drivers, activity-based costing,...Ch. 5 - ABC, health care. Crosstown Health Center runs two...Ch. 5 - Unused capacity, activity-based costing,...Ch. 5 - Unused capacity, activity-based costing,...Ch. 5 - ABC, implementation, ethics. (CMA, adapted) Plum...Ch. 5 - Activity-based costing, activity-based management,...
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, accounting and related others by exploring similar questions and additional content below.Similar questions
- Zarson’s Netballs is a manufacturer of high-quality basketballs and volleyballs. Setup costs are driven by the number of setups. Equipment and maintenance costs increase with the number of machine-hours, and lease rent is paid per square foot. Capacity of the facility is 14,000 square feet, and Zarson is using only 80% of this capacity. Required. Zarson records the cost of unused capacity as a separate line item and not as a product cost. The following is the budgeted information for Zarson:(RESOURCE IN PICTURE ATTATCHED) Q.What is the budgeted cost of unused capacity?arrow_forwardZarson’s Netballs is a manufacturer of high-quality basketballs and volleyballs. Setup costs are driven by the number of setups. Equipment and maintenance costs increase with the number of machine-hours, and lease rent is paid per square foot. Capacity of the facility is 14,000 square feet, and Zarson is using only 80% of this capacity. Required. Zarson records the cost of unused capacity as a separate line item and not as a product cost. The following is the budgeted information for Zarson:(RESOURCE IN PICTURE ATTATCHED) Q. What is the budgeted total cost and the cost per unit of resources used to produce (a) basketballs and (b) volleyballs?arrow_forwardTheory of constraints, throughput margin, and relevant costs. Washington Industries manufactures electronic testing equipment. Washington also installs the equipment at customers’ sites and ensures that it functions smoothly. Additional information on the manufacturing and installation departments is as follows (capacities are expressed in terms of the number of units of electronic testing equipment): Washington manufactures only 250 units per year because the installation department has only enough capacity to install 250 units. The equipment sells for $55,000 per unit (installed) and has direct material costs of $30,000. All costs other than direct material costs are fixed. The following requirements refer only to the preceding data. There is no connection between the requirements.arrow_forward
- Whitewater Adventures manufactures two models of kayaks, Basic and Deluxe, using a combination of machining and hand finishing. Machine setup costs are driven by the number of setups. Indirect manufacturing labor costs increase with direct manufacturing labor costs. Equipment and maintenance costs increase with the number of machine-hours, and facility rent is paid per square foot. Capacity of the facility is 6,250 square feet, and Whitewater is using only 80% of this capacity. Whitewater records the cost of unused capacity as a separate line item and not as a product cost. For the current year, Whitewater has budgeted the following: Scenario 1 Whitewater Adventures Budgeted Costs and Activities For the Year Ended December 31, 2023 Direct materials-Basic kayaks Direct materials-Deluxe kayaks Direct manufacturing labor-Basic kayaks Direct manufacturing labor-Deluxe kayaks Indirect manufacturing labor costs Machine setup costs Equipment and maintenance costs Facility Rent Total Other…arrow_forwardKelson Sporting Equipment, Inc., makes two types of baseball gloves: a regular model and a catchers model. The firm has 900 hours of production time available in its cutting and sewing department, 300 hours available in its finishing department, and 100 hours available in its packaging and shipping department. The production time requirements and the profit contribution per glove are given in the following table: Assuming that the company is interested in maximizing the total profit contribution, answer the following: a. What is the linear programming model for this problem? b. Develop a spreadsheet model and find the optimal solution using Excel Solver. How many of each model should Kelson manufacture? c. What is the total profit contribution Kelson can earn with the optimal production quantities? d. How many hours of production time will be scheduled in each department? e. What is the slack time in each department?arrow_forwardThe management of Hartman Company is trying to determine the amount of each of two products to produce over the coming planning period. The following information concerns labor availability, labor utilization, and product profitability: a. Develop a linear programming model of the Hartman Company problem. Solve the model to determine the optimal production quantities of products 1 and 2. b. In computing the profit contribution per unit, management does not deduct labor costs because they are considered fixed for the upcoming planning period. However, suppose that overtime can be scheduled in some of the departments. Which departments would you recommend scheduling for overtime? How much would you be willing to pay per hour of overtime in each department? c. Suppose that 10, 6, and 8 hours of overtime may be scheduled in departments A, B, and C, respectively. The cost per hour of overtime is 18 in department A, 22.50 in department B, and 12 in department C. Formulate a linear programming model that can be used to determine the optimal production quantities if overtime is made available. What are the optimal production quantities, and what is the revised total contribution to profit? How much overtime do you recommend using in each department? What is the increase in the total contribution to profit if overtime is used?arrow_forward
- Soneva Enterprise manufactures two models of boats- Regular & Deluxe, using a combination of hand finishing and machining. Machine setup costs are driven by the number of setups. Indirect labor cost increase with direct labor costs. Equipment and maintenance costs increase with the number of machine hours, and facility rent is paid per square foot. The capacity of the facility is 6250 square foot and Soneva is using only 80% of this capacity. Soneva records the cost of unused capacity as a separate line item and not as a product cost. For 2021, Soneva has budgeted the following: Soneva Adventures- Budgeted Costs & Activities (Year Ending 31st March 2021) Particulars Amount (in Rs.) Direct Materials- Regular Boats 3,250,000 Direct Materials- Deluxe Boats 2,400,000 Direct Labour- Regular Boats 1,100,000 Direct Labour- Deluxe Boats 1,300,000 Indirect Labour Costs 720,000 Machine Setup Costs 405,000 Equipment and Maintenance Costs…arrow_forwardChoose the letter of answer: Hilby, Inc., uses the high-low method to analyze cost behavior. The company observed that at 12,000 machine hours of activity, total maintenance costs averaged P7.00 per hour. When activity jumped to 15,000 machine hours, which was still within the relevant range, the average cost per machine hour totaled P6.40. On the basis of this information, the variable cost per machine hour was: a. P4.00.b. P6.40.c. P6.70.d. P7.00.arrow_forwardMiller Toy Company manufactures a plastic swimming pool at its Westwood Plant. The standard cost for one pool is as follows: Standard Quantity or Hours 1.40 kilograms Standard Cost $5.60 0.90 hours 0.30 machine-hours Direct materials Direct labour Variable manufacturing overhead Total standard cost Sales (15,200 pools) Less: Variable expenses: Variable cost of goods sold* Variable selling expenses Total variable expenses Contribution margin Less: Fixed expenses: Manufacturing overhead Selling and administrative The plant has been experiencing problems for some time, as is shown by its June income statement when it made and sold 15,200 pools; the normal volume is 15,350 pools per month. Fixed costs are allocated using machine-hours. Total fixed expenses Net income Material price variance Material quantity variance Labour rate variance Labour efficiency variance Variable overhead spending variance Variable overhead efficiency variance *Contains direct materials, direct labour, and…arrow_forward
- Not Too Much Water, LLC, a manufacturer of orchid pots, incurs only fixed and variable costs in its operations. When 15,000 orchid pots are produced, the company’s managerial accountant noted a fixed cost per pot of $7.50 and a variable cost per pot of $8.35. If production is expected to increase, which of the following statements is TRUE? Select one: a. The fixed cost per pot will not change; the variable cost per pot will decrease. b. Total fixed costs will decrease; the variable cost per pot will not change. c. The fixed cost per pot will decrease; the variable cost per pot will increase. d. Total fixed costs will remain unchanged; total variable costs will increase. e. More than one of the above statements is true.arrow_forwardThornton Industries has 2,700 defective units of product that already cost $28 each to produce. A salvage company will purchase the defective units as is for $12 each. Thornton's production manager reports that the defects can be corrected for $20 per unit, enabling them to be sold at their regular market price of $28. The $28 per unit is a: Multiple Choice Sunk cost. Opportunity cost. Out-of-pocket cost. Period cost. Incremental cost.arrow_forwardRelevant and irrelevant costs. Answer the following questions. Robinson Computers makes 5,700 units of a circuit board, CB76, at a cost of $230 each. Variable cost per unit is $180 and fixed cost per unit is $50. Peach Electronics offers to supply 5,700 units of CB76 for $210. If Robinson buys from Peach, it will be able to save $20 per unit in fixed costs but continue to incur the remaining $30 per unit. Should Robinson accept Peach’s offer? Explain. RT Manufacturing is deciding whether to keep or replace an old machine. It obtains the following information:arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Essentials of Business Analytics (MindTap Course ...StatisticsISBN:9781305627734Author:Jeffrey D. Camm, James J. Cochran, Michael J. Fry, Jeffrey W. Ohlmann, David R. AndersonPublisher:Cengage Learning
Essentials of Business Analytics (MindTap Course ...
Statistics
ISBN:9781305627734
Author:Jeffrey D. Camm, James J. Cochran, Michael J. Fry, Jeffrey W. Ohlmann, David R. Anderson
Publisher:Cengage Learning
Fixed Asset Replacement Decision 1235; Author: Accounting Instruction, Help, & How To;https://www.youtube.com/watch?v=LJRzn9K8Nwk;License: Standard Youtube License