Concept explainers
Professor Cook teaches operations management at State University. She is
Want to see the full answer?
Check out a sample textbook solutionChapter 8 Solutions
Operations and Supply Chain Management, 9th Edition WileyPLUS Registration Card + Loose-leaf Print Companion
Additional Business Textbook Solutions
Operations Management, Binder Ready Version: An Integrated Approach
Principles of Operations Management: Sustainability and Supply Chain Management (10th Edition)
Operations Management: Processes and Supply Chains (11th Edition)
Operations Management
Operations Management: Processes and Supply Chains (12th Edition) (What's New in Operations Management)
Business in Action (8th Edition)
- A student on a medical-surgical unit at a community hospital is currently enrolled in a HIT program at the local university. As part of the requirements for the HIT course, She is required to finish an assignment linking health care interventions and patient outcomes. She returns to her place of employment at night for two weeks to audit patient charts and collect the data she needs for her assignment. She makes copies of the patient records that are particularly helpful and takes them home to write the final paper. Consider the following Has the student violated ethical principles by collecting patient data for a college assignment? Why or Why not?arrow_forwardSassy Ko is the loading dock supervisor for a dry cement packaging company. His work crew is comprised of unskilled workers who load large transport trucks with bags of cement, gravel and sand. The work is hard and the employee turnover rate is high. Employees record their attendance on separate timecards. Sassy Ko authorizes payroll payments each week by signing the timecards and submitting them to the payroll department. The paychecks are then prepared by payroll and distributed to Sassy KO, who distributes them to his work crew. a) Identify any control problems in the system. b) What sorts of frauds are possible in this system? Control Problems or Possible Fraudarrow_forwardYour project manager asked you to level the resources for a construction project to minimize the hiring and firing cost throughout the project life cycle. In your approach to resource levelling, resource utilization is made as level as possible by extending the project beyond its required completion time by adding additional resources to the critical path activities by adding additional resources to the project by assigning one resource to work per day without extending the project beyond its required completion time.arrow_forward
- Exercise Published by Tutor The company (from the previous example) producing training sets for basic operations with SMD components produces them in a total of 3 of its factories: New York factory, the Washington factory, and the HK factory. In total, the company will produce a total of 420 teaching sets. The New York factory will produce 50% more sets than the total production in Washington and HK combined, and the production in Washington factory is 10% higher than in HK factory. How many sets are produced in the individual production factories? The tutor published the attched solution(pic). Based on the attached solution and the exercise description can you explain me how was the total production,constraints row was constructed ?arrow_forwardA company assembles a product that consists of three pieces called AA, BB, and CC. The AA and BB parts are manufactured by the company itself, while the CC parts are purchased from another manufacturer. The process times, in hours, required for each piece in each of the processes are given in the following table: Process 1 Process 2 Process 3 Process 4 Process 5 AA 1 0.5 0.5 BB 1.5 0.5 0.5 0.5 The company has 20 machines that can carry out process 1, 5 process 2, 10 process 3, 5 process 4 and 5 process 5. Each machine works a maximum of five days each week at a rate of fifty weeks a year , in working days of 8 hours a day. Formulate and solve to determine the maximum number of assembled sets that you can produce.arrow_forwardCubway, the sandwich shop, is run by Jim, Tim and Kim. When a customer arrives, Jim spends 5 minutes taking order from the customer. After this, Tim prepares bread and Kim prepares filling for the order. These activities are performed in parallel, and take 6 and 12 minutes respectively. Jim then assembles the bread and filling, which takes 4 minutes of his time. Finally, Tim spends 1 minutes in delivering the order and taking payment. What is maximum number of sandwiches Cubway can make per hour? (In other words, what is the capacity of the process in sandwiches per hour?)arrow_forward
- ABC Solutions is a traditional company in a textile industry with a combined workforce of 150 staff. Due to increased levels of competition, this company is now increasingly finding it difficult to compete – especially as the larger companies seem to be a little more innovative, agile and responsive to client requirements. Management have noticed that staff, especially the highly skilled ones, are now leaving the company to seek work elsewhere (in these larger companies). This has meant appointing new staff and undertaking a considerable amount of re-training to replace those that have left the company. Apart from impacting on core business operations, ABC Solutions has started witnessing a drop in its profit margin. Given this position, senior management at ABC Solutions have decided to implement a performance measurement tool (PMT) that would allow them to align the strategic, management and operational requirements of the business. They are therefore considering the adoption of the…arrow_forwardPayroll: Risks and Controls Below are some of the processes that are typically executed before, during, and after a payroll cycle: Employees record their hours worked. The supervisor reviews and approves each employee's time records with their signature. An officer from the Human Resources department updates employee files after receiving authorized records of overtime and leaves (vacations, illness, etc.) from the supervisor. Afterward, approved records are sent to the payroll officer in the accounting department. The payroll officer calculates the gross payment, applies deductions, and calculates the net payment. Subsequently, the final payroll is sent for the controller's approval. Payments are issued to employees using their preferred delivery method (check or direct deposit). Entries are generated for the corresponding payroll transactions. Withholdings for payroll taxes, Social Security, and Medicare are respectively remitted to the Department of Treasury and the Internal…arrow_forwardPanini, a popular sandwich shop, offers 3 types of sandwiches: grilled vegetables, grilled chicken, and pastrami. Demand (sandwiches per hour) are Grilled Vegetables = 25, Grilled Chicken = 15, and Pastrami = 10. There are up to five steps in the process of making sandwiches, listed below with processing times. Step Grilled Vegetables Grilled Chicken Pastrami 0.75 minutes 0.75 minutes 0.75 minutes 0.75 minutes 1.4 minutes 1.4 minutes - - - - 3 minutes 3 minutes 2 minutes 2 minutes 2 minutes 2 minutes 0.5 minutes 0.5 minutes 0.5 minutes 0.5 minutes Only 50 percent of customers want their sandwich toasted, no matter which sandwich is ordered. Suppose Panini employs 1 worker at each step. Instructions: Round all answers to 1 decimal place. What is the implied utilization of each of the five steps in this process? Cut ____% Grill ____% Slice ____% Toast…arrow_forward
- A manufacturing company produced first unit in 15:00 hours and dollar 2,50,000 worth of material, equipment usage, and supplies. The second unit took 13 hours and used dollar two lakh worth of materials, equipment usage and supplies. Labour is dollar 15 per hour. Determine the total production cost for additional 10 units after the second unit was completed round the final amount to nearest integerarrow_forwardThree employees at a fast-food restaurant each perform one of the three activities in serving a customer: take the order, process the order, and deliver the order. The processing time for each activity is given as follows: Activity Processing Time Take the order 30 seconds Process the order 2 minutes Deliver the order 1 minute Assume that the demand is 20 customers/hour. What is the average labor utilization? a 38.9% b 85.7% c 66.7% d 100%arrow_forwardWilliam Beebe owns a small shoe store. He has 10 pairs of shoes that requireresoling and polishing. He has a machine that can resole one pair of shoes at atime, and the time required for the operation varies with the type and condition of theshoe and the type of sole that is used. Shoes are polished on a machine dedi-cated tothis purpose as well, and polishing is always done after resoling. His assistant generally does the polishing while Mr. Beebe does the resoling. The resoling and polishingtimes (in minutes) are Shoes Resoling Time Polishing Time1 14 32 28 13 12 24 6 55 10 106 14 67 4 128 25 89 15 510 10 5In what order should the shoes be repaired in order to minimize the total makespanfor these 10 jobs?arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,