Your client has hired you to assess the financial feasibility of developing a commercially- zoned parcel of land into an office building. Specifics about the property include: • The total area of the subject property is 2.9 acres. • • • • • • The zoning ordinance for the local county specifies a maximum FAR = 0.4 for this parcel of land. Hint: Use this to determine the maximum building area (SF) that the site can accommodate. The average commercial retail rent in this area is $38 per building square foot. Sanitary sewer and water service is not presently available to the parcel. Costs to extend public utility lines to the parcel are estimated as follows: о Sanitary sewer extension: $27,000 о Waterline extension: $42,500 In order to accommodate new traffic that the development will generate, a new turn lane is required. The cost to construct the turn lane is estimated to be $90,000. Site development costs (grading, curb & gutter, etc.) are estimated to be $200,000 per acre. The cost of constructing the commercial building is estimated to be $200 per building square foot. • Architecture fees are estimated to be $5 per building square foot. • Engineering fees are estimated to be $2 per square foot of site area. • Building Plan Review fees are expected to be $2,500. Permitting Fees are expected to be $1.50 per square foot of site area. • Site Plan Review Fees are calculated as $2000 plus $100 per acre. • Your client walks away from deals that generate an annual yield of less than 9.0%.

Architectural Drafting and Design (MindTap Course List)
7th Edition
ISBN:9781285165738
Author:Alan Jefferis, David A. Madsen, David P. Madsen
Publisher:Alan Jefferis, David A. Madsen, David P. Madsen
Chapter14: Legal Descriptions And Site Plan Requirements
Section: Chapter Questions
Problem 14.10P
icon
Related questions
Question

answer on paper and make sure work is done step by step correctly and neatly

Your client has hired you to assess the financial feasibility of developing a commercially-
zoned parcel of land into an office building. Specifics about the property include:
• The total area of the subject property is 2.9 acres.
•
•
•
•
•
•
The zoning ordinance for the local county specifies a maximum FAR = 0.4 for this
parcel of land. Hint: Use this to determine the maximum building area (SF) that the site
can accommodate.
The average commercial retail rent in this area is $38 per building square foot.
Sanitary sewer and water service is not presently available to the parcel. Costs to
extend public utility lines to the parcel are estimated as follows:
о Sanitary sewer extension: $27,000
о
Waterline extension: $42,500
In order to accommodate new traffic that the development will generate, a new turn
lane is required. The cost to construct the turn lane is estimated to be $90,000.
Site development costs (grading, curb & gutter, etc.) are estimated to be $200,000 per
acre.
The cost of constructing the commercial building is estimated to be $200 per building
square foot.
• Architecture fees are estimated to be $5 per building square foot.
• Engineering fees are estimated to be $2 per square foot of site area.
• Building Plan Review fees are expected to be $2,500.
Permitting Fees are expected to be $1.50 per square foot of site area.
• Site Plan Review Fees are calculated as $2000 plus $100 per acre.
•
Your client walks away from deals that generate an annual yield of less than 9.0%.
Transcribed Image Text:Your client has hired you to assess the financial feasibility of developing a commercially- zoned parcel of land into an office building. Specifics about the property include: • The total area of the subject property is 2.9 acres. • • • • • • The zoning ordinance for the local county specifies a maximum FAR = 0.4 for this parcel of land. Hint: Use this to determine the maximum building area (SF) that the site can accommodate. The average commercial retail rent in this area is $38 per building square foot. Sanitary sewer and water service is not presently available to the parcel. Costs to extend public utility lines to the parcel are estimated as follows: о Sanitary sewer extension: $27,000 о Waterline extension: $42,500 In order to accommodate new traffic that the development will generate, a new turn lane is required. The cost to construct the turn lane is estimated to be $90,000. Site development costs (grading, curb & gutter, etc.) are estimated to be $200,000 per acre. The cost of constructing the commercial building is estimated to be $200 per building square foot. • Architecture fees are estimated to be $5 per building square foot. • Engineering fees are estimated to be $2 per square foot of site area. • Building Plan Review fees are expected to be $2,500. Permitting Fees are expected to be $1.50 per square foot of site area. • Site Plan Review Fees are calculated as $2000 plus $100 per acre. • Your client walks away from deals that generate an annual yield of less than 9.0%.
Expert Solution
steps

Step by step

Solved in 2 steps

Blurred answer
Recommended textbooks for you
Architectural Drafting and Design (MindTap Course…
Architectural Drafting and Design (MindTap Course…
Civil Engineering
ISBN:
9781285165738
Author:
Alan Jefferis, David A. Madsen, David P. Madsen
Publisher:
Cengage Learning
Construction Materials, Methods and Techniques (M…
Construction Materials, Methods and Techniques (M…
Civil Engineering
ISBN:
9781305086272
Author:
William P. Spence, Eva Kultermann
Publisher:
Cengage Learning
Fundamentals Of Construction Estimating
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:
9781337399395
Author:
Pratt, David J.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning
Residential Construction Academy: House Wiring (M…
Residential Construction Academy: House Wiring (M…
Civil Engineering
ISBN:
9781285852225
Author:
Gregory W Fletcher
Publisher:
Cengage Learning