Chapter 7, Problem 7.13Q
To determine
The description of the process of estimation of the cost of a new home based on a cost per square foot.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
If the construction cost of a bungalow of size 34’6" (10.5 m) × 40'9" (12.4 m) was $120,790.00, what is the cost per square foot (square meter)?
The preliminary cost for a 51,000 ft2 aircraft hangar must be estimated.
The first unit estimate was $101 per square foot. Estimate the cost of the hangar.
The cost of the hangar is determined to be $ .
Describe the role of the owner, designer, and the contractor in the construction process?
Chapter 7 Solutions
Architectural Drafting and Design (MindTap Course List)
Ch. 7 - Prob. 7.1QCh. 7 - Prob. 7.2QCh. 7 - Prob. 7.3QCh. 7 - Prob. 7.4QCh. 7 - Prob. 7.5QCh. 7 - Prob. 7.6QCh. 7 - Prob. 7.7QCh. 7 - Prob. 7.8QCh. 7 - Prob. 7.9QCh. 7 - Prob. 7.10Q
Ch. 7 - Prob. 7.11QCh. 7 - Prob. 7.12QCh. 7 - Prob. 7.13QCh. 7 - Prob. 7.14QCh. 7 - Prob. 7.15QCh. 7 - Prob. 7.16QCh. 7 - Prob. 7.17QCh. 7 - Prob. 7.18QCh. 7 - Prob. 7.19QCh. 7 - Prob. 7.20QCh. 7 - Prob. 7.5PCh. 7 - Prob. 7.6PCh. 7 - Prob. 7.7PCh. 7 - Prob. 7.8PCh. 7 - Prob. 7.9PCh. 7 - Prob. 7.10PCh. 7 - Prob. 7.11PCh. 7 - Prob. 7.12PCh. 7 - Prob. 7.13PCh. 7 - Prob. 7.14PCh. 7 - Prob. 7.15P
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- Define in your own words the construction cost estimate and list and describe the different types of construction estimates.arrow_forwardWhat will be the rough cost estimate for a first- class building having a plinth area of 100 m², if the rate/m², if the rate/m² is Rs. 600 and necessary additions of 20% are to be made for public health worth?arrow_forwardHow does inflation affect construction cost estimates for concrete block projects?arrow_forward
- Providing as much detail as needed answer the following question and provide at least three references for ssupport How can a conventional approach to building be more expensive than the sustainable approach, focusing specifically on building operating costs that are the responsibility of the owners. Thank Youarrow_forwardWhat is premium Floor Space Index?arrow_forwardIf construction cost $95 per square foot how can I find the cost of building the home?arrow_forward
- You want a mountain cabin built for weekend trips, vacations, to host family, and perhaps eventually to retire in. After discussing the project with a local contractor, you receive an estimate that the total con- struction cost of your 2000-ft2 lodge will be $250,000. The percentage of costs is broken down as follows: Percentage of Cost Items Total Costs Construction permits, legal and 8 title fees Roadway, site clearing, preparation Foundation, concrete, masonry Wallboard, flooring, carpentry Heating, ventilation, air conditioning (HVAC) Electric, plumbing, communications Roofing, flooring Painting, finishing 15 13 12 13 10 12 17 100 (a) What is the cost per square foot of the 2000-ft2 lodge? (b) If you are also considering a 4000-ft² layout option, estimate your construction costs if: i. All cost items (in the table) change propor- tionately to the size increase. ii. The first two cost items do not change at all; HVAC changes by 50%; and all others are proportionate.arrow_forwardFor a project that will be staffed by a Resident Project Representative, two inspectors, and a field clerk, what is the minimum size recommended for the field office trailer?arrow_forwardI really don't get this and I would like to know how you solved it and what the answer is.arrow_forward
- What determines the number of draws a builder can make incompleting a facility? What is the existing policy regardingnumber of draws in your locality?arrow_forwardYou are a licensed Civil Engineer. Your brother prepared a drawing plan and structural design for one of his projects. However, since he is not yet a Licensed CE, he requested you for your approval and signature of the same, offering you a certain amount as payment. Will you give your approval/signature for the said plan and design? Why?arrow_forwardQsn. Discuss the materials required to construct the building using PET bottles as an construction unit .Please don't solve wrong , will dislikearrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Architectural Drafting and Design (MindTap Course...Civil EngineeringISBN:9781285165738Author:Alan Jefferis, David A. Madsen, David P. MadsenPublisher:Cengage LearningFundamentals Of Construction EstimatingCivil EngineeringISBN:9781337399395Author:Pratt, David J.Publisher:Cengage,
Architectural Drafting and Design (MindTap Course...
Civil Engineering
ISBN:9781285165738
Author:Alan Jefferis, David A. Madsen, David P. Madsen
Publisher:Cengage Learning
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Cengage,