Principles Of Operations Management
11th Edition
ISBN: 9780135173930
Author: RENDER, Barry, HEIZER, Jay, Munson, Chuck
Publisher: Pearson,
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 7.S, Problem 30P
Summary Introduction
To determine: The volume of output (Units) the two alternatives would yield at the same
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
S7.19
Markland Manufacturing intends to increase capacity by overcoming a bottleneck operation by adding
new equipment. Two vendors have presented proposals. The fixed costs for proposal A are $50,000, and
for proposal B, $70,000. The variable cost for A is $12.00, and for B, $10.00. The revenue generated by
each unit is $20.00. Given the data in Problem, at what volume (units) of output would the two
alternatives yield the same profit?
Two highway capacity improvement plans have been proposed for a congestedsuburban arterial. Select the most cost-effective alternative using present worthanalysis. Assume an interest rate of 5% per year and a design life of 20 years for eachalternative.Alternative A entails improvements to traffic signals at an initial cost of $82,000 anda salvage value of $5,000. Annual maintenance costs will be $700 per year.Alternative B entails traffic signal improvements and addition of a left-turn lane atan initial cost of $72,000 and no salvage value. Annual maintenance costs will be$1,200 per year, except in year 10 in which a rehabilitation will cost $14,000.
1.if manufacturing capacity can only be utlized in manufacturing the keyboards what should company do, make/buy?
if the company could utlize the spare capacity in producing 30,000 modems,with vaiable cost $12 per unit.what should the company do, knowing that it can sell the modems at $22 per unit?
Chapter 7 Solutions
Principles Of Operations Management
Ch. 7.S - Prob. 1DQCh. 7.S - Prob. 2DQCh. 7.S - Prob. 3DQCh. 7.S - Prob. 4DQCh. 7.S - Prob. 5DQCh. 7.S - Distinguish between bottleneck time and throughput...Ch. 7.S - Prob. 7DQCh. 7.S - Prob. 8DQCh. 7.S - Prob. 9DQCh. 7.S - Prob. 10DQ
Ch. 7.S - Prob. 11DQCh. 7.S - Prob. 12DQCh. 7.S - What are the techniques available to operations...Ch. 7.S - Amy Xias plant was designed to produce 7,000...Ch. 7.S - For the post month, the plant in Problem S7.1,...Ch. 7.S - Prob. 3PCh. 7.S - Prob. 4PCh. 7.S - Prob. 5PCh. 7.S - The effective capacity and efficiency for the next...Ch. 7.S - Southeastern Oklahoma State Universitys business...Ch. 7.S - Prob. 8PCh. 7.S - Prob. 9PCh. 7.S - Prob. 10PCh. 7.S - The three-station work cell illustrated in Figure...Ch. 7.S - The three-station work cell at Pullman Mfg., Inc....Ch. 7.S - The Pullman Mfg., Inc., three-station work cell...Ch. 7.S - Prob. 14PCh. 7.S - 10 minutes per unit. Part 2 is simultaneously...Ch. 7.S - Prob. 16PCh. 7.S - Prob. 17PCh. 7.S - Using the data in Problem S7.17: a) What is the...Ch. 7.S - Prob. 19PCh. 7.S - Prob. 20PCh. 7.S - Prob. 21PCh. 7.S - Prob. 22PCh. 7.S - Prob. 23PCh. 7.S - Prob. 24PCh. 7.S - Prob. 25PCh. 7.S - Prob. 26PCh. 7.S - Prob. 27PCh. 7.S - Prob. 28PCh. 7.S - Prob. 29PCh. 7.S - Prob. 30PCh. 7.S - Prob. 31PCh. 7.S - Prob. 32PCh. 7.S - Prob. 33PCh. 7.S - Prob. 34PCh. 7.S - Prob. 35PCh. 7.S - Prob. 36PCh. 7.S - Prob. 37PCh. 7.S - Prob. 38PCh. 7.S - Prob. 39PCh. 7.S - Prob. 40PCh. 7.S - Prob. 41PCh. 7.S - Prob. 42PCh. 7.S - Prob. 43PCh. 7.S - Prob. 44PCh. 7.S - Prob. 45PCh. 7.S - Prob. 1VCCh. 7.S - a capacity expansion plan and a new 11-story...Ch. 7.S - a capacity expansion plan and a new 11-story...Ch. 7 - Ethical Dilemma For the sake of efficiency and...Ch. 7 - Prob. 1DQCh. 7 - Prob. 2DQCh. 7 - Prob. 3DQCh. 7 - Prob. 4DQCh. 7 - Prob. 5DQCh. 7 - Prob. 6DQCh. 7 - Prob. 7DQCh. 7 - Prob. 8DQCh. 7 - Prob. 9DQCh. 7 - Prob. 10DQCh. 7 - Prob. 11DQCh. 7 - Prob. 12DQCh. 7 - Prob. 13DQCh. 7 - Prob. 14DQCh. 7 - Prob. 15DQCh. 7 - Prob. 16DQCh. 7 - Prob. 17DQCh. 7 - Prob. 18DQCh. 7 - Prob. 19DQCh. 7 - Prob. 1PCh. 7 - Usingthedatain Problem 7.1, determinethemost...Ch. 7 - Prob. 3PCh. 7 - Refer to Problem 7.1. If a contract for the second...Ch. 7 - Stan Fawcetts company is considering producing a...Ch. 7 - Prob. 6PCh. 7 - Prob. 7PCh. 7 - Prob. 8PCh. 7 - Metters Cabinets, Inc., needs to choose a...Ch. 7 - Prob. 10PCh. 7 - Nagle Electric. Inc., of Lincoln, Nebraska, must...Ch. 7 - Stapleton Manufacturing intends to increase...Ch. 7 - Prepare a flowchart for one of the following: a)...Ch. 7 - Prepare a process chart for one of the activities...Ch. 7 - Prob. 15PCh. 7 - Prob. 16PCh. 7 - Prob. 17PCh. 7 - Prob. 1CSCh. 7 - Prob. 2CSCh. 7 - Prob. 3CSCh. 7 - Process Strategy at Wheeled Coach Wheeled Coach,...Ch. 7 - Prob. 1.2VCCh. 7 - Prob. 1.3VCCh. 7 - Prob. 1.4VCCh. 7 - Alaska Airlines: 20-Minute Baggage...Ch. 7 - Prob. 2.2VCCh. 7 - Prob. 2.3VCCh. 7 - Prob. 2.4VCCh. 7 - Prob. 2.5VCCh. 7 - Prob. 3.1VCCh. 7 - Prob. 3.2VCCh. 7 - Prob. 3.3VCCh. 7 - Prob. 3.4VC
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- 4arrow_forwardProblem#1 Tom Schmid is thinking about buying a Nordic ski machine. The three factors important to him are price, ease of use, and the ability to store the exercise equipment in a closet when he is done using it. Given the following data, help Tom determine the best machine for him: FACTOR WEIGHTS FACTOR IMPORTANCE WEIGHT Price 0.9 Ease of use Storage 0.75 0.6 FACTOR EVALUATIONS FACTOR PROFESSIONAL NORDIC SKIER ECONO NORDIC SKIER Price 0.5 0.8 Ease of use 0.95 0.6 Storage 0.9 0.7arrow_forwardS7.18 Markland Manufacturing intends to increase capacity by overcoming a bottleneck operation by adding new equipment. Two vendors have presented proposals. The fixed costs for proposal A are $50,000, and for proposal B, $70,000. The variable cost for A is $12.00, and for B, $10.00. The revenue generated by each unit is $20.00. Using the data in Problem a) What is the break-even point in dollars for proposal A if you add $10,000 installation to the fixed cost? b) What is the break-even point in dollars for proposal B if you add $10,000 installation to the fixed cost?arrow_forward
- Need alllarrow_forwardA real estate agent is considering changing her cell phone plan. There are three plans to choosefrom, all of which involve a monthly service charge of $20. Plan A has a cost of $.45 a minute fordaytime calls and $.20 a minute for evening calls. Plan B has a charge of $.55 a minute for daytime calls and $.15 a minute for evening calls. Plan C has a flat rate of $80 with 200 minutes ofcalls allowed per month and a charge of $.40 per minute beyond that, day or evening.a. Determine the total charge under each plan for this case: 120 minutes of day calls and 40 minutes of evening calls in a month.arrow_forwardPls solve both questions for good ratingarrow_forward
- Cost Estimation; Average Cost Chloe’s Cafe bakes croissants that it sells to local restaurants andgrocery stores. The average costs to bake the croissants are $0.55 for 2,500 and $0.50 for 5,000.Required If the total cost function for croissants is linear, what will be the average cost to bake 4,200?arrow_forwardA real estate agent is considering changing her land line phone plan. There are three plans to choose from, all of which involve a monthly service charge of $20. Plan A has a cost of $.43 a minute for daytime calls and $.18 a minute for evening calls. Plan B has a charge of $.53 a minute for daytime calls and $.15 a minute for evening calls. Plan C has a flat rate of $80 with 250 minutes of calls allowed per month and a charge of $.40 per minute beyond that, day or evening. a. Determine the total charge under each plan for this case: 140 minutes of day calls and 60 minutes of evening calls in a month. (Do not round intermediate calculations. Round your answer to 2 decimal places.) b. If the agent will only use the service for daytime calls, over what range of call minutes will each plan be optimal? (Round each answer to the nearest whole number. Include the indifference point itself in each answer.) c. Suppose that the agent expects both daytime and evening calls. At what point…arrow_forward1: Suppose the company has identified the following three possible demand scenarios: Demand (Units per year) Probability 25,000 0.3 60,000 0.4 100,000 0.3 1. If the capacity is set at 80,000, how much of a capacity cushion is here? What is the capacity utilization? 2. What is the probability of idle capacity if the capacity is 80,000? 3. If it costs $25 per units lost business and $50 to build a unit of capacity, how much capacity should be built to minimize total cost?arrow_forward
- Point of indifference percent daytime minutesarrow_forwardA real estate agent is considering changing her land line phone plan. There are three plans to choose from, all of which involve a monthly service charge of $20. Plan A has a cost of $.38 a minute for daytime calls and $.17 a minute for evening calls. Plan B has a charge of $.47 a minute for daytime calls and $.14 a minute for evening calls. Plan C has a flat rate of $75 with 275 minutes of calls allowed per month and a charge of $.36 per minute beyond that, day or evening. a. Determine the total charge under each plan for this case: 120 minutes of day calls and 40 minutes of evening calls in a month. (Do not round intermediate calculations. Round your answer to 2 decimal places.) Cost for Plan A Cost for Plan B Cost for Plan C b. If the agent will only use the service for daytime calls, over what range of call minutes will each plan be optimal? (Round each answer to the nearest whole number. Include the indifference point itself in each answer.) Plan A is optimal from zero to minutes.…arrow_forwardA real estate agent is considering changing her land line phone plan. There are three plans to choose from, all of which involve a monthly service charge of $20. Plan A has a cost of $.45 a minute for daytime calls and $.20 a minute for evening calls. Plan B has a charge of $.55 a minute for daytime calls and $.15 a minute for evening calls. Plan C has a flat rate of $80 with 200 minutes of calls allowed per month and a charge of $.40 per minute beyond that, day or evening. a. Determine the total charge under each plan for this case: 120 minutes of day calls and 40 minutes of evening calls in a month. b. If the agent will only use the service for daytime calls, over what range of call minutes will each plan be optimal? (Round your answer to the nearest whole number.) c. Suppose that the agent expects both daytime and evening calls. At what point (i.e., percentage of total call minutes used for daytime calls) would she be indifferent between plans A and B? (Do not round intermediate…arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- MarketingMarketingISBN:9780357033791Author:Pride, William MPublisher:South Western Educational PublishingPractical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Marketing
Marketing
ISBN:9780357033791
Author:Pride, William M
Publisher:South Western Educational Publishing
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Inventory Management | Concepts, Examples and Solved Problems; Author: Dr. Bharatendra Rai;https://www.youtube.com/watch?v=2n9NLZTIlz8;License: Standard YouTube License, CC-BY