Architectural Drafting and Design (MindTap Course List)
7th Edition
ISBN: 9781285165738
Author: Alan Jefferis, David A. Madsen, David P. Madsen
Publisher: Cengage Learning
expand_more
expand_more
format_list_bulleted
Question
Chapter 7, Problem 7.5P
To determine
The estimation of the cost of all the wall outlets.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
A heating supply store buys 6-inch metal flue pipe at $2.90 per 24-inchsection. The pipe is marked up 40%. What is the selling price of one section?
Kitchen Crafters purchases a tile-topped wooden kitchen island list priced at $480. It is available at either in option A 10/15/10 discount or Option B 20/15 discount. Which is cheaper, Option A or B?
i. What is the cheapest roofing system? What is the estimated unit cost of this system?
Chapter 7 Solutions
Architectural Drafting and Design (MindTap Course List)
Ch. 7 - Prob. 7.1QCh. 7 - Prob. 7.2QCh. 7 - Prob. 7.3QCh. 7 - Prob. 7.4QCh. 7 - Prob. 7.5QCh. 7 - Prob. 7.6QCh. 7 - Prob. 7.7QCh. 7 - Prob. 7.8QCh. 7 - Prob. 7.9QCh. 7 - Prob. 7.10Q
Ch. 7 - Prob. 7.11QCh. 7 - Prob. 7.12QCh. 7 - Prob. 7.13QCh. 7 - Prob. 7.14QCh. 7 - Prob. 7.15QCh. 7 - Prob. 7.16QCh. 7 - Prob. 7.17QCh. 7 - Prob. 7.18QCh. 7 - Prob. 7.19QCh. 7 - Prob. 7.20QCh. 7 - Prob. 7.5PCh. 7 - Prob. 7.6PCh. 7 - Prob. 7.7PCh. 7 - Prob. 7.8PCh. 7 - Prob. 7.9PCh. 7 - Prob. 7.10PCh. 7 - Prob. 7.11PCh. 7 - Prob. 7.12PCh. 7 - Prob. 7.13PCh. 7 - Prob. 7.14PCh. 7 - Prob. 7.15P
Knowledge Booster
Similar questions
- Estimate the cost of having an 18 ft by 22 ft brick patio wall installed?arrow_forwardThe Carver Family did choose Warehouse Space A. The warehouse includes 8000 sq ft of showroom and workshop space. One half will be used to stock paint cans and rims. The warehouse has a height of 20 ft. Tell how many rims you will stock. You must have exactly 4 cans of paint for every rim you stock.arrow_forwardDetermine the boq of the following plan, also determine the total number of bricks, plaster and paint cost of the following plan , also determine the labour hours, productivity rate ,fuel adjustment cost (take assumed value for it) electricity cost and plumbing cost of the following plan ?arrow_forward
- One way Floor and Roof Farming System.arrow_forwardYou have decided to construct a timber wall in your new home 8 feet wide x 10 feet long, using the standard 1-inch-thick boards. How many pieces of 1''x4''x10' boards will you need? If each board feet cost $8.58, what will be the total cost of the boards?arrow_forwardDefine Dynamic Replacement.arrow_forward
- Define eskers and how it is helpful for the construction purpose?arrow_forward14:32 Figure 1 below shows different drawings that appear on a building plan. Analyse the drawings and complete the table below. WRITE YOUR ANSWERS IN THE TABLE BELOW. NOTE: Contractors must verify all dimensions and levels on site before commencing work. Architects must be notified of any discrepancies immediately. Wall thickness: External - 220 mm Internal = 110 mm ARCHITECTS SIGNATURE CLIENTS SIGNATURE The following electrical installation should be installed in the kitchen: w The following symbol shows the type of brick finishing that will be used for the building FIGURE A SCALE 1: 100 REVISION DATE DESCRIPTION 2 600 3 400 PRINTED BY DLAMINI PRINTERS DATE OF PRINT 20190401 W2 W 1 DRAWING TITLE SITE PLAN STAND S02 PROJECT PROPOSED DWELLING ON STAND S02, DEO PARK BATHROOM KITCHEN DRAWING NR. 339P9 PROJECT NO. GR 228-201 DATE DRAWN CHECKED SCALE 1642019 P MBALI PCARTER L 100 REFERENCE COOE OP 2-2019 LOUNGE WINDOW 1 WINDOW 2 BEDROOM 2 000 900 W 1 FIGURE B SCALE 1: 100 Add a caption...…arrow_forwardGiven a partial wood wall stud that is to be covered with marine plywood and lumber to be used for its wall stud is 2" x 2" x 10' with a total length of 5.50 and a wall thickness of 0.075m. a. How many pieces of 2" x 2" x 10' lumber is required? (use interior area only) b. If per board foot is P40.00, what is the total cost for its construction? c. How many kilograms of 2%" Ro. CWN is needed? d. How many pieces of Marine Plywood is needed? 5.00m 6.50m 2.80marrow_forward
- Case study The contractor received a submittal package from the curtain wall subcontractor. Per the specifications, product data, shop drawings, finish samples, fabrication sample, product test reports, field test reports, and design analysis are required. The product data, shop drawings, and finish samples are specified as action submittals, the other submittals are specified to be informational submittals. The curtain wall shown on the drawings was a generic system and the specifications provided a list of three acceptable systems, which had slightly different methods of fabrication and attachment to the building structure. When the curtain wall installation is 10% complete, the specifications call for the contractor to perform water spray and air leakage tests. The results of these tests are to be submitted to the architect. The curtain wall manufacturer prepared the action submittals, the product test reports, and the design analysis and gave them to the subcontractor to submit.…arrow_forwardDetermine the number of modular bricks needed for the wall in Figure 12.26 below. The windows are 4 feet high by 4 feet wide and the door is 6 feet wide by 7 feet high. Assume that 675 bricks are required for 100 square feet of wall. Add 5 percent for waste. Write correct units. 48'-0" Find the net area of the wall and number of bricks: Blank #1: Gross wall area (sf) Blank #2: Areas of openings (sf) Blank #3: Net area of wall (s) Blank #4: Number of bricks- Add waste, and round off to a whole number Blank #5: Number of bricks 0-01arrow_forwardINSTRUCTIONS:- Estimate steel column manhours, material costs, and labor costs.- The benchmark data is given below.- The labor rate for all pieces of steel is $83/hrarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Architectural Drafting and Design (MindTap Course...Civil EngineeringISBN:9781285165738Author:Alan Jefferis, David A. Madsen, David P. MadsenPublisher:Cengage LearningResidential Construction Academy: House Wiring (M...Civil EngineeringISBN:9781285852225Author:Gregory W FletcherPublisher:Cengage LearningFundamentals Of Construction EstimatingCivil EngineeringISBN:9781337399395Author:Pratt, David J.Publisher:Cengage,
Architectural Drafting and Design (MindTap Course...
Civil Engineering
ISBN:9781285165738
Author:Alan Jefferis, David A. Madsen, David P. Madsen
Publisher:Cengage Learning
Residential Construction Academy: House Wiring (M...
Civil Engineering
ISBN:9781285852225
Author:Gregory W Fletcher
Publisher:Cengage Learning
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Cengage,