Question
Chapter 5, Problem 34P
a)
Summary Introduction
To determine: The number of painter teams A needs to hire so that customers don’t have to wait more than 2 weeks to get their house painted.
b)
Summary Introduction
To determine: Does A make money if she charges $1700 for painting and pays $500 per week to each team of painters.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Amanda Fall is starting up a new house painting business, Fall Colors. She has been advertisingin the local newspaper for several months. Based on inquiries and informal surveys of the localhousing market, she anticipates that she will get painting jobs at the rate of four per week(Poisson distributed). Amanda has also determined that it will take a four-person team ofpainters an average of 0.7 week (exponentially distributed) for a typical painting job. Determine the number of teams of painters Amanda needs to hire so that customers will have to wait no longer than 2 weeks to get their houses painted.
McDonalds has a drive-through window and, during peak lunch times, can handle a maximum of 85 cars per hour with one person taking orders, assembling them, and acting as cashier. The average sale per order is $12.00.
A proposal has been made to add two additional workers and divide the tasks among the three. One will take orders, the second will assemble them, and the third will act as a cashier. With this system, it is estimated that 120 cars per hour can be serviced. Use productivity arguments to recommend whether or not to change the current system.
Hint: Productivity = revenue/labor dollar
A fast-food restaurant has a drive-thru window and during peak lunch times can handle a maximum of 60 cars per hour with one person taking orders, assembling them, and acting as cashier. The average sale per order is $9.50. A proposal has been made to add two workers and divide the tasks among the three. One will take orders, the second will assemble them, and the third will act as a cashier. With this system, it is estimated that 85 cars per hour can be serviced.
Chapter 5 Solutions
Operations and Supply Chain Management, 9th Edition WileyPLUS Registration Card + Loose-leaf Print Companion
Ch. 5 - Uber and the Sharing Economy First there was...Ch. 5 - Uber and the Sharing Economy First there was...Ch. 5 - Uber and the Sharing Economy First there was...Ch. 5 - Prob. 2.1ASCCh. 5 - Prob. 2.2ASCCh. 5 - Prob. 2.3ASCCh. 5 - Prob. 3.1ASCCh. 5 - Prob. 3.2ASCCh. 5 - Prob. 1QCh. 5 - Prob. 2Q
Ch. 5 - Prob. 3QCh. 5 - Prob. 4QCh. 5 - Prob. 5QCh. 5 - Prob. 6QCh. 5 - Prob. 7QCh. 5 - Prob. 8QCh. 5 - Prob. 9QCh. 5 - Prob. 11QCh. 5 - Prob. 12QCh. 5 - Prob. 13QCh. 5 - Prob. 14QCh. 5 - Prob. 15QCh. 5 - Prob. 16QCh. 5 - Prob. 17QCh. 5 - Prob. 19QCh. 5 - Prob. 20QCh. 5 - Under what conditions will the single-channel,...Ch. 5 - Prob. 22QCh. 5 - Prob. 1PCh. 5 - Prob. 2PCh. 5 - Prob. 3PCh. 5 - Prob. 4PCh. 5 - Prob. 5PCh. 5 - Prob. 6PCh. 5 - Prob. 7PCh. 5 - Prob. 8PCh. 5 - Prob. 9PCh. 5 - Prob. 10PCh. 5 - Prob. 11PCh. 5 - Annie Campbell is a nurse on the evening shift...Ch. 5 - Prob. 13PCh. 5 - Prob. 14PCh. 5 - Prob. 15PCh. 5 - Prob. 16PCh. 5 - Prob. 17PCh. 5 - Prob. 18PCh. 5 - Prob. 19PCh. 5 - Prob. 20PCh. 5 - Prob. 21PCh. 5 - Prob. 22PCh. 5 - Drivers who come to get their licenses at the...Ch. 5 - Prob. 24PCh. 5 - Prob. 25PCh. 5 - Prob. 26PCh. 5 - The Waterfall Buffet in the lower level of the...Ch. 5 - Prob. 28PCh. 5 - Prob. 29PCh. 5 - Prob. 30PCh. 5 - Prob. 31PCh. 5 - The Baytown Post Office has four stations for...Ch. 5 - Prob. 33PCh. 5 - Prob. 34PCh. 5 - Prob. 35PCh. 5 - Prob. 36PCh. 5 - Prob. 37PCh. 5 - Prob. 38PCh. 5 - Prob. 39PCh. 5 - Prob. 40PCh. 5 - Prob. 41PCh. 5 - Prob. 42PCh. 5 - Prob. 43PCh. 5 - Prob. 44PCh. 5 - Prob. 45PCh. 5 - Prob. 46PCh. 5 - Prob. 47PCh. 5 - After reviewing your report above, Tech has...Ch. 5 - Prob. 49PCh. 5 - Prob. 50PCh. 5 - Prob. 1.1CPCh. 5 - Prob. 1.2CPCh. 5 - Prob. 2.1CPCh. 5 - Prob. 2.2CPCh. 5 - Prob. 3.1CPCh. 5 - Prob. 4.1CP
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- 19arrow_forwardThe table below shows the time stamps of 10 customers who visited a local bank branch from 9:00 a.m. to 9:45 a.m. What is the flow time of customers? Customer 1 2 3 4 5 6 7 8 9 10 Time in 9:2 9:5 9:6 9:8 9:8 9:10 9:12 9:15 9:18 9:19 Time out 9:7 9:10 9:17 9:23 9:36 9:21 9:41 9:41 9:28 9:42 Instruction: Round your answer to 1 decimal place. Flow time of customers 3.5 minutesarrow_forwardA company receives parts from suppliers to be used in its manufacturing departments. The quality control department must perform two operation when shipments are received:i) Operation A-draw a random sample, package, and deliver to testing, andii) Operation B-test the materials and issue a disposition reportThere are currently six shipments waiting to be processed. The time estimates for processing these six shipments through quality control are:Shipment Operation A (hours) Operation B (hours)1 1.5 1.02 1.1 2.73 1.2 1.44 0.7…arrow_forward
- Andromeda Books is a small independent publisher of fictionand nonfiction books. Each week the publisher receives anaverage of eight unsolicited manuscripts to review (Poissondistributed). The publisher has 12 freelance reviewers in thearea who read and evaluate manuscripts. It takes a revieweran average of 10 days (exponentially distributed) to read amanuscript and write a brief synopsis. (Reviewers work on their own, seven days a week.) Determine how long the pub-lisher must wait on average to receive a reviewer’s manu-script evaluation, how many manuscripts are waiting to be reviewed, and how busy the reviewers are.arrow_forwardMary Smith, manager of the ABC Hotel, is considering how to restructure the front desk to reach an optimum level of staff efficiency (the utilization factor between 80% and 95% will be considered acceptable) and guest service expressed as an average waiting time in the line/queue (any plan resulting in the waiting time longer than 20 minutes is unacceptable). At present, the hotel has four clerks on duty, each with a separate waiting line, during the peak check-in time. Observation of arrivals during this time shows that an average of 60 guests arrive each hour(15 guests on average for each check-in line) and they follow a Poisson process. It takes an average of 3 minutes and 20 seconds for each front-desk clerk to register each guest (this and all other service times are exponentially distributed). Mary is considering a number of plans for improving guest service by reducing the length of time guests spend waiting in line. The first plan is to convert the current system into a…arrow_forwardA bank receives loan applications from 6 customers a day. The bank has promised customers that applications will be processed in the order they are received. The table below shows the applications in the order they were received, the processing time for each loan application, and the due date that customers need to hear about their application status: Customer Processing time (days) Due date (days) A 9 13 B 11 18 C 8 11 D 7 13 E 10 22 F 12 28 Average flow time days Average tardiness days Average number of jobs applicationsarrow_forward
- Panini, a popular sandwich shop, offers 3 types of sandwiches: grilled vegetables, grilled chicken, and pastrami. The table below provides demand data: Grilled Vegetables Grilled Chicken Pastrami Demand per hour 25 9 12 There are up to five steps in the process of making sandwiches listed below with activity times (if no activity time, then than step is not done for that sandwich). Only 50% of customers want their sandwich toasted, no matter which sandwich is ordered. Step Grilled Vegetables(in minutes) Grilled Chicken(in minutes) Pastrami(in minutes) Cut bread 1 1 1 Grill 1.2 1.2 Slice meat 2 Toast 1.2 1.2 1.2 Wrap 0.8 0.8 0.8 Suppose Panini employs 1 worker at each step. a) Does Panini have enough capacity to fulfill the current demand for sandwiches? (b) What is the current capacity cushion for Panini? (as a %) c) If demand for Pastramis increase with the percentage indicated below, how much additional workers should Panini hire (if any), and where…arrow_forwardOwners of a local restaurant are concerned about their ability to provide quality service as they continue to grow and attract more customers. They have collected data from Friday and Saturday nights, their busiest times of the week. During these time periods about 75 customers arrive per hour for service. Given number of tables and chairs, and the typical time it takes to serve a customer, they the owners estimate they can serve on average about 100 customers per hour. Owners of the restaurant anticipates that, in one year their demand will double as long as they can provide good service to their customers. How much will they have to increase their service capacity to in order to stay out of the critical zone? (Roundup your answer to the next whole number.)arrow_forwardWhat would the ROI be when using a room service robot in a hotel?arrow_forward
- How does seasonal variability in demand affect the l ow and waiting time through a process? How might a company respond to reduce the effect of this variability?arrow_forwardJobs arrive randomly at a particular assembly plant; assume that the arrival rate is five jobs per hour. Service times (in minutes per job) do not follow the exponential probability distribution. Two proposed designs for the plant’s assembly operation are shown: SERVICE TIME SERVICE TIME DESIGN MEAN STANDARD DEVIATION A 5.5 2.75 B 4 0.6 A.What is the service rate in jobs per hour for each design?b. For the service rates in part (a), what design appears to provide the best oR fastest service rate?c. Use the M/G/1 model to compute the operating characteristics for each design.i. The average number of customers in the waiting lineii. The average number of customers in the system.iii. The average time a customer spends in the waiting line (in hours)arrow_forwardb) A company receives parts from suppliers to be used in its manufacturing departments. The quality control department must perform two operations when shipments are received: Operation A – draw a random sample, package, and deliver to testing; and Operation B – test the materials and issue a disposition report. There are currently six shipments waiting to be processed. The time estimates for processing these six shipments through quality control are given in the table below. Shipment Operation A (hours) Operation B (hours) A 1.5 1.0 В 1.1 2.7 1.2 1.4 D 0.7 1.6 E 1.6 1.5 F 1.9 2.9 Use Johnson's Rule to set the sequence of processing the shipments through Quality Control. i. ii. How much total time is required to process all the six shipments through Quality Control? Show all times on a Gantt Chart. w luarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,