Pearson eText Principles of Operations Management: Sustainability and Supply Chain Management -- Instant Access (Pearson+)
11th Edition
ISBN: 9780135639221
Author: Jay Heizer, Barry Render
Publisher: PEARSON+
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 7.S, Problem 31P
a)
Summary Introduction
To determine: The alternative to be chosen when the expected volume is 28,500 units.
b)
Summary Introduction
To determine: The alternative to be chosen when the expected volume is 15,000 units.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
S7.19
Markland Manufacturing intends to increase capacity by overcoming a bottleneck operation by adding
new equipment. Two vendors have presented proposals. The fixed costs for proposal A are $50,000, and
for proposal B, $70,000. The variable cost for A is $12.00, and for B, $10.00. The revenue generated by
each unit is $20.00. Given the data in Problem, at what volume (units) of output would the two
alternatives yield the same profit?
1.if manufacturing capacity can only be utlized in manufacturing the keyboards what should company do, make/buy?
if the company could utlize the spare capacity in producing 30,000 modems,with vaiable cost $12 per unit.what should the company do, knowing that it can sell the modems at $22 per unit?
Two highway capacity improvement plans have been proposed for a congestedsuburban arterial. Select the most cost-effective alternative using present worthanalysis. Assume an interest rate of 5% per year and a design life of 20 years for eachalternative.Alternative A entails improvements to traffic signals at an initial cost of $82,000 anda salvage value of $5,000. Annual maintenance costs will be $700 per year.Alternative B entails traffic signal improvements and addition of a left-turn lane atan initial cost of $72,000 and no salvage value. Annual maintenance costs will be$1,200 per year, except in year 10 in which a rehabilitation will cost $14,000.
Chapter 7 Solutions
Pearson eText Principles of Operations Management: Sustainability and Supply Chain Management -- Instant Access (Pearson+)
Ch. 7.S - Prob. 1DQCh. 7.S - Prob. 2DQCh. 7.S - Prob. 3DQCh. 7.S - Prob. 4DQCh. 7.S - Prob. 5DQCh. 7.S - Distinguish between bottleneck time and throughput...Ch. 7.S - Prob. 7DQCh. 7.S - Prob. 8DQCh. 7.S - Prob. 9DQCh. 7.S - Prob. 10DQ
Ch. 7.S - Prob. 11DQCh. 7.S - Prob. 12DQCh. 7.S - What are the techniques available to operations...Ch. 7.S - Amy Xias plant was designed to produce 7,000...Ch. 7.S - For the post month, the plant in Problem S7.1,...Ch. 7.S - Prob. 3PCh. 7.S - Prob. 4PCh. 7.S - Prob. 5PCh. 7.S - The effective capacity and efficiency for the next...Ch. 7.S - Southeastern Oklahoma State Universitys business...Ch. 7.S - Prob. 8PCh. 7.S - Prob. 9PCh. 7.S - Prob. 10PCh. 7.S - The three-station work cell illustrated in Figure...Ch. 7.S - The three-station work cell at Pullman Mfg., Inc....Ch. 7.S - The Pullman Mfg., Inc., three-station work cell...Ch. 7.S - Prob. 14PCh. 7.S - 10 minutes per unit. Part 2 is simultaneously...Ch. 7.S - Prob. 16PCh. 7.S - Prob. 17PCh. 7.S - Using the data in Problem S7.17: a) What is the...Ch. 7.S - Prob. 19PCh. 7.S - Prob. 20PCh. 7.S - Prob. 21PCh. 7.S - Prob. 22PCh. 7.S - Prob. 23PCh. 7.S - Prob. 24PCh. 7.S - Prob. 25PCh. 7.S - Prob. 26PCh. 7.S - Prob. 27PCh. 7.S - Prob. 28PCh. 7.S - Prob. 29PCh. 7.S - Prob. 30PCh. 7.S - Prob. 31PCh. 7.S - Prob. 32PCh. 7.S - Prob. 33PCh. 7.S - Prob. 34PCh. 7.S - Prob. 35PCh. 7.S - Prob. 36PCh. 7.S - Prob. 37PCh. 7.S - Prob. 38PCh. 7.S - Prob. 39PCh. 7.S - Prob. 40PCh. 7.S - Prob. 41PCh. 7.S - Prob. 42PCh. 7.S - Prob. 43PCh. 7.S - Prob. 44PCh. 7.S - Prob. 45PCh. 7.S - Prob. 1VCCh. 7.S - a capacity expansion plan and a new 11-story...Ch. 7.S - a capacity expansion plan and a new 11-story...Ch. 7 - Ethical Dilemma For the sake of efficiency and...Ch. 7 - Prob. 1DQCh. 7 - Prob. 2DQCh. 7 - Prob. 3DQCh. 7 - Prob. 4DQCh. 7 - Prob. 5DQCh. 7 - Prob. 6DQCh. 7 - Prob. 7DQCh. 7 - Prob. 8DQCh. 7 - Prob. 9DQCh. 7 - Prob. 10DQCh. 7 - Prob. 11DQCh. 7 - Prob. 12DQCh. 7 - Prob. 13DQCh. 7 - Prob. 14DQCh. 7 - Prob. 15DQCh. 7 - Prob. 16DQCh. 7 - Prob. 17DQCh. 7 - Prob. 18DQCh. 7 - Prob. 19DQCh. 7 - Prob. 1PCh. 7 - Usingthedatain Problem 7.1, determinethemost...Ch. 7 - Prob. 3PCh. 7 - Refer to Problem 7.1. If a contract for the second...Ch. 7 - Stan Fawcetts company is considering producing a...Ch. 7 - Prob. 6PCh. 7 - Prob. 7PCh. 7 - Prob. 8PCh. 7 - Metters Cabinets, Inc., needs to choose a...Ch. 7 - Prob. 10PCh. 7 - Nagle Electric. Inc., of Lincoln, Nebraska, must...Ch. 7 - Stapleton Manufacturing intends to increase...Ch. 7 - Prepare a flowchart for one of the following: a)...Ch. 7 - Prepare a process chart for one of the activities...Ch. 7 - Prob. 15PCh. 7 - Prob. 16PCh. 7 - Prob. 17PCh. 7 - Prob. 1CSCh. 7 - Prob. 2CSCh. 7 - Prob. 3CSCh. 7 - Process Strategy at Wheeled Coach Wheeled Coach,...Ch. 7 - Prob. 1.2VCCh. 7 - Prob. 1.3VCCh. 7 - Prob. 1.4VCCh. 7 - Alaska Airlines: 20-Minute Baggage...Ch. 7 - Prob. 2.2VCCh. 7 - Prob. 2.3VCCh. 7 - Prob. 2.4VCCh. 7 - Prob. 2.5VCCh. 7 - Prob. 3.1VCCh. 7 - Prob. 3.2VCCh. 7 - Prob. 3.3VCCh. 7 - Prob. 3.4VC
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- Given the capacity planning discussion in the text (see Figure S7.6 ), what approach is being taken by Arnold Palmer Hospital toward matching capacity to demand?arrow_forward. Suppose a manager is using maximum EMV as a basis for making a capacity decision and, in the process, obtains a result in which there is a virtual tie between two of the seven alternatives. How is the manager to make a decision?arrow_forwardNeed alllarrow_forward
- Problems 2 Helen Murvis, hospital administrator for Portland General Hospital, is trying to determine whether to build a large wing onto the existing hospital, a small wing, or no wing at all. If the population of Portland continues to grow, a large wing could return $150,000 to the hospital each year. If the small wing were built, it would return S$60,000 to the hospital each year if the population continues to grow. If the population of Portland remains the same, the hospital would encounter a loss of $85,000 if the large wing were built. Furthermore, a loss of $45,000 would be realized if the small wing were constructed and the population remains the same. Unfortunately, Helen does not have any information about the future population of Portland * Develop a decision table for this problem. * Determine the best decision using the following decision criteria 1. Мaximax 2. Маximin 3. Minimax Regret Hurwicz (use a coefficient of realism of 0.75) 5. Equal likelihood 6. Expected Value 7.…arrow_forwardUsing the information from Module 7 Problem 1 Part A: Stapleton Manufacturing intends to increase capacity through the addition of new equipment. Two vendors have presented proposals. The fixed cost for proposal A is $63,000, and for proposal B, $27,000. The variable cost for A is $12, and for B, $15. The revenue generated by each unit is $19. At an expected volume of 6,700 units, which alternative should be chosen? Be sure to show your work.arrow_forwardEMV APPLIED TO CAPACITY DECISION Southern Hospital Supplies, a company that makes hospital gowns, is considering capacity expansion.APPROACH: c Southern’s major alternatives are to do nothing, build a small plant, build a medium plant, or build a large plant. The new facility would produce a new type of gown, and currently the po-tential or marketability for this product is unknown. If a large plant is built and a favorable market ex-ists, a profit of $100,000 could be realized. An unfavorable market would yield a $90,000 loss. However, a medium plant would earn a $60,000 profit with a favorable market. A $10,000 loss would result froman unfavorable market. A small plant, on the other hand, would return $40,000 with favorable marketconditions and lose only $5,000 in an unfavorable market. Of course, there is always the option of doingnothing.Recent market research indicates that there is a .4 probability of a favorable market, which meansthat there is also a .6 probability of an…arrow_forward
- Evaluate capacity alternatives using decision tree ?arrow_forwardSystem Options. JR Davidson recently started a practice in Landscape Design and is considering the purchase of an automated drafting system. JR can purchase a system with three possible drafting capacities. The payoffs for having any of these systems depend on the demand for drafting services over the next few years. The costs for each system are shown as follows along with JR’s assessment of the probabilities that demand will match the capacity of each one. Total Cost Probability Small system $11,000 0.29 Medium system $14,000 0.22 Large system $20,000 0.49 Working at capacity, each system would generate net cash flow at a yearly rate of 50% of its total cost. If a system is chosen that is smaller than demand, it would work at capacity. If a system is chosen that is larger than demand, revenue from the system would be limited by demand. For convenience, JR has initially decided to count cash flow for three years, without discounting. For example, if…arrow_forwardCortez Manufacturing intends to increase capacity by overcoming a bottleneck operation by adding new equipment. Two vendors have presented proposals. The fixed costs are $50,000 for proposal A and $75,000 for proposal B. In addition to the proposed fixed costs from the two ve management at Cortez anticipates that they will have to spend $8,000 for installations be completed. The variable cost is $12.00 for A and $11.00 for B. The revenue generated by each unit is $24.00. a) The break-even point in dollars for the proposal by Vendor A = $ (round your response to the nearest whole number). b) The break-even point in dollars for the proposal by Vendor B = $| (round your response to the nearest whole number).arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Inventory Management | Concepts, Examples and Solved Problems; Author: Dr. Bharatendra Rai;https://www.youtube.com/watch?v=2n9NLZTIlz8;License: Standard YouTube License, CC-BY