300,00.00 N POINT 4 _N=5,535.000 E=5,000.00 CP-101 N 4 CONTROL POINT N=5,487.752 452.85' S 01°08'07" W E=5,190.855 ELEV.=127.13 N=5138.589 E=5385.590 SWC BLDG TERNAL NTS 140.00 S 89°57'46" E 90°00'00" 160.00' POINT 3 N=5,534.425 E=5,884.810 90°00'00" 200.00' 113.31' COR COR .6 200.00' COR .5 300.00' COR .4 PROPOSED 1 STORY BUILDING FOUNDATION COR .3 FINISHED FLOOR ELEV.=132.00 COR .2 400.00' 99.64' POINT 1 N=5,000.000 E=5,000.000 CP 102 A CONTROL POINT N=5,034.995 E=5.181.884 NOTE: ALL PROPOSED BUILDING CORNERS HAVE 90* ANGLES. S 89°57'46" E NORTH 299.69' 157.39' 90°00'00" POINT A POINT B POINT 2 _N=4,999.425 E=5,884.810

Engineering Fundamentals: An Introduction to Engineering (MindTap Course List)
5th Edition
ISBN:9781305084766
Author:Saeed Moaveni
Publisher:Saeed Moaveni
Chapter7: Length And Length-related Variables In Engineering
Section: Chapter Questions
Problem 42P
icon
Related questions
Question

YOU HAVE A UNIFORM SUBGRADE ELEVATION FOR YOUR BUILDING FOUNDATION THAT HAS
BEEN VERIFIED. YOUR SLAB IS DESIGNED TO BE 12 INCHES THICK.USING THE GIVEN
DIMENSIONS AROUND THE PROPOSED BUILDING FOUNDATION, CALCULATE THE CUBIC FEET
AND THE CUBIC YARDS OF CONCRETE NEEDED FOR THE FOUNDATION

**Sketch Attached**

300,00.00 N
POINT 4
_N=5,535.000
E=5,000.00
CP-101
N
4 CONTROL POINT
N=5,487.752
452.85'
S 01°08'07" W
E=5,190.855
ELEV.=127.13
N=5138.589
E=5385.590
SWC BLDG
TERNAL
NTS
140.00
S 89°57'46" E
90°00'00"
160.00'
POINT 3
N=5,534.425
E=5,884.810
90°00'00"
200.00'
113.31'
COR
COR
.6
200.00'
COR
.5
300.00'
COR
.4
PROPOSED 1 STORY
BUILDING FOUNDATION
COR
.3
FINISHED FLOOR
ELEV.=132.00
COR
.2
400.00'
99.64'
POINT 1
N=5,000.000
E=5,000.000
CP 102
A CONTROL POINT
N=5,034.995
E=5.181.884
NOTE: ALL PROPOSED BUILDING CORNERS HAVE 90*
ANGLES.
S 89°57'46" E
NORTH
299.69'
157.39'
90°00'00"
POINT A
POINT B
POINT 2
_N=4,999.425
E=5,884.810
Transcribed Image Text:300,00.00 N POINT 4 _N=5,535.000 E=5,000.00 CP-101 N 4 CONTROL POINT N=5,487.752 452.85' S 01°08'07" W E=5,190.855 ELEV.=127.13 N=5138.589 E=5385.590 SWC BLDG TERNAL NTS 140.00 S 89°57'46" E 90°00'00" 160.00' POINT 3 N=5,534.425 E=5,884.810 90°00'00" 200.00' 113.31' COR COR .6 200.00' COR .5 300.00' COR .4 PROPOSED 1 STORY BUILDING FOUNDATION COR .3 FINISHED FLOOR ELEV.=132.00 COR .2 400.00' 99.64' POINT 1 N=5,000.000 E=5,000.000 CP 102 A CONTROL POINT N=5,034.995 E=5.181.884 NOTE: ALL PROPOSED BUILDING CORNERS HAVE 90* ANGLES. S 89°57'46" E NORTH 299.69' 157.39' 90°00'00" POINT A POINT B POINT 2 _N=4,999.425 E=5,884.810
Expert Solution
steps

Step by step

Solved in 2 steps with 1 images

Blurred answer
Recommended textbooks for you
Engineering Fundamentals: An Introduction to Engi…
Engineering Fundamentals: An Introduction to Engi…
Civil Engineering
ISBN:
9781305084766
Author:
Saeed Moaveni
Publisher:
Cengage Learning
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning
Architectural Drafting and Design (MindTap Course…
Architectural Drafting and Design (MindTap Course…
Civil Engineering
ISBN:
9781285165738
Author:
Alan Jefferis, David A. Madsen, David P. Madsen
Publisher:
Cengage Learning
Residential Construction Academy: House Wiring (M…
Residential Construction Academy: House Wiring (M…
Civil Engineering
ISBN:
9781285852225
Author:
Gregory W Fletcher
Publisher:
Cengage Learning
Construction Materials, Methods and Techniques (M…
Construction Materials, Methods and Techniques (M…
Civil Engineering
ISBN:
9781305086272
Author:
William P. Spence, Eva Kultermann
Publisher:
Cengage Learning
Residential Construction Academy: House Wiring (M…
Residential Construction Academy: House Wiring (M…
Civil Engineering
ISBN:
9781337402415
Author:
Gregory W Fletcher
Publisher:
Cengage Learning