What is pricing concrete work?
The concrete work in a project usually holds a high-end cost in terms of cost and value of the work. It becomes an important step in calculating the cost associated with concrete while preparing the project scale. The cost of making concrete depends on the cost of building materials, mixed materials, labor, and machinery. A concrete contractor builds structures from concrete, usually managing all the steps of the process from assembling ingredients to building a holding structure and preparing the mixture. This person or team oversees the delivery and unloading of goods to ensure that they are done properly. Nowadays, most of the concrete in the United States comes from manufacturers working abroad, usually with branches and plants within the provinces. Contributions can range from pre-mixed concrete to basic ingredients, the consumer company then mixes it. Many American-based concrete companies, however, offer concrete products, such as ballads, bricks, countertop, concrete pipe, and building products, as well as concrete construction and installation materials. This article covers both types of suppliers for this set of building materials.
Concrete cost per yard
According to the National Ready Mixed Concrete Association (NRMCA), the average cost of concrete is $108 per cubic yard. By delivering concrete and pouring, most pay $119 to $147 per cubic yard depending on pounds per square inch of cement. A full 10-yard truckload and the delivery average cost $1,169 to $1,444, enough to fill a road. Getting less than a full truck (short load) or weekend delivery will add to the final cost. If the workplace is more than 20 miles from the merger area then one must expect to pay another $9.50 per mile.
Concrete slab cost
A new concrete slab costs $4 to $8 per square foot and most homeowners spend between $5.35 to $6.17 per square foot or $113 to $126 per cubic yard for both building and installation materials. The final cost will depend on the size of the concrete slabs, the thickness, and whether there are special reinforcements such as wire mesh or rebar. The labor to pour concrete slab cost is $45 per hour. There may also be a delivery fee of $60. For concrete pouring and finishing, it costs $2.52 to $2.60 per square foot for work, and $2.83 to $3.57 per square foot for concrete itself. Concrete slabs are poured outside or in the workplace. One cubic yard of concrete equals 2.03 tons (shorter) costing an average cost of $50 to $75 per ton.
Preparation before pouring the concrete slab
Grading
The base of the concrete slab or floor is essential for an effective non-cracking slab. Grading usually costs $60 per hour for a tractor and operator. Grading is necessary to ensure that water comes out of one's house and does not accumulate under the concrete slab, which can cause major cracks. For large-scale projects, such as opening a house for construction, it costs between $1,150 and $3,680.
Sub-base
For proper installation, the foundation or subgrade of the stone and sand brought needs to be laid and covered at $10 to $20 per cubic yard. The sub-base reduces the chances of change, leading to less fragmentation. The foundation must be stable for the concrete to work properly.
Average cost to pour the concrete slab
Cost to pour concrete patio slab
A concrete slab for a patio is usually 4” thick and costs $5.53 – $10.25 per square foot to install. For a typical strike on the balcony costs from $796 to $1,476. One must always tighten 4” thick slabs with rebar for strength. The final cost may be affected by many design items.
Concrete driveway slab cost
The basic concrete slab costs $4 to $8 per square foot for concrete driveway, with highly advanced designs, patterns, and colors ranging from $8 to $18 per square foot.
Concrete delivery cost
Short-load concrete cost
Commonly used by concrete contractors living on small to medium projects where concrete is mixed on-site. Dry concrete usually enters the load of a single truck. Each cubic concrete yard costs $119 to $147 per cubic yard. A full concrete truck usually holds 10 cubic yards, while trucks full of half or "short loads" cost $53 per cubic yard more, or about $172 per yard. Some concrete contractors will provide short-term load services for small or residential projects by delivering concrete between 1 and 11 yards per trip. The concrete is then mixed with the site using an independent mix of concrete company staff for a service fee of approximately $60 to $110 or more. At that time, the concrete contractors are responsible for pouring the concrete.
Ready-mix concrete cost
Concrete is mixed before being brought to the mixer and is often used by concrete contractors for major construction projects such as concrete driveways and garage slabs. Ready-mixed concrete is pre-mixed with clusters of 10 cubic yards or more and includes delivery of up to 20 miles for $119 to $147 per cubic yard. The level of ready-mixed concrete is much higher than the delivery of short load because the concrete is well prepared in the mixing area.
Stamped concrete cost
Stamped concrete finishes such as stainless steel or the cost of sealed concrete range from $2 to $18 per square foot to be installed depending on the complexity of the design. Sealed concrete varies from a smooth polish to geometric patterns to something like stone, brick, or tile. Stamped concrete is cheaper, and one color is applied typically with a protective sealant. Advanced color schemes projects include multi-colors and border designs.
Precast concrete cost
Precast concrete slab costs vary from $375 to $1,300 per cubic yard. The simpler the building, the lower the cost per cubic yard. A prefabricated concrete slab will range from $450 to $750 per cubic yard. This is a comprehensive list of costs because there is a wide range of options and features that affect the total cost. Considering the difference between a 6” thick panel compared to a 12” thick panel, a person has many similar operating costs associated with setting up a simulation bed of both thicknesses. The person may have more metal reinforcement and apparently, he/she will have twice the amount of concrete material, but the total operating costs are spread over twice the cubic yardage equal to the minimum cost per cubic yard per larger panel. As you move through the completion of real buildings, the cost per cubic yard can increase by more than $750 per cubic yard depending on how special the finished concrete slab product is expected to be.
Context and Applications
This topic is important for professional exams in both undergraduate and graduate studies and in particular:
- Bachelors in Civil Engineering
- Masters in Civil Engineering
Practice Problems
1. Cement concrete tends to be-
- Porous
- Hardscape
- Wire mesh
- Countertop shine
Answer: Option a
Explanation: Due to the presence of voids in cement, concrete is porous.
2. Road cement concrete slab is of standard-
- M10
- M15
- M20
- M25
Answer: Option b
Explanation: The concrete used for cement concrete slab road is of M15 using 20 mm non-hand-applied grade metal.
3. The amount of concrete in cement concrete slab is measured by multiplying the floor area by-
- Flatwork
- Free estimates
- Thickness
- Average cost
Answer: c
Explanation: The amount of concrete in cement concrete slab is measured by multiplying the floor area by thickness.
4. The strength and workability of a well-mixed concrete depends on-
- Concrete contractor
- Concrete patio
- Flatwork
- Water-cement ratio
Answer: Option d
Explanation: The strength and workability of a well-mixed concrete slab depend only on the water-cement ratio. The higher water-cement ratio increases workability.
5. Which concrete refers to the minimum amount of cement than liquid in a concrete slab?
- Lean mix concrete
- Stamped concrete
- Precast concrete
- Ordinary concrete
Answer: Option a
Explanation: Lean mix concrete refers to the minimum amount of cement and liquid in concrete. While this may not make for a good driveway, it makes an excellent foundation layer for other types of concrete to pass through. It helps to distinguish the wrong place.
Want more help with your civil engineering homework?
*Response times may vary by subject and question complexity. Median response time is 34 minutes for paid subscribers and may be longer for promotional offers.
Search. Solve. Succeed!
Study smarter access to millions of step-by step textbook solutions, our Q&A library, and AI powered Math Solver. Plus, you get 30 questions to ask an expert each month.
Pricing Concrete Work Homework Questions from Fellow Students
Browse our recently answered Pricing Concrete Work homework questions.
Search. Solve. Succeed!
Study smarter access to millions of step-by step textbook solutions, our Q&A library, and AI powered Math Solver. Plus, you get 30 questions to ask an expert each month.