Question
Chapter 7, Problem 7.13P
To determine
The estimated cost of carpet used in master bedroom.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Given a partial wood wall stud that is to be covered with marine plywood and lumber to be used for its wall stud is 2” x 2” x 10’ with a total length of 5.50 and a wall thickness of 0.075m.
a. How many pieces of 2” x 2” x 10’ lumber is required? (use interior area only)
b. If per board foot is ₱40.00, what is the total cost for its construction?
c. How many kilograms of 2½” Ro. CWN is needed?
d. How many pieces of Marine Plywood is needed?
please send a handwritten solution
One plumbing job requires 45 meters of PVC pipe, and a second job requires 30 meters. The pipe comes in 6-meter lengths only. How many sections should the plumber buy? How much pipe will be left over, assuming that there are no errors?
Chapter 7 Solutions
Architectural Drafting and Design (MindTap Course List)
Ch. 7 - Prob. 7.1QCh. 7 - Prob. 7.2QCh. 7 - Prob. 7.3QCh. 7 - Prob. 7.4QCh. 7 - Prob. 7.5QCh. 7 - Prob. 7.6QCh. 7 - Prob. 7.7QCh. 7 - Prob. 7.8QCh. 7 - Prob. 7.9QCh. 7 - Prob. 7.10Q
Ch. 7 - Prob. 7.11QCh. 7 - Prob. 7.12QCh. 7 - Prob. 7.13QCh. 7 - Prob. 7.14QCh. 7 - Prob. 7.15QCh. 7 - Prob. 7.16QCh. 7 - Prob. 7.17QCh. 7 - Prob. 7.18QCh. 7 - Prob. 7.19QCh. 7 - Prob. 7.20QCh. 7 - Prob. 7.5PCh. 7 - Prob. 7.6PCh. 7 - Prob. 7.7PCh. 7 - Prob. 7.8PCh. 7 - Prob. 7.9PCh. 7 - Prob. 7.10PCh. 7 - Prob. 7.11PCh. 7 - Prob. 7.12PCh. 7 - Prob. 7.13PCh. 7 - Prob. 7.14PCh. 7 - Prob. 7.15P
Knowledge Booster
Similar questions
- Find the question, thanx.arrow_forwardA structure with dimensions of 300x100m has been constructed. There are three machines inside, measuring 20 x 15 by 1.5. How many employees are permitted/allowed?arrow_forwardDetermine the number of board foot of wood having the following dimension and number of stocks: (a) 40 pcs - 2 in. x 4 in. x 10 ft; (b) 120 pcs - 1 in. x 2 in. x 12 ft; (c) 500 pcs - 2 in. x 2 in x 8 ft; and (d) 20 pcs - 1 in. x 1 ft x 10 ft. Also compute the total cost of the stocks of wood if the cost per board foot is P30.00.arrow_forward
- Determine the number of modular bricks needed for the wall in Figure 12.26 below. The windows are 4 feet high by 4 feet wide and the door is 6 feet wide by 7 feet high. Assume that 675 bricks are required for 100 square feet of wall. Add 5 percent for waste. Write correct units. 48'-0" Find the net area of the wall and number of bricks: Blank #1: Gross wall area (sf) Blank #2: Areas of openings (sf) Blank #3: Net area of wall (s) Blank #4: Number of bricks- Add waste, and round off to a whole number Blank #5: Number of bricks 0-01arrow_forwardA flooring subcontractor must install three types of flooring in an existing building. The subcontractor is given 10 days to finish all the work. Assume he has crews to start all three jobs concurrently. Four days after the start of the work, he discovers the following: Type Quantity Unit Total Installed Actual Cost 2. (m) Price Price (m) Carpet 2600 2.30 5980 1600 3150 Vinyl tile 1200 2.95 3540 800 2488 Ceramic 3330 4.95 16484 750 3638 tile Total 7130 26004 What is the Schedule Performance Index (SPI) value for Ceramic tilearrow_forwardMy database for Formworks and Falseworks Unit cost is Php 1, 040 per sq. m. If I am to Construct 4 columns with height of 2.5 meters per column and Cross section of 0.3m x 0.4m, How much should my budget be for my formworks and falsework- based on the Unit cost?arrow_forward
- Qsn. Discuss the materials required to construct the building using PET bottles as an construction unit .Please don't solve wrong , will dislikearrow_forwardDetermine the boq of the following plan, also determine the total number of bricks, plaster and paint cost of the following plan , also determine the labour hours, productivity rate ,fuel adjustment cost (take assumed value for it) electricity cost and plumbing cost of the following plan ?arrow_forwardGiven a partial wood wall stud that is to be covered with marine plywood and lumber to be used for its wall stud is 2" x 2" x 10' with a total length of 5.50 and a wall thickness of 0.075m. a. How many pieces of 2" x 2" x 10' lumber is required? (use interior area only) b. If per board foot is P40.00, what is the total cost for its construction? c. How many kilograms of 2%" Ro. CWN is needed? d. How many pieces of Marine Plywood is needed? 5.00m 6.50m 2.80marrow_forward
- The partition wall shown below is to be constructed of8 × 16 × 6 block. Estimate the cost of the wall to includelabor, materials, and contractor O & P using the R. S. Meansbuilding cost data or other appropriate estimating reference.The job is located in Cincinnati, Ohio.arrow_forwardA heating supply store buys 6-inch metal flue pipe at $2.90 per 24-inchsection. The pipe is marked up 40%. What is the selling price of one section?arrow_forwardDetermine the number of modular bricks necessary for the front wall if the house shown in the figure. Add 4% for waste. Determine the cost to lay the brick. It takes a mason 6 labor hours and a laborer 8.5 labor hours to construct 100 square feet of brick. The average hourly wage for a mason ·30⁰ $42.33 and for a laborer is $21.03. -61-8⁰ ||3¹ Elevation ·16' 24' +4'.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Architectural Drafting and Design (MindTap Course...Civil EngineeringISBN:9781285165738Author:Alan Jefferis, David A. Madsen, David P. MadsenPublisher:Cengage LearningFundamentals Of Construction EstimatingCivil EngineeringISBN:9781337399395Author:Pratt, David J.Publisher:Cengage,Residential Construction Academy: House Wiring (M...Civil EngineeringISBN:9781285852225Author:Gregory W FletcherPublisher:Cengage Learning
Architectural Drafting and Design (MindTap Course...
Civil Engineering
ISBN:9781285165738
Author:Alan Jefferis, David A. Madsen, David P. Madsen
Publisher:Cengage Learning
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Cengage,
Residential Construction Academy: House Wiring (M...
Civil Engineering
ISBN:9781285852225
Author:Gregory W Fletcher
Publisher:Cengage Learning