Architectural Drafting and Design (MindTap Course List)
7th Edition
ISBN: 9781285165738
Author: Alan Jefferis, David A. Madsen, David P. Madsen
Publisher: Cengage Learning
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 7, Problem 7.16Q
To determine
(a)
The definition of material pattern and the description of its effect on ordering flooring material.
To determine
(b)
The definition of pattern repeats and the description of its effect on ordering flooring material.
To determine
(c)
The definition of pattern seam and the description of its effect on ordering flooring material.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
create a sample company name for a “plywood made with papers”??
Fill up tabele#1 below to calculate exact quantity of each given item as given in figuret 1 & #2 below.
Hints
o Lintels cross-section over Door and Window (h-0.4 x b-0.25) m
O Excessive length @ each end side of a lintel = 0.25m
o Door dimension DI (2.3x1.2) m. Frame thickness of the Door= 0.06m
• Window dimension W1 (1.5x1.6) m. Frame thickness of the window- 0.06m
O Redraw the Tablet#1 below, the results must be added in the Table.
12
cn
0.5m-
35cm
6.5m
RC Beam
under s
RC Sa
5m
4.3m
3.1m25omm
w Concete ch
Figure 1
OPCC
0,55m
0.25m
Tiles with Mortar 50mm
CC10cm
Item deseription
Unit
Quantity
Ser.
Earthwork (Excavation)
m
Soie Concrete Biock
Plain Concrete Casting
m
2
0.35m
Piain Concrete Casing
Solid Concrete Block
3
600mm
Damp Proof Course Concrete (DPCC)
4
Figure 2
Hollow Concrete Block
m'
RC Beam under Slab
m'
6
RC Slab
m
7
Tabled 1Quantities
見|司|見
Describe ICF forms and how they are used.
Chapter 7 Solutions
Architectural Drafting and Design (MindTap Course List)
Ch. 7 - Prob. 7.1QCh. 7 - Prob. 7.2QCh. 7 - Prob. 7.3QCh. 7 - Prob. 7.4QCh. 7 - Prob. 7.5QCh. 7 - Prob. 7.6QCh. 7 - Prob. 7.7QCh. 7 - Prob. 7.8QCh. 7 - Prob. 7.9QCh. 7 - Prob. 7.10Q
Ch. 7 - Prob. 7.11QCh. 7 - Prob. 7.12QCh. 7 - Prob. 7.13QCh. 7 - Prob. 7.14QCh. 7 - Prob. 7.15QCh. 7 - Prob. 7.16QCh. 7 - Prob. 7.17QCh. 7 - Prob. 7.18QCh. 7 - Prob. 7.19QCh. 7 - Prob. 7.20QCh. 7 - Prob. 7.5PCh. 7 - Prob. 7.6PCh. 7 - Prob. 7.7PCh. 7 - Prob. 7.8PCh. 7 - Prob. 7.9PCh. 7 - Prob. 7.10PCh. 7 - Prob. 7.11PCh. 7 - Prob. 7.12PCh. 7 - Prob. 7.13PCh. 7 - Prob. 7.14PCh. 7 - Prob. 7.15P
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- please put it on the paper for better understanding. thanksarrow_forwardA contractor is to place tiles for a living room with a floor area of 8 meters x 6 meters. If each tile has a dimension of 400mm x 400mm, how many tiles are needed?arrow_forwardList 15 types of construction materialsarrow_forward
- Q2/ Answer the followings with drawing sketch: A/ briefly explain what is construction joint and mention the location of construction joint in beam, column, and slab? 12 B/ Mention the steps of building construction and explain them briefly.arrow_forwardHow are the following items measured in a finish carpentry takeoff? a. Stairs b. Shelves c. Cedar paneling d. Custom cabinets e. Countertopsarrow_forwardTask 8- high rise building steps on how to build a high rise buildings. ( from rawland)arrow_forward
- Case study The contractor received a submittal package from the curtain wall subcontractor. Per the specifications, product data, shop drawings, finish samples, fabrication sample, product test reports, field test reports, and design analysis are required. The product data, shop drawings, and finish samples are specified as action submittals, the other submittals are specified to be informational submittals. The curtain wall shown on the drawings was a generic system and the specifications provided a list of three acceptable systems, which had slightly different methods of fabrication and attachment to the building structure. When the curtain wall installation is 10% complete, the specifications call for the contractor to perform water spray and air leakage tests. The results of these tests are to be submitted to the architect. The curtain wall manufacturer prepared the action submittals, the product test reports, and the design analysis and gave them to the subcontractor to submit.…arrow_forwardGive two classifications of building according to mass classification (mass content).arrow_forwardIdeal standards help assure quality ,safety and consistency of a product or element clearly stating requirements,preparation work,testing or verification requirement,or guidance for execution? true or false??arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Architectural Drafting and Design (MindTap Course...Civil EngineeringISBN:9781285165738Author:Alan Jefferis, David A. Madsen, David P. MadsenPublisher:Cengage LearningFundamentals Of Construction EstimatingCivil EngineeringISBN:9781337399395Author:Pratt, David J.Publisher:Cengage,Engineering Fundamentals: An Introduction to Engi...Civil EngineeringISBN:9781305084766Author:Saeed MoaveniPublisher:Cengage Learning
Architectural Drafting and Design (MindTap Course...
Civil Engineering
ISBN:9781285165738
Author:Alan Jefferis, David A. Madsen, David P. Madsen
Publisher:Cengage Learning
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Cengage,
Engineering Fundamentals: An Introduction to Engi...
Civil Engineering
ISBN:9781305084766
Author:Saeed Moaveni
Publisher:Cengage Learning