Process Strategy at Wheeled Coach
Wheeled Coach, based in Winter Park, Florida, is the world’s largest manufacturer of ambulances. Working four 10-hour days each week, 350 employees make only custom-made ambulances; virtually every vehicle is unique. Wheeled Coach accommodates the marketplace by providing a wide variety of options and an engineering staff accustomed to innovation and custom design. Continuing growth, which now requires that more than 20 ambulances roll off the assembly line each week, makes process design a continuing challenge. Wheeled Coach’s response has been to build a focused factory: Wheeled Coach builds nothing but ambulances. Within the focused factory, Wheeled Coach established work cells for every major module feeding an assembly line, including aluminum bodies, electrical wiring harnesses, interior cabinets, windows, painting, and upholstery.
Labor standards drive the
Discussion Questions*
1. Why do you think major auto manufacturers do not build ambulances?
2. What is an alternative process strategy to the assembly line that Wheeled Coach currently uses?
3. Why is it more efficient for the work cells to prepare “modules” and deliver them to the assembly line than it would be to produce the component (e.g., interior upholstery) on the line?
4. How does Wheeled Coach manage the tasks to be performed at each work station?
*You may wish to view the video that accompanies this case before addressing these questions.
Want to see the full answer?
Check out a sample textbook solutionChapter 7 Solutions
Pearson eText Principles of Operations Management: Sustainability and Supply Chain Management -- Instant Access (Pearson+)
- - In about 300 words, write a part-by-part description of a Canon digital camera. Include at least FIVE parts in the description using the information provided in the table below.arrow_forwardDESIGN or DRAW a high level “as-is” process diagram depicting how a trade would be made, under "Manager Investment Strategist in Finance department involved in Broker business". The diagram should be for the model showing the bands, process flows, roles, decisions and/or cross functional interactions required. As a swimlane diagram.arrow_forwardExercise • Now, it's your turn!! • How would you define quality? • What model can you generate that captures your personal definition of quality?arrow_forward
- Process identification• What? Why? and Output.• Process landscape development– Case types– Functionsarrow_forwardWheeled Coach, based in Winter Park, Florida, is the world's largest manufacturer of ambulance. Working four 10 hour days each week, 350 employees make only custom-made ambulances. Virtually every vehicle is unique. Wheeled Coach accommodates the marketplace by providing a wide variety of options and an engineering staff accustomed to innovation and custom design. Continuing growth, which now requires that more than 20 ambulances roll off the assembly line each week, makes process design a continuing challenge. Wheeled Coach's response has been to build a focused factory. Wheeled Coach established work cells for every major module feeding an assembly line, including aluminum bodies, electrical wiring harnesses, interior cabinets, windows, painting, and upholstery. Labor standards drive the schedule so that every work cell feed the assembly line on schedule, just- in-time for installations. The chassis, usually that of a Ford truck, moves to a station at which the aluminum body is…arrow_forward* 9.17 Tailwind, Inc., produces high-quality but cxpensive training shoes for runners. The Tailwind shoe, which sells for $210, contains both gas- and liquid-filled compartments to pro- vide more stability and better protection against knee, foot, and back injuries. Manufacturing the shocs requires 10 separate tasks. There are 400 minutes available for manufacturing the shoes in the plant cach day. Daily demand is 60. The information for the tasks is as follows: TASK MUST FOLLOW TASK USTED BELOW TASK PERFORMANCE TIME (min) 1 - 2 D 4 B E C, D A 2 H. 5. 1 E, H a) Draw the precedence diagram. b) Assign tasks to the minimum feasible number of workstations according to the "ranked positioned weight" decision rule. ) What is the efficiency of the process you completed in (b)? d) What is the idle time per cycle? PX 1. B.arrow_forward
- Give an example of mass customization not discussed in the chapter.arrow_forwardSEM - Chap 1 and 2 Test (3) - Word (Product Activation Failed) ert Design Layout References Mailings Review View Acrobat O Tell me what you want to do... Tahoma -/12 - A A Aa - 21 T AaBbCcDc AaBbCcD AaBbC AaBbCcl AaB AaBbCc 3 IU abe x, x² - aly , A - I Normal I No Spac. Heading 1 Heading 2 Title Subtitl Font Paragraph Styles 19. An endorsement is when a. An athlete supports a particular product b. Tiger Woods driving a Buick automobile C. a new business venture d. both a and barrow_forwardWhat is process strategy?arrow_forward
- Demonstrate why it is important to analyze requirements?arrow_forwardOPERARION OF MANUFACTURING SYSTEM How to define the following with detail 1) Blanket Order 2)Cross-Docking 3)Nash in SCM 4) Vendor managed inventory (VMI) 5)Stackelbergarrow_forwardrations Management Spring21 would be most likely to be made with a fixed position layout? O a. None of them O b. Rolls Royce car c. Pen O d. Boeing passenger airplane O e. Books US PAGE XMAG241C 144 H (Ims 1500R CURVED D LED GAMING MONITORarrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.