Question
Chapter 6.6, Problem 37P
Summary Introduction
To determine: The way to satisfy the demands of the customers with less amount of waste.
Introduction: The variation between the present value of the
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
LENILOVESBATO Co. produces various types of floor rugs with many different designs. They typically produce at least 200 rugs with a single machine setup. A cost incurred each time a new rug design is developed is called a(n)
a. Unit-level cost
b. Batch-level cost
c. Product-level cost
d. Facility-level cost
Atlanta Manufacturing Company produces products W, X, Y, and Z through a joint
process. The joint costs amount to $250,000.
Product
Units
Produced
Sales Value
at Split-Off
Additional Costs
of Processing
Sales Value
After Processing
W
750
$10,000
$2,500
$15,000
X
1,500
$30,000
$3,000
$35,000
Y
1,000
$20,000
$4,000
$25,000
Z
1,500
$40,000
$6,000
$45,000
If W is processed further, profits of W will:
1) Increase by $2,500
2) Increase by $12,500
3) Decrease by $23,000
4) Increase by $5,000
. Sarah’s Organic Soap Company makes four kinds of organic liquid soap: “regular,”“lavender,” “citrus,” and “tea tree.” Demands for the four scents are 150, 120, 75, and50 kgs per hour, respectively. Sarah’s production process can produce any soap at therate of 450 kgs per hour, but 1.5 hours are needed to switch between scents. Duringthose switchover times, the process doesn’t produce any soap. Sarah wants to choosea production schedule that (i) cycles repeatedly through the four scents, (ii) meets therequired demand, and (iii) minimizes the amount of inventory held.How many kgs of “regular” should Sarah produce before switching over to another scent?
Chapter 6 Solutions
Practical Management Science
Ch. 6.3 - Prob. 1PCh. 6.3 - Prob. 2PCh. 6.3 - Solve Problem 1 with the extra assumption that the...Ch. 6.3 - Prob. 4PCh. 6.3 - Prob. 5PCh. 6.3 - Prob. 6PCh. 6.3 - Prob. 7PCh. 6.3 - Prob. 8PCh. 6.3 - Prob. 9PCh. 6.3 - Prob. 10P
Ch. 6.4 - Prob. 11PCh. 6.4 - Prob. 12PCh. 6.4 - Prob. 13PCh. 6.4 - Prob. 14PCh. 6.4 - Prob. 15PCh. 6.4 - Prob. 16PCh. 6.4 - Prob. 17PCh. 6.4 - Prob. 18PCh. 6.4 - Prob. 19PCh. 6.4 - Prob. 20PCh. 6.4 - Prob. 21PCh. 6.4 - Prob. 22PCh. 6.4 - Prob. 23PCh. 6.5 - Prob. 24PCh. 6.5 - Prob. 25PCh. 6.5 - Prob. 26PCh. 6.5 - Prob. 28PCh. 6.5 - Prob. 29PCh. 6.5 - Prob. 30PCh. 6.5 - In the optimal solution to the Green Grass...Ch. 6.5 - Prob. 32PCh. 6.5 - Prob. 33PCh. 6.5 - Prob. 34PCh. 6.5 - Prob. 35PCh. 6.6 - Prob. 36PCh. 6.6 - Prob. 37PCh. 6.6 - Prob. 38PCh. 6 - Prob. 39PCh. 6 - Prob. 40PCh. 6 - Prob. 41PCh. 6 - Prob. 42PCh. 6 - Prob. 43PCh. 6 - Prob. 44PCh. 6 - Prob. 45PCh. 6 - Prob. 46PCh. 6 - Prob. 47PCh. 6 - Prob. 48PCh. 6 - Prob. 49PCh. 6 - Prob. 50PCh. 6 - Prob. 51PCh. 6 - Prob. 52PCh. 6 - Prob. 53PCh. 6 - Prob. 54PCh. 6 - Prob. 55PCh. 6 - Prob. 56PCh. 6 - Prob. 57PCh. 6 - Prob. 58PCh. 6 - Prob. 59PCh. 6 - Prob. 60PCh. 6 - Prob. 61PCh. 6 - Prob. 62PCh. 6 - Prob. 63PCh. 6 - Prob. 64PCh. 6 - Prob. 65PCh. 6 - Prob. 66PCh. 6 - Prob. 67PCh. 6 - Prob. 68PCh. 6 - Prob. 69PCh. 6 - Prob. 70PCh. 6 - Prob. 71PCh. 6 - Prob. 72PCh. 6 - Prob. 73PCh. 6 - Prob. 74PCh. 6 - Prob. 75PCh. 6 - Prob. 76PCh. 6 - Prob. 77PCh. 6 - Prob. 78PCh. 6 - Prob. 79PCh. 6 - Prob. 80PCh. 6 - Prob. 81PCh. 6 - Prob. 82PCh. 6 - Prob. 83PCh. 6 - Prob. 84PCh. 6 - Prob. 85PCh. 6 - Prob. 86PCh. 6 - Prob. 87PCh. 6 - Prob. 88PCh. 6 - Prob. 89PCh. 6 - Prob. 90PCh. 6 - Prob. 91PCh. 6 - Prob. 92PCh. 6 - This problem is based on Motorolas online method...Ch. 6 - Prob. 94PCh. 6 - Prob. 95PCh. 6 - Prob. 96PCh. 6 - Prob. 97PCh. 6 - Prob. 98PCh. 6 - Prob. 99PCh. 6 - Prob. 100PCh. 6 - Prob. 1CCh. 6 - Prob. 2CCh. 6 - Prob. 3.1CCh. 6 - Prob. 3.2CCh. 6 - Prob. 3.3CCh. 6 - Prob. 3.4CCh. 6 - Prob. 3.5CCh. 6 - Prob. 3.6C
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- . A commercial orchard grows, picks, and packs apples and pears. A peck (quarter bushel) of apples takes 4 minutes to pick and 5 minutes to pack; a peck of pears takes 5 minutes to pick and 4 minutes to pack. Only one picker and one packer are available. How many pecks each of apples and pears should be picked and packet every hour (60 minutes) if the profit is $3/peck for apples and $2/peck for pears? Solve graphically as a linear program and confirm analytically.arrow_forwardA manufacturing process has a i xed cost of $150,000 per month. Each unit of product being produced contains $25 worth of material and takes $45 of labor. How many units are needed to break even if each completed unit has a value of $90?arrow_forwardIn order to produce 1000 units of X in a week units X is scheduled weekly for Operation B (due to 5% scrap ratio) units X is scheduled weekly for Operation A (due to 2% scrap ratio) Based on your answer in part a, find the number of machines required to produce 1000 units of X per week. The total time required to perform Operation B = minutes per week The total time required to perform Operation A = minutes per week H= Available Time in a week = minutes /week Thus FA = . FB = . Since both of the operations A and B are performed on the same machine machines are requiredarrow_forward
- List the system of inequalities which describe B in the graph below.ECON1003 Mathematics for Social Sciences Unit 3_Version 1 Page 33 6. Anya’s Jeans has production process organized in threedistinct stages: cutting; sewing and finishing. She produces threetypes of jeans, namely peddle-pushers, hipsters and low cuts. Thenumber of minutes each type requires in each production processin shown below.Type Cutting Sewing FinishingPeddle-Pusher 4 6 2Hipster 6 7 4Low Rider 9 3 6On average, there are 6400 minutes of cutting time, 3500 minutes ofsewing time and 2400 minutes of finishing time each day. Given thatthe company makes $10 profit on each peddle-pusher $ 50 on eachhipster and $60 on each low cut and that the company sells all thejeans made. List the system of inequalities for the cutting, sewingand finishing constraints.arrow_forward9Qarrow_forwardA company produces a line of golf putters composed of three models. The demandfor model A is 500 per month, for B is 400, and for C is 300. What would be themixed-model sequence if some of each were made each day?arrow_forward
- A Company produces a component for use in the aerospace industry. The component consists of three parts (A, B and C), which are purchased externally and cost 50c, 60c and 70c per piece respectively. Parts A and B are assembled first on assembly line 1, which produces 150 components per hour. Part C undergoes a drilling operation before being finally assembled with the output from assembly line 1. There are six drilling machines in total, but only three are currently operational. Each drilling machine drills part C at a rate of 30 parts per hour. The final assembly line has a production capacity of 100 components per hour. At present, components are produced eight hours a day, five days a week. If the need arises, management can add a second shift of eight hours for the assembly lines only. The cost of assembly labour is 40c per assembly operation for each assembly line; the cost of drilling labour is 20c per part. For drilling, the cost of electricity is 10c per part. The overhead cost…arrow_forwardsniparrow_forwardThe recipe for a fruit smoothie requires 2 cups of fruit per 6 cups of yogurt to maintain a 1/3 ratio. While making the fruit smoothie, Suzy accidentally puts 3 cups of fruit into the pitcher. How many cups of yogurt should be put out n the pitcher to maintain the ratio of 1/3?arrow_forward
- The recipe for a fruit smoothie requires 2 cups of fruit per 6 cups of yogurt to maintain a 1/3 ratio. While making the fruit smoothie, Suzy accidentally puts 3 cups of fruit into the pitcher. How many cups of yogurt should Suzy add to the pitcher to maintain the 1/3 ratio?arrow_forwardChobani's equipment runs for 10 hours and must be idle for four hours while being cleaned. Its plants operate day and night, all week long. What are the implications for the company's purchasing, inventory control, scheduling, and quality control functions?arrow_forwardP1 P4 P2 P3 P5 P5 P5 P6 ... P1 has a production rate of 15 units/hour, P2 = 30 units/hour, P3 = 10 units per hour, P4 = 4 units/hour, P5 = 1 unit(s) per hour for each P5 and P6 = 6 units per hour. Operation P4 occurs seperately from and simultaneously with operations P1-P3. Operation P5 has three parallel and identical lines; therefore, each part only needs to go through one of the three lines. Consider the following two independent improvements: Improvement 1: Change station P4 into two connected stations (P4-1 and P4-2, connected in series) that have process times of 4 min/unit and 6 min/unit respectively. Improvement 2: Add two additional P5 stations to give you 5 parallel and identical lines. Improvement 2 increases capacity because it improves the bottleneck. The new bottleneck is station P4 since the original bottleneck has a process time of The new yearly capacity would be units per year. a) Which of the two improvements will provide the largest increase in capacity? What is the…arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.