Chapter 14.S, Problem 28P
Summary Introduction
To determine: the optimal mix of coal to produce at each mine and ships it to customer in order to minimize its total cost for WR coal company by formulating and solving linear programming.
Introduction: Linear programming is used to obtain the best possible outcome from the given real-world problem which is subjective to constraints and inequalities. It is used to make decisions based on business objectives. It is used in business planning, industrial engineering, and physical science. Express the real-world problem into the mathematical expression to get the optimal solution from the linear programming.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Hudson Corporation is considering three options for managing its data processing operation: continuing with its own staff, hiring an outside vendor to do the managing (referred to as outsourcing), or using a combination of its own staff and an outside vendor. The cost of the operation depends on future demand. The annual cost of each option (in thousands of dollars) depends on demand as follows: Demand Staffing Options High Medium Low Own staff 650 650 600 Outside vendor 900 600 300 Combination 800 650 500 If the demand probabilities are 0.2, 0.5, and 0.3, which decision alternative will minimize the expected cost of the data processing operation? What is the expected annual cost associated with that recommendation? Expected annual cost = $fill in the blank 2 Construct a risk profile for the optimal decision in part (a). The input in the box below will not be graded, but may be reviewed and considered by your instructor.
Joburg Logistics (JL), a distributor of various products in
Polokwane receives their products from suppliers in
Durban, Cape Town, and Johannesburg. The company's
management is concerned with the supply cost of a
certain product that is supplied by a manufacturer in
Durban. Currently JL has a contract with Transnet Freight
Rail (TFR) for the transport of the orders from Durban. The
following are the rail rate and transit time:
Transit time (rail)
Rail rate
5 days
R2.75/unit
The impact on the transport and inventory carrying cost
because of this arrangement is a concern of the logistics
director, Mrs Micky. As a result, Mrs Micky has requested
the logistics manager to evaluate the option to use a 3PL
service provider for the shipment from Durban to
Johannesburg. The logistics manager has identified a
certain 3PL company that has the capacity to perform this
contract. However, in order to provide a transport rate, the
3PL company required the size and frequency of orders.
JL currently…
The Canadian government has built a large grain-shipping port at Churchill, Manitoba, on the Hudson Bay. Grain grown in southern Manitoba is carried by rail to Churchill during the open-water shipping season. Unfortunately the port is open only 50 days per year during July and August. This leads to some critical crew staffing decisions by management. The port has the capacity to load up to 7 ships simultaneously, provided that each loading bay has an assigned crew. The remote location and short shipping season results in a very high labor cost for each crew assigned, and management would like to minimize the number of crews. Ships arrive in a random pattern that can be modeled using the Poisson probability model. If a ship arrives and all available loading bays are filled, the ship will be delayed, resulting in a large cost that must be paid to the owner of the ship. This penalty was negotiated to encourage ship owners to send their ships to Churchill.Results of an initial analysis…
Chapter 14 Solutions
Operations and Supply Chain Management, 9th Edition WileyPLUS Registration Card + Loose-leaf Print Companion
Ch. 14.S - Prob. 1QCh. 14.S - Prob. 2QCh. 14.S - Prob. 3QCh. 14.S - Prob. 4QCh. 14.S - Prob. 5QCh. 14.S - Prob. 6QCh. 14.S - Prob. 7QCh. 14.S - Prob. 8QCh. 14.S - Prob. 1PCh. 14.S - The Tycron Company produces three electrical...
Ch. 14.S - Prob. 3PCh. 14.S - The Pinewood Cabinet and Furniture Company...Ch. 14.S - The Mystic Coffee Shop blends coffee on the...Ch. 14.S - Prob. 6PCh. 14.S - Prob. 7PCh. 14.S - Prob. 8PCh. 14.S - Prob. 9PCh. 14.S - Prob. 10PCh. 14.S - Prob. 11PCh. 14.S - Prob. 12PCh. 14.S - Prob. 13PCh. 14.S - Prob. 14PCh. 14.S - Prob. 15PCh. 14.S - Prob. 16PCh. 14.S - Prob. 17PCh. 14.S - Prob. 18PCh. 14.S - Prob. 19PCh. 14.S - Prob. 20PCh. 14.S - Prob. 22PCh. 14.S - Prob. 23PCh. 14.S - Prob. 24PCh. 14.S - Prob. 25PCh. 14.S - Prob. 27PCh. 14.S - Prob. 28PCh. 14.S - Prob. 1.1CPCh. 14.S - Prob. 1.2CPCh. 14.S - Prob. 1.3CPCh. 14.S - Prob. 1.4CPCh. 14.S - Prob. 1.5CPCh. 14.S - Prob. 1.6CPCh. 14.S - Prob. 1.7CPCh. 14.S - Prob. 1.8CPCh. 14.S - Prob. 1.9CPCh. 14.S - Prob. 2.1CPCh. 14 - Prob. 1.1ASCCh. 14 - Prob. 1.2ASCCh. 14 - Supply and Demand in the Spirits Industry A...Ch. 14 - Supply and Demand in the Spirits Industry A...Ch. 14 - Supply and Demand in the Spirits Industry A...Ch. 14 - Disneys Magic Numbers Sales and operations...Ch. 14 - Disneys Magic Numbers Sales and operations...Ch. 14 - Prob. 1QCh. 14 - List several alternatives for adjusting capacity....Ch. 14 - Prob. 3QCh. 14 - How do linear programming, the linear decision...Ch. 14 - Prob. 5QCh. 14 - What options are available for altering the...Ch. 14 - Prob. 7QCh. 14 - Prob. 8QCh. 14 - Explain the process of collaborative planning. How...Ch. 14 - Prob. 11QCh. 14 - Prob. 12QCh. 14 - Prob. 1PCh. 14 - Prob. 2PCh. 14 - Prob. 3PCh. 14 - Prob. 4PCh. 14 - Mamas Stuffin is a popular food item during the...Ch. 14 - Prob. 6PCh. 14 - Slopes Sleds (SS) makes skis, snowboards, and...Ch. 14 - Prob. 8PCh. 14 - Midlife Shoes, Inc, is a manufacturer of sensible...Ch. 14 - Design a production plan for Mamas Stuffin in...Ch. 14 - Design a production plan for FansForYou in Problem...Ch. 14 - Prob. 16PCh. 14 - Prob. 17PCh. 14 - Prob. 18PCh. 14 - Prob. 19PCh. 14 - Prob. 20PCh. 14 - Prob. 21PCh. 14 - Prob. 22PCh. 14 - How many units are available-to-promise in period...Ch. 14 - Complete the available-to-promise table below.Ch. 14 - Complete the available-to-promise table below.Ch. 14 - Calculate the available-to-promise row in the...Ch. 14 - Complete the following table. How many Bs are...Ch. 14 - Managers at the Dew Drop Inn are concerned about...Ch. 14 - Prob. 29PCh. 14 - Prob. 30PCh. 14 - Prob. 31PCh. 14 - Prob. 32PCh. 14 - The Forestry Club sells Christmas trees each year...Ch. 14 - Prob. 34PCh. 14 - Tariott Hotel rents rooms for 125 a night that...Ch. 14 - Prob. 36PCh. 14 - Prob. 1.1CPCh. 14 - Prob. 1.2CPCh. 14 - Prob. 1.3CP
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- Seas Beginning sells clothing by mail order. An important question is when to strike a customer from the companys mailing list. At present, the company strikes a customer from its mailing list if a customer fails to order from six consecutive catalogs. The company wants to know whether striking a customer from its list after a customer fails to order from four consecutive catalogs results in a higher profit per customer. The following data are available: If a customer placed an order the last time she received a catalog, then there is a 20% chance she will order from the next catalog. If a customer last placed an order one catalog ago, there is a 16% chance she will order from the next catalog she receives. If a customer last placed an order two catalogs ago, there is a 12% chance she will order from the next catalog she receives. If a customer last placed an order three catalogs ago, there is an 8% chance she will order from the next catalog she receives. If a customer last placed an order four catalogs ago, there is a 4% chance she will order from the next catalog she receives. If a customer last placed an order five catalogs ago, there is a 2% chance she will order from the next catalog she receives. It costs 2 to send a catalog, and the average profit per order is 30. Assume a customer has just placed an order. To maximize expected profit per customer, would Seas Beginning make more money canceling such a customer after six nonorders or four nonorders?arrow_forwardLemingtons is trying to determine how many Jean Hudson dresses to order for the spring season. Demand for the dresses is assumed to follow a normal distribution with mean 400 and standard deviation 100. The contract between Jean Hudson and Lemingtons works as follows. At the beginning of the season, Lemingtons reserves x units of capacity. Lemingtons must take delivery for at least 0.8x dresses and can, if desired, take delivery on up to x dresses. Each dress sells for 160 and Hudson charges 50 per dress. If Lemingtons does not take delivery on all x dresses, it owes Hudson a 5 penalty for each unit of reserved capacity that is unused. For example, if Lemingtons orders 450 dresses and demand is for 400 dresses, Lemingtons will receive 400 dresses and owe Jean 400(50) + 50(5). How many units of capacity should Lemingtons reserve to maximize its expected profit?arrow_forwardHERO Corporation is considering three options for managing its data processing operation: continuing with its own staff, hiring an outside vendor to do the managing (referred to as outsourcing), or using a combination of its own staff and an outside vendor. The cost of the operation depends on future demand. The annual cost of each option (in thousands of pesos) depends on demand as follows: Demand Demand Demand Staffing Options High Medium Low Own staff 352 325 300 Outsider vendor 450 300 150 Combination 400 325 250 If the decision maker knows nothing about the probabilities of the four states of nature, what is the recommended decision using:i. the optimistic approach and the conservative approach iii. the minimax regret approach iv. the Laplace methodarrow_forward
- Futura Company purchases the 79,000 starters that it installs in its standard line of farm tractors from a supplier for the price of $12.60 per unit. Due to a reduction in output, the company now has idle capacity that could be used to produce the starters rather than buying them from an outside supplier. However, the company’s chief engineer is opposed to making the starters because the production cost per unit is $13.30 as shown below: Per Unit Total Direct materials $ 6.00 Direct labor 3.20 Supervision 1.90 $ 150,100 Depreciation 1.20 $ 94,800 Variable manufacturing overhead 0.40 Rent 0.60 $ 47,400 Total product cost $ 13.30 If Futura decides to make the starters, a supervisor would have to be hired (at a salary of $150,100) to oversee production. However, the company has sufficient idle tools and machinery such that no new equipment would have to be purchased. The rent charge above is based on space utilized in the plant. The total rent on the plant…arrow_forwardThe Seaside Hotel is a three-star hotel in Newquay, Cornwall. It contains 108 rooms and employs 30 fulltime and 40 parttime personnel. Between May and August, the hotel's workforce is nearly doubled by casual and temporary workers. Cornwall is a difficult place to do business, especially in the tourism industry. Business is highly seasonal with hotels experiencing very low occupancy during the offseason and many hotels choose not to operate during this time. The Seaside Hotel operates all year round by supplementing its tourism trade during the off-season by offering discounted conferencing facilities for local businesses and as a cheap base for corporate events and activities, such as team building weekends. Tourism is, however, vitally important for the region and its businesses and provides a significant proportion of all jobs in the South West. Cornwall can, however, be a difficult place in which to work. For instance, Newquay – Cornwall’s most popular holiday destination – is one…arrow_forwardCompanies A, B, and C supply components to three plants (F, G, and H) via two crossdocking facilities (D and E). It costs $4 to ship from D regardless of final destination and $3 to ship to E regardless of supplier. Shipping to D from A, B, and C costs $3, $4, and $5, respectively, and shipping from E to F, G, and H costs $10, $9, and $8, respectively. Suppliers A, B, and C can provide 200, 300 and 500 units respectively and plants F, G, and H need 350, 450, and 200 units respectively. Crossdock facilities D and E can handle 600 and 700 units, respectively. Logistics Manager, Aretha Franklin, had previously used "Chain of Fools" as her supply chain consulting company, but now turns to you for some solid advice. What is the objective function? Group of answer choices Max Z = $3AD + $3AE + $4BD + $3BE + $5CD + $3CE + $4DF + $4DG + $4DH + $10EF + $9EG + $8EH Min Z = $3AD + $3AE + $4BD + $3BE + $5CD + $3CE + $4DF + $4DG + $4DH + $10EF + $9EG + $8EH Min Z = $3AD + $3BE + $5CD + $3CE…arrow_forward
- Trips Logistics, a third-party logistics firm that provides warehousing and other logistics services, is facing a decision regarding the amount of space to lease for the upcoming three-year period. The general manager has forecast that Trips Logistics will need to handle a demand of 100,000 units for each of the next three years. Historically, Trips Logistics has required 1,000 square feet of warehouse space for every 1,000 units of demand. For the purposes of this discussion, the only cost Trips Logistics faces is the cost for the warehouse. Trips Logistics receives revenue of $1.22 for each unit of demand. The general manager must decide whether to sign a three-year lease or obtain warehousing space on the spot market each year. The three-year lease will cost $1 per square foot per year, and the spot market rate is expected to be $1.20 per square foot per year for each of the three years. Trips Logistics has a discount rate of k = 0.1.arrow_forwardCompanies A, B, and C supply components to three plants (F, G, and H) via two crossdocking facilities (D and E). It costs $4 to ship from D regardless of final destination and $3 to ship to E regardless of supplier. Shipping to D from A, B, and C costs $3, $4, and $5, respectively, and shipping from E to F, G, and H costs $10, $9, and $8, respectively. Suppliers A, B, and C can provide 200, 300 and 500 units respectively and plants F, G, and H need 350, 450, and 200 units respectively. Crossdock facilities D and E can handle 600 and 700 units, respectively. Logistics Manager, Aretha Franklin, had previously used "Chain of Fools" as her supply chain consulting company, but now turns to you for some solid advice. Set up the solution in Excel and solve with Solver. What are total costs?arrow_forwardGeorgia Cabinets manufactures kitchen cabinets that are sold to local dealers throughout the Southeast. Because of a large backlog of orders for oak and cherry cabinets, the company decided to contract with three smaller cabinetmakers to do the final finishing operation. For the three cabinetmakers, the number of hours required to complete all the oak cabinets, the number of hours required to complete all the cherry cabinets, the number of hours available for the final finishing operation, and the cost per hour to perform the work are shown here: Cabinetmaker 1 Cabinetmaker 2 Cabinetmaker 3 Hours required to complete all the oak cabinets 50 44 32 Hours required to complete all the cherry cabinets 61 46 34 Hours available 35 25 30 Cost per hour $36 $43 $56 For example, Cabinetmaker 1 estimates that it will take 50 hours to complete all the oak cabinets and 61 hours to complete all the cherry cabinets. However, Cabinetmaker 1 only has 35 hours available for the final…arrow_forward
- Georgia Cabinets manufactures kitchen cabinets that are sold to local dealers throughout the Southeast. Because of a large backlog of orders for oak and cherry cabinets, the company decided to contract with three smaller cabinetmakers to do the final finishing operation. For the three cabinetmakers, the number of hours required to complete all the oak cabinets, the number of hours required to complete all the cherry cabinets, the number of hours available for the final finishing operation, and the cost per hour to perform the work are shown here: Cabinetmaker 1 Cabinetmaker 2 Cabinetmaker 3 Hours required to complete all the oak cabinets 50 44 32 Hours required to complete all the cherry cabinets 61 46 34 Hours available 35 25 30 Cost per hour $36 $43 $56 For example, Cabinetmaker 1 estimates that it will take 50 hours to complete all the oak cabinets and 61 hours to complete all the cherry cabinets. However, Cabinetmaker 1 only has 35 hours available for the final…arrow_forwardGeorgia Cabinets manufactures kitchen cabinets that are sold to local dealers throughout the Southeast. Because of a large backlog of orders for oak and cherry cabinets, the company decided to contract with three smaller cabinetmakers to do the final finishing operation. For the three cabinetmakers, the number of hours required to complete all the oak cabinets, the number of hours required to complete all the cherry cabinets, the number of hours available for the final finishing operation, and the cost per hour to perform the work are shown here: Cabinetmaker 1 Cabinetmaker 2 Cabinetmaker 3 Hours required to complete all the oak cabinets 47 40 27 Hours required to complete all the cherry cabinets 64 51 36 Hours available 40 30 35 Cost per hour $34 $41 $52 For example, Cabinetmaker 1 estimates it will take 47 hours to complete all the oak cabinets and 64 hours to complete all the cherry cabinets. However, Cabinetmaker 1 only has 40 hours available for the final…arrow_forwardGeorgia Cabinets manufactures kitchen cabinets that are sold to local dealers throughout the Southeast. Because of a large backlog of orders for oak and cherry cabinets, the company decided to contract with three smaller cabinetmakers to do the final finishing operation. For the three cabinetmakers, the number of hours required to complete all the oak cabinets, the number of hours required to complete all the cherry cabinets, the number of hours available for the final finishing operation, and the cost per hour to perform the work are shown here: Hours required to complete all the oak cabinets Hours required to complete. all the cherry cabinets Hours available Cost per hour Min s.t. 01 Let O₁ O₂ 01 01 For example, Cabinetmaker 1 estimates it will take 50 hours to complete all the oak cabinets and 60 hours to complete all the cherry cabinets. However, Cabinetmaker 1 only has 40 hours available for the final finishing operation. Thus, Cabinetmaker 1 can only complete 40/50 = 0.8, or 80%,…arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,