Operations Management: Sustainability and Supply Chain Management (12th Edition)
12th Edition
ISBN: 9780134130422
Author: Jay Heizer, Barry Render, Chuck Munson
Publisher: PEARSON
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter E, Problem 15P
Summary Introduction
To determine: The hours required for plane 12, 13, 14 and 15 and the cost for planes from plane 12 through plane 15.
Introduction:
Learning curve:
Learning curve is based on the premise that when a person is repeating a task or job again and again, the performance of the person on that job or task will improve. It will depict relationship between cost and output over a definitive period of time.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Assume that General Dynamics, which manufactures high-technology instruments for spacecraft, is considering the sale of a navigational unit to a government agency in India that wishes to launch its own communications satellite. The government agency plans to purchase 8 units, although it would also consider buying 16 units. General Dynamics has started a chart relating labor time required to units produced.
Unit Produced (X)
Time Required toProduce the Xth Unit
1
10,000 hours
2
8,000 hours
4
6,400 hours
8
?
16
?
Required:
a. Compute the labor time required to produce 8 and 16 units.b. Assume that labor time costs $125 per hour. Compare the cost of producing the 1st unit to the cost of producing the 16th unit. What is the percentage of the cost of the 16th unit to the cost of the 1st unit?
Esc
Hg Time: 1 hour, 51 minutes, 08 seconds.
* Question Completion Status:
1
2
3
4
5
6
7
8
9
10
12
13 14 15
16
17
18
31
32
19 20 21
22 23 24
25 26
28
29 30
A Moving to another question will save this response.
Question 16 of 32
Question 16
1 points
Save Answer
CASE: The correct implementation of new product development process helps minimize the risk of product failure. When Netflix wanted ideas for improving
the accuracy of its Cinematch online recommendation system, it decided to "open it up to the world," promising a $1 million prize for the best solution.
QUESTION: Identify the idea generation tool used by Netflix in this example.
***
For the toolbar, press ALT+F10 (PC) or ALT+FN+F10 (Mac).
BIUS Paragraph
V AV
V
Ix
V
L %0
V System Font V 12pt
8
C
FS
BI
A+
F3
B
!
1
F1
@
F2
F4
2
TW
11
الالالال
ER
F6
T
6
F7
Y
&
17
F8
*
U
8
F9
(
F10
9
27
-
F11
0
POWERED BY TINY
PriSc
F12
P
1
Inse
Course: work study and method engineering
Describe Learning curve and its types along with graph?
Chapter E Solutions
Operations Management: Sustainability and Supply Chain Management (12th Edition)
Ch. E - Prob. 1DQCh. E - Prob. 2DQCh. E - Prob. 3DQCh. E - Prob. 4DQCh. E - Prob. 5DQCh. E - Prob. 6DQCh. E - Prob. 7DQCh. E - Prob. 8DQCh. E - Prob. 1PCh. E - Prob. 2P
Ch. E - Prob. 3PCh. E - Prob. 4PCh. E - Prob. 5PCh. E - Prob. 6PCh. E - Prob. 7PCh. E - Prob. 8PCh. E - Prob. 9PCh. E - Prob. 10PCh. E - Prob. 11PCh. E - Prob. 12PCh. E - Prob. 13PCh. E - Suad Alwan, the purchasing agent for Dubai...Ch. E - Prob. 15PCh. E - Prob. 16PCh. E - Regional Power owns 25 small power generating...Ch. E - Prob. 18PCh. E - Prob. 19PCh. E - Prob. 20PCh. E - Prob. 21PCh. E - Prob. 22PCh. E - Prob. 23PCh. E - Prob. 24PCh. E - Prob. 25PCh. E - Using the accompanying log-log graph, answer the...Ch. E - Prob. 1CSCh. E - Prob. 2CSCh. E - Prob. 3CS
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- 5 A ) A small office has 4, 4-lamp fixtures. It takes 45 minutes to clean and re-lamp the entire room. Determine the per lamp LABOR cost for group re-lamping the office if each lamp costs $1.50 to buy and the labor rate is $35/hour. B) If the result of the previous calculation where 1.70 $/lamp with a lamp purchase price of $1.50 each and all lamps were replaced at 80% of their average life, compute the per lamp replacement cost for the officearrow_forwardDesign and development of a training programme is both time-consuming and expensive in the absence of professional expertise. The cost of designing a two-day programme may be anything between Rs. 5,000 to Rs.10,000 and the time may be around three to seven days. But the decades of hardcore HRD experience of IHRD professionals in the profession helps them to speed up the work for delivering the programme to their clients at the shortest possible time at affordable cost. Questions 1. Why is it that open programmes and customised programmes require different approaches in designing? 2 What are the major challenges in designing a training programme? 3. What are the competitive advantages of IHRD in training design?arrow_forwardQUESTION 14 Semana 3 4 2 60% 6 100% LC% 30% 70% 80% 90% A new equipment was installed with this learning curve. The material cost is $2 per unit. At this moment, the actual waste % is 5% for this process. The equipment capacity is 28470 unites per week. Determine the learning curve cost for the material.arrow_forward
- TOYS AND JOB DESIGN AT THE HOVEY AND BEARD COMPANY The following is a situation that occurred in the Hovey and Beard Company, as reported by J. V. Clark. This company manufactured a line of wooden toys. One part of the process involved spray painting partially assembled toys, after which the toys were hung on moving hooks that carried them through a drying oven. The operation, staffed entirely by women, was plagued with absenteeism, high turnover, and low morale. Each woman at her paint booth would take a toy from the tray beside her, position it in a fixture, and spray on the color according to the required pattern. She then would release the toy and hang it on the conveyor hook. The rate at which the hooks moved had been calculated so that each woman, once fully trained, would be able to hang a painted toy on each hook before it passed beyond her reach. The women who worked in the paint room were on a group incentive plan that tied their earnings to the…arrow_forwardWeighted-Average Method Arsenio Company manufactures a single product that goes throughtwo processes, mixing and cooking. The following data pertain to the mixing department for August:[LO 6-2, 6-5][LO 6-2, 6-3, 6-4]Work-in-Process Inventory, August 1Conversion: 80% complete 34,000 unitsWork-in-Process Inventory, August 31Conversion: 50% complete 30,000 unitsUnits started 66,000Units completed and transferred out ?CostsWork-in-Process Inventory, August 1Material X $ 64,800Material Y 88,100Conversion 119,880Costs added during AugustMaterial X 152,700Material Y 135,900Conversion 305,120Material X is added at the beginning of work in the mixing department. Material Y is also added in themixing department, but not until units are 60% complete with regard to conversion. Conversion costs areincurred uniformly during the process. The company uses the weighted-average cost method.Required1. Calculate the equivalent units of material X, material Y, and conversion for the mixing department.2.…arrow_forwardUparrow_forward
- Design a job analysis for the position of department head (HR), of a pharmaceutical firmarrow_forwardGive examples of daily activities where the law of diminishing returns applies (10 Marks)arrow_forward13-2. (Pareto Chart & Fishbone Diagram). Smith, Schroeder, and Torn (SST) is a short-haul household furniture moving company. SST"s labor force, selected from the local community college football team, is temporary and part-time. SST is concerned with recent complaints, as tabulated on the following tally sheet. Complaint Broken glass Delivered to wrong address Furniture rubbed together while on truck Late delivery Late arrival for pickup ///// /// ///// ///// // ///// ///// Missing items Nicks and scratches from rough handling ///// Soiled Upholstery ///// ///// Tally ///// / /// ///// I // ///// ///// ///// /// a. Use a Pareto chart to identify the "few vital" complaint problems. b. Use a cause-and-effect diagram to identify potential causes of the complaintsarrow_forward
- Machine-hours Direct labor-hours Total fixed manufacturing overhead cost Variable manufacturing overhead per machine-hour Variable manufacturing overhead per direct labor-hour Cost summary for Job 407 Machine-hours Direct labor-hours Direct materials Milling Department Assembly 60,000 3,000 8,000 80,000 $390,000 $500,000 $2.00 $3.75 Department Milling Assembly 90 4 5 20 $800 $370 $70 $280 Direct labor cost Enter a formula into each of the cells marked with a ? below Step 1: Calculate the estimated total manufacturing overhead cost for each department Milling Assembly Total fixed manufacturing overhead cost $390,000 ? Variable manufacturing overhead per machine-hour or direct labor-hour $2.00 ? Total machine-hours or direct labor-hours 68,000 ? Total variable manufacturing overhead ? ? Total manufacturing overhead ? Step 2: Calculate the predetermined overhead rate in each department Milling Assembly Total manufacturing overhead ? ? Total machine-hours or direct labor-hours ? ?…arrow_forwardCan a process get stalled? Provide reasoned feedback.arrow_forward10. Please explain in detail the X-efficiency Theory of Leibensteinarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.