Chapter 6.5, Problem 33P
Summary Introduction
To modify: The model and find the optimal solution using solver.
Introduction: The variation between the present value of the
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
An emergency room (ER) at a Prisma Health Hospital has 10 total
beds it can hold patients, i.e., the capacity of the queueing system of this ER is 10. Patients
arrive to the ER at a rate of 5 per hour. Therefore, we have that λn = 6 for n = 0, 1, . . . , 9
and λ10 = 0 for this queueing system. A patient is seen by an ER doctor as the ‘service’
of this queueing system. The amount of time required for an ER doctor to treat a patient
is exponentially distributed with a mean of .4 hours. We seek the minimum number of ER
doctors so that the expected time of a patient waiting to be seen (so the Wq) is less than
or equal to 15 minutes (.25 hours). You should begin by analyzing s = 1 and show any
calculations that were used to determine Wq for each number of servers that you considered
until you meet the target metric.
Consider a bank with two tellers. Service times by each teller are exponentially distributed withmean of 1 hour per customer. Customers also arrive with an exponential interarrival times withmean of 1 hour. Suppose a customer has just arrived at 2pm:a. What is the probability that the next customer will arrive between 3:00 pm and 4:00 pm?b. If no customer arrives before 4:00 pm, what is the probability that the next customer willarrive between 4:00 pm and 5:00 pm?c. What is the probability that the number of arrivals between 2:00 pm and 4:00 pm will be morethan one?
Solve this theoretically not on excel please .:
A refiner in city Q serves four customers near city W and maintains consignment inventory (owned by the refiner) at each location. Currently, the refiner uses TL (truckload) transportation to deliver separately to each customer. Each truck costs $(740) plus $(309) per stop. The refiner is considering aggregating deliveries to city W on a single truck. The demand of the first customer is 75 tons a year, the demand of the second customer is 30 tons per year, and the demand of the third and fourth customers is 10 tons per year. The product cost is $8,000 per ton, and it uses a holding cost of
(24)%. The truck capacity is 20 tons.
a. What is the optimal delivery policy to each customer if the refiner ships separately to each of them? What is the annual total inventory-related cost?
b. What is the optimal delivery policy to each customer if the refiner aggregates shipments to each of the four customers on every truck that goes to city W? What…
Chapter 6 Solutions
Practical Management Science
Ch. 6.3 - Prob. 1PCh. 6.3 - Prob. 2PCh. 6.3 - Solve Problem 1 with the extra assumption that the...Ch. 6.3 - Prob. 4PCh. 6.3 - Prob. 5PCh. 6.3 - Prob. 6PCh. 6.3 - Prob. 7PCh. 6.3 - Prob. 8PCh. 6.3 - Prob. 9PCh. 6.3 - Prob. 10P
Ch. 6.4 - Prob. 11PCh. 6.4 - Prob. 12PCh. 6.4 - Prob. 13PCh. 6.4 - Prob. 14PCh. 6.4 - Prob. 15PCh. 6.4 - Prob. 16PCh. 6.4 - Prob. 17PCh. 6.4 - Prob. 18PCh. 6.4 - Prob. 19PCh. 6.4 - Prob. 20PCh. 6.4 - Prob. 21PCh. 6.4 - Prob. 22PCh. 6.4 - Prob. 23PCh. 6.5 - Prob. 24PCh. 6.5 - Prob. 25PCh. 6.5 - Prob. 26PCh. 6.5 - Prob. 28PCh. 6.5 - Prob. 29PCh. 6.5 - Prob. 30PCh. 6.5 - In the optimal solution to the Green Grass...Ch. 6.5 - Prob. 32PCh. 6.5 - Prob. 33PCh. 6.5 - Prob. 34PCh. 6.5 - Prob. 35PCh. 6.6 - Prob. 36PCh. 6.6 - Prob. 37PCh. 6.6 - Prob. 38PCh. 6 - Prob. 39PCh. 6 - Prob. 40PCh. 6 - Prob. 41PCh. 6 - Prob. 42PCh. 6 - Prob. 43PCh. 6 - Prob. 44PCh. 6 - Prob. 45PCh. 6 - Prob. 46PCh. 6 - Prob. 47PCh. 6 - Prob. 48PCh. 6 - Prob. 49PCh. 6 - Prob. 50PCh. 6 - Prob. 51PCh. 6 - Prob. 52PCh. 6 - Prob. 53PCh. 6 - Prob. 54PCh. 6 - Prob. 55PCh. 6 - Prob. 56PCh. 6 - Prob. 57PCh. 6 - Prob. 58PCh. 6 - Prob. 59PCh. 6 - Prob. 60PCh. 6 - Prob. 61PCh. 6 - Prob. 62PCh. 6 - Prob. 63PCh. 6 - Prob. 64PCh. 6 - Prob. 65PCh. 6 - Prob. 66PCh. 6 - Prob. 67PCh. 6 - Prob. 68PCh. 6 - Prob. 69PCh. 6 - Prob. 70PCh. 6 - Prob. 71PCh. 6 - Prob. 72PCh. 6 - Prob. 73PCh. 6 - Prob. 74PCh. 6 - Prob. 75PCh. 6 - Prob. 76PCh. 6 - Prob. 77PCh. 6 - Prob. 78PCh. 6 - Prob. 79PCh. 6 - Prob. 80PCh. 6 - Prob. 81PCh. 6 - Prob. 82PCh. 6 - Prob. 83PCh. 6 - Prob. 84PCh. 6 - Prob. 85PCh. 6 - Prob. 86PCh. 6 - Prob. 87PCh. 6 - Prob. 88PCh. 6 - Prob. 89PCh. 6 - Prob. 90PCh. 6 - Prob. 91PCh. 6 - Prob. 92PCh. 6 - This problem is based on Motorolas online method...Ch. 6 - Prob. 94PCh. 6 - Prob. 95PCh. 6 - Prob. 96PCh. 6 - Prob. 97PCh. 6 - Prob. 98PCh. 6 - Prob. 99PCh. 6 - Prob. 100PCh. 6 - Prob. 1CCh. 6 - Prob. 2CCh. 6 - Prob. 3.1CCh. 6 - Prob. 3.2CCh. 6 - Prob. 3.3CCh. 6 - Prob. 3.4CCh. 6 - Prob. 3.5CCh. 6 - Prob. 3.6C
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- MacBurger’s is attempting to determine how manyservers (or lines) should be available during the breakfastshift. During each hour, an average of 100 customers arriveat the restaurant. Each line or server can handle an averageof 50 customers per hour. A server costs $5 per hour, andthe cost of a customer waiting in line for 1 hour is $20.Assuming that an M/M/s/GD/∞/∞ model is applicable,determine the number of lines that minimizes the sum ofdelay and service costs.arrow_forwardCPU-on-Demand (CPUD) offers real-time high-performance computing services. CPUD owns 1 supercomputer that can be accessed through the Internet. Their customers send jobs that arrive, on average, every 5 hours. The standard deviation of the interarrival times is 5 hours. Executing each job takes on average 3 hours on the supercomputer and the standard deviation of the processing time is 4.5 hours. How long does a customer have to wait to have a job completed?arrow_forwardDuring an eight-hour shift, 750 non-defective parts are desired as a result of a manufacturing operation. The default operation time is 15 minutes. As the operators of machine are inexperienced, the actual time they take to perform the operation is 20 minutes, and, on average, a fifth of the parts that start to be manufactured are lost. Assuming that each one of the machines used in this operation will not be available for one hour in each shift, determine the number of machines needed.arrow_forward
- a mixed integer linear programming questionarrow_forwardIn a service facility, a manager wants to find “Optimal Service Level” by employing a trade-off graph (a graph of costs vs level of services) between waiting costs and service costs. Describe and show the optimal service level on this grapharrow_forwardThe Decision Sciences Department is tyring to determine whether to rent a slow or fast copier. The department believes that an employee's time is worth $15/hour. The slow copier rents for $4/hr, and it takes an employee an average of 10 minutes to complete copying. The fast copier rents for $15/hr, and it takes an employee an average of 6 minutes to complete copying. On average, four employees per hour need to use the copying machine. (Assume the copying times and interarrival times to the copying machine are exponentially distributed.) Which machine should the department rent to minimize expected total cost per hour? Please note this class revolves around Microsoft Excel so the answer I need needs to show the formulas in Excel, along with any corresponding graphs, etc. Thank you in advance!arrow_forward
- What factors determine whether a person chooses car or bus to travel to work? That is an interesting question. Suppose that you analyze this simple transportation problem using the probit model. The variables in the model are defined as follows: autotime commute time via auto, minutes commute time via bus, minutes =(bus time - auto time)/10, 10 minute units = 1 if auto chosen bustime dtime auto The probit model you estimate is P(AUTO = 1) = ¤(ß1 + B2DTIME). The estimates of the parameters are: -0.0788 + 0.400DTIME. The marginal effect of increasing public (bus) transportation time, given that travel via public transportation currently takes 15 minutes longer than auto travel is A) 0.348 B) 0.139 C) 0.307 D) 0.123 E) None of the above (A, B, C, D) is close to be correct.arrow_forwardApproximately 40 percent of a medical clinic’s weekly incoming calls for doctors’ appointments occur on Monday. Due to this large workload, 20 percent of the callers receive a busy signal and have to call back later. The clinic has one clerk for each two departments to handle incoming calls. Each clerk handles calls for the same departments all week and thus is familiar with the doctors’ hours, scheduling practices, and idiosyncrasies. Consider the following alternatives to solve thi problem: ∙ Continue the present system, which results in some customer inconvenience, loss of business, and perceived poor service. About 1000 patients attempt to call the clinic on Mondays. The clinic has 50,000 patients in all. ∙ Expand the phone lines and add more people to handle the peak load. The estimated cost for adding two more lines and two clerks is $60,000 per year. ∙ Install a computer to speed up appointments. In this case, the peak load could be handled with the current personnel. The…arrow_forwardA laundromat has five washing machines. A typical machine breaks down once every five days. A repairman can repair a machine in an average of 2.5days. Currently, three repairmen are on duty. The owner of the laundromat has the option of replacing them with a superworker, who can repair a machine in an average of 5/6 of a day. The salary of the superworker equalsthe pay of the three regular employees. Breakdown and service times are exponential. Should the laundromat replace the three repairers with the superworker?arrow_forward
- A call center employs 1,425 agents. Every month 57 employees leave the company and 57 new employees are hired. a. How long on average does an agent work for this call center (in months) Suppose the cost of hiring and training a new agent is $1,140. The manager of this call center believes that increasing agents’ salaries would keep them working longer at the company. The manager wants to increase the average time that an agent works for the call center to 36 months, or three years. b-1. Given the current average working time for agents at this call center, determine the current annual cost for hiring and training. b-2. Assuming the average time that an agent works for the call center is increased to 36 months, determine the new annual cost for hiring and training. b-3. If the time an agent works for the call center is increased to 36 months on average, how much could the company save on hiring and training costs over a year?arrow_forwardA supermarket has just added a new cash register to reduce the waiting times of the customers during weekends. Since a new cash register is added, the customers expect that their waiting time will be less than the waiting time before the cash register was added. Suppose the sample variance of the waiting times for 25 customers before adding the new cash register is sĩ = 4.8 minutes, while the sample variance of the waiting times for 25 customers after adding the cash register is sź = 2.2 minutes. The manager of the supermarket believes that the waiting times are normally distributed and that the two samples are drawn independently. What is the conclusion? Given that all other criteria are satisfied, should the supermarket continue with the new cash register?arrow_forwardA manufacturing facility stores spare parts for maintenance in a storage facility. Throughout theworking day, manufacturing personnel go to the storage facility to pick up supplies needed for theirjobs. The storage facility employees receive a request for supplies, on average, every five minutes fromthe manufacturing personnel. The average request requires 3.2 minutes to fill a request. Manufacturingpersonnel are paid $29.50 per hour and storage facility employees are paid $18.75 per hour. The storagefacility operates 8 hours per day. Base your costs on an 8-hour workday, the given arrival and servicerates, and the fact that when the manufacturing personnel are at the storage site picking up parts – theyare unable to complete their normal job in manufacturing.a) What is the system cost per day (to the nearest $) if there is only 1 storage facility employeeworking?b) What is the system cost per day (to the nearest $) if there are 2 storage facility employeesworking?c) What is the system…arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,