Architectural Drafting and Design (MindTap Course List)
7th Edition
ISBN: 9781285165738
Author: Alan Jefferis, David A. Madsen, David P. Madsen
Publisher: Cengage Learning
expand_more
expand_more
format_list_bulleted
Question
Chapter 7, Problem 7.12P
To determine
The amount of flooring material needed to be order.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Find the question, thanx.
The Carver Family did choose Warehouse Space A. The warehouse includes 8000 sq ft of showroom and workshop space. One half will be used to stock paint cans and rims. The warehouse has a height of 20 ft.
Tell how many rims you will stock. You must have exactly 4 cans of paint for every rim you stock.
A3
1.Use your own words and give examples wherever possible 2.The quality of your answer is more important than how long it is 3. Site the references 4. Answer it in a clear and right way.
Chapter 7 Solutions
Architectural Drafting and Design (MindTap Course List)
Ch. 7 - Prob. 7.1QCh. 7 - Prob. 7.2QCh. 7 - Prob. 7.3QCh. 7 - Prob. 7.4QCh. 7 - Prob. 7.5QCh. 7 - Prob. 7.6QCh. 7 - Prob. 7.7QCh. 7 - Prob. 7.8QCh. 7 - Prob. 7.9QCh. 7 - Prob. 7.10Q
Ch. 7 - Prob. 7.11QCh. 7 - Prob. 7.12QCh. 7 - Prob. 7.13QCh. 7 - Prob. 7.14QCh. 7 - Prob. 7.15QCh. 7 - Prob. 7.16QCh. 7 - Prob. 7.17QCh. 7 - Prob. 7.18QCh. 7 - Prob. 7.19QCh. 7 - Prob. 7.20QCh. 7 - Prob. 7.5PCh. 7 - Prob. 7.6PCh. 7 - Prob. 7.7PCh. 7 - Prob. 7.8PCh. 7 - Prob. 7.9PCh. 7 - Prob. 7.10PCh. 7 - Prob. 7.11PCh. 7 - Prob. 7.12PCh. 7 - Prob. 7.13PCh. 7 - Prob. 7.14PCh. 7 - Prob. 7.15P
Knowledge Booster
Similar questions
- Determine the number of modular bricks needed for the wall in Figure 12.26 below. The windows are 4 feet high by 4 feet wide and the door is 6 feet wide by 7 feet high. Assume that 675 bricks are required for 100 square feet of wall. Add 5 percent for waste. Write correct units. 48'-0" Find the net area of the wall and number of bricks: Blank #1: Gross wall area (sf) Blank #2: Areas of openings (sf) Blank #3: Net area of wall (s) Blank #4: Number of bricks- Add waste, and round off to a whole number Blank #5: Number of bricks 0-01arrow_forwardOne plumbing job requires 45 meters of PVC pipe, and a second job requires 30 meters. The pipe comes in 6-meter lengths only. How many sections should the plumber buy? How much pipe will be left over, assuming that there are no errors?arrow_forwardGiven a partial wood wall stud that is to be covered with marine plywood and lumber to be used for its wall stud is 2” x 2” x 10’ with a total length of 5.50 and a wall thickness of 0.075m. a. How many pieces of 2” x 2” x 10’ lumber is required? (use interior area only) b. If per board foot is ₱40.00, what is the total cost for its construction? c. How many kilograms of 2½” Ro. CWN is needed? d. How many pieces of Marine Plywood is needed?arrow_forward
- Question 11 Estimate the board feet of 30 pieces of lumber 2 X 6 inches and 10 feet long. 1) 200 2) 100 3) 300 4) 400 Savedarrow_forwardDefine Dynamic Replacement.arrow_forwardGiven a partial wood wall stud that is to be covered with marine plywood and lumber to be used for its wall stud is 2" x 2" x 10' with a total length of 5.50 and a wall thickness of 0.075m. a. How many pieces of 2" x 2" x 10' lumber is required? (use interior area only) b. If per board foot is P40.00, what is the total cost for its construction? c. How many kilograms of 2%" Ro. CWN is needed? d. How many pieces of Marine Plywood is needed? 5.00m 6.50m 2.80marrow_forward
- A heating and air-conditioning repair shop keeps 1,500 feet of 3⁄4-inch coppertubing in stock. An inventory shows that there are only 623 feet on hand. Howmany feet of tubing need to be ordered?arrow_forwardUsing one 3-foot by 8-foot piece of sheet metal, an installer makes four 6-inchcircular ducts. Each duct is 3 feet long. How many ducts can be made from26 sheets of metal?arrow_forwardhow would i create a prototype for a full size pumice stone bathmat? Provide a detailed description of the product, including how it will be developed.arrow_forward
- INSTRUCTIONS:- Estimate steel column manhours, material costs, and labor costs.- The benchmark data is given below.- The labor rate for all pieces of steel is $83/hrarrow_forwardThumbs-up will be given. Please write the complete solutions and Write Legibly. A 13 dozen pieces of 2"x3"x9' lumber is equivalent to _____ boardfeet. Express your answer in whole number.arrow_forwardUse the attached diagram and draw it as an isometric. Determine the number of Ts, elbows, couples and pipes that are needed in this plan. You will use this for your pricing of the project. You have prices for labor and materials; you will use these to estimate the project. Make sure you apply the labor rate per hour once you determine the number of labor hours. Dtermine number of each piece required to build the plumbing system Determine the estimate Need help with this!!!arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Architectural Drafting and Design (MindTap Course...Civil EngineeringISBN:9781285165738Author:Alan Jefferis, David A. Madsen, David P. MadsenPublisher:Cengage LearningConstruction Materials, Methods and Techniques (M...Civil EngineeringISBN:9781305086272Author:William P. Spence, Eva KultermannPublisher:Cengage LearningResidential Construction Academy: House Wiring (M...Civil EngineeringISBN:9781285852225Author:Gregory W FletcherPublisher:Cengage Learning
- Fundamentals Of Construction EstimatingCivil EngineeringISBN:9781337399395Author:Pratt, David J.Publisher:Cengage,
Architectural Drafting and Design (MindTap Course...
Civil Engineering
ISBN:9781285165738
Author:Alan Jefferis, David A. Madsen, David P. Madsen
Publisher:Cengage Learning
Construction Materials, Methods and Techniques (M...
Civil Engineering
ISBN:9781305086272
Author:William P. Spence, Eva Kultermann
Publisher:Cengage Learning
Residential Construction Academy: House Wiring (M...
Civil Engineering
ISBN:9781285852225
Author:Gregory W Fletcher
Publisher:Cengage Learning
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Cengage,