Question
Chapter 7, Problem 7.15P
To determine
The estimated cost of the given slab.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Hi! can you please help me with this? I'm stuck because we need to provide explanation and I don't know how to explain. Thank you in advance!
Q: How much concrete do you need to fill 1800 sq. ft. of space?
If it takes 5 days to complete 2,000 S.F. of 8" x8" *16" concrete
masonry units (CMUS) at a total labor cost of $8,220, how long does it
take to install 2,400 S.F.?
O 5 days
O 6 days
O 4 days
O 3 days
My database for Formworks and Falseworks Unit cost is Php 1, 040 per sq.
m. If I am to Construct 4 columns with height of 2.5 meters per column
and Cross section of 0.3m x 0.4m, How much should my budget be for my
formworks and falsework- based on the Unit cost?
Chapter 7 Solutions
Architectural Drafting and Design (MindTap Course List)
Ch. 7 - Prob. 7.1QCh. 7 - Prob. 7.2QCh. 7 - Prob. 7.3QCh. 7 - Prob. 7.4QCh. 7 - Prob. 7.5QCh. 7 - Prob. 7.6QCh. 7 - Prob. 7.7QCh. 7 - Prob. 7.8QCh. 7 - Prob. 7.9QCh. 7 - Prob. 7.10Q
Ch. 7 - Prob. 7.11QCh. 7 - Prob. 7.12QCh. 7 - Prob. 7.13QCh. 7 - Prob. 7.14QCh. 7 - Prob. 7.15QCh. 7 - Prob. 7.16QCh. 7 - Prob. 7.17QCh. 7 - Prob. 7.18QCh. 7 - Prob. 7.19QCh. 7 - Prob. 7.20QCh. 7 - Prob. 7.5PCh. 7 - Prob. 7.6PCh. 7 - Prob. 7.7PCh. 7 - Prob. 7.8PCh. 7 - Prob. 7.9PCh. 7 - Prob. 7.10PCh. 7 - Prob. 7.11PCh. 7 - Prob. 7.12PCh. 7 - Prob. 7.13PCh. 7 - Prob. 7.14PCh. 7 - Prob. 7.15P
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- Determine the minimum area of shrinkage bars (mm2) for a slab having thickness of 150 mm. Round of your answer to a whole number, no need to write down the unit.arrow_forwardDiscuss the component costs ( including the unit of measurment ) of cast in situ concrete based on a construction of a slab. Design a bills of quantity for a cast in situ concrete slab of a house roof.arrow_forwardYou are the Field Engineer and Cost Engineer for a residential project that you are managing. In three (3) days, your endeavor will begin Masonry Works. In accordance with this, you must calculate (ahead of time) the total number of CHB sections required for the road-facing exterior walls. To ensure you have sufficient materials, you added an allowance for eight percent (8%) breakage. Determine the quantity of CHB to be ordered. Round your answer to the nearest integer.Student Number is the Total Contract Price (TCP) of the Undertaking. If the project's operating expenses are 35% of the total budget, how much will be left if the price of CHB is 13 pesos and 16 pesos, respectively? use 123456 as the TCP. Below are specifics: NEED ASAP 30 MINSarrow_forward
- Estimate the total amount of cost for concrete works (class “B”) based from the following given: 10-pcs of F1 (1.2m x 1.2m x 0.3 m) 10-pcs of C1 (0.3 m x 0.3 m x 4.1 m) Floor area of 100mm thk slab-on-grade = 53 sq.m The cost of cement (40kg per bag) = 210 per bag. The cost of sand is 710 per cubic meter. The cost of gravel is 1900 per cubic meter.arrow_forwardCalculate total cost per cubic yard of concrete, given the following: Concrete materials and batching costs = $70/cy Trucking = $6.00/cy Paving equipment = $340.00/hr - Paving labor = $500.00/hr Paver production = 120 cy/hr Incidentals $4.00/cy Overhead and profit = 20% of direct costs 1.87.0 = O2.106.8 O 3.104.4 4.99.6arrow_forwardCalculate the cost per cubic yard to place concrete using each of the alternatives described. The work in both cases consists of placing 140 cubic yards of concrete in footings. a. Using a crane and bucket at a price of $225 per hour, including an operator, with a crew consisting of 6 laborers, a cement finisher, and a foreman. The concrete will be placed in 7 hours using this setup, and transportation of the crane costs $390. b. Using a concrete pump at a price of $295 per hour, including an operator and a crew consisting of 5 laborers, a cement finisher, and a foreman. With this setup, concrete is placed in 6 hours and transportation of the pump costs $290.arrow_forward
- How many cubic yards of concrete are required to construct 31 each 18-inch-diameter, 8-foot-high concrete columns? Include 5% waste. Concrete must be ordered in 1/4 cubic-yard increments.arrow_forwardThe average hourly labor cost for a construction masonry crew consisting of one foreman, six masons, and nine helpers is $35/workhour, and the net productivity is 0.025 workhours per brick. Brick dimensions are 2-5/8" X 8" X 3-1/2". This crew is building a masonry wall whose net area is 25,000 square feet. This crew works 6 hours per day. 1. What is the labor cost for this wall? 2. What is the daily consumption of bricks? (assume no waste).arrow_forwardSHOW COMPLETE SOLUTIONS AND DRAWINGS: A column with a section of 0.30m x 0.35m is to be filled up class AA reinforced concrete. It is 3.00m in height How many cement bags do you need to fill it up? If you will have a total of 10 columns, how many cubic meters of sand and gravel will you need? Compute for the Total Cost needed for the 10 columns if 1 cement bag is Php 275 pesos, and 1 cubic meter of Sand is sold at Php 1850.00, and 1 cubic meter of Gravel is sold at Php 1950.00. Take note: The Class AA type of concrete mix has 12 bags of cement per cubic meter. To get the volume of the following: Volume of sand= volume of column x 0.50 Volume of Gravel= volume of column x 1.00arrow_forward
- QUESTION 19 If there is a concrete slab that is 965' long by 865' wide and 1' 11" thick, how many cubic yards of concrete are needed to pour it? Please round up to nearest whole number.arrow_forwardGiven a partial wood wall stud that is to be covered with marine plywood and lumber to be used for its wall stud is 2” x 2” x 10’ with a total length of 5.50 and a wall thickness of 0.075m. a. How many pieces of 2” x 2” x 10’ lumber is required? (use interior area only) b. If per board foot is ₱40.00, what is the total cost for its construction? c. How many kilograms of 2½” Ro. CWN is needed? d. How many pieces of Marine Plywood is needed?arrow_forwardWhat are the several uses of a tirfor machine?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Architectural Drafting and Design (MindTap Course...Civil EngineeringISBN:9781285165738Author:Alan Jefferis, David A. Madsen, David P. MadsenPublisher:Cengage LearningFundamentals Of Construction EstimatingCivil EngineeringISBN:9781337399395Author:Pratt, David J.Publisher:Cengage,Construction Materials, Methods and Techniques (M...Civil EngineeringISBN:9781305086272Author:William P. Spence, Eva KultermannPublisher:Cengage Learning
Architectural Drafting and Design (MindTap Course...
Civil Engineering
ISBN:9781285165738
Author:Alan Jefferis, David A. Madsen, David P. Madsen
Publisher:Cengage Learning
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Cengage,
Construction Materials, Methods and Techniques (M...
Civil Engineering
ISBN:9781305086272
Author:William P. Spence, Eva Kultermann
Publisher:Cengage Learning
Pricing Concrete Jobs - 24' X 24' Concrete Floor (Prep, Pour, Finish); Author: Mike Day Concrete;https://www.youtube.com/watch?v=V-fgI1Hiu9w;License: Standard Youtube License