300,00.00 N POINT 4 _N=5,535.000 E=5,000.00 CP-101 N 4 CONTROL POINT N=5,487.752 452.85' S 01°08'07" W E=5,190.855 ELEV.=127.13 N=5138.589 E=5385.590 SWC BLDG TERNAL NTS 140.00 S 89°57'46" E 90°00'00" 160.00' POINT 3 N=5,534.425 E=5,884.810 90°00'00" 200.00' 113.31' COR COR .6 200.00' COR .5 300.00' COR .4 PROPOSED 1 STORY BUILDING FOUNDATION COR .3 FINISHED FLOOR ELEV.=132.00 COR .2 400.00' 99.64' POINT 1 N=5,000.000 E=5,000.000 CP 102 A CONTROL POINT N=5,034.995 E=5.181.884 NOTE: ALL PROPOSED BUILDING CORNERS HAVE 90* ANGLES. S 89°57'46" E NORTH 299.69' 157.39' 90°00'00" POINT A POINT B POINT 2 _N=4,999.425 E=5,884.810

Engineering Fundamentals: An Introduction to Engineering (MindTap Course List)
5th Edition
ISBN:9781305084766
Author:Saeed Moaveni
Publisher:Saeed Moaveni
Chapter7: Length And Length-related Variables In Engineering
Section: Chapter Questions
Problem 42P
icon
Related questions
Question

WHAT ARE THE COORDINATES (N,E) AT POINT A AND POINT B IN THE SKETCH (ATTACHED)

300,00.00 N
POINT 4
_N=5,535.000
E=5,000.00
CP-101
N
4 CONTROL POINT
N=5,487.752
452.85'
S 01°08'07" W
E=5,190.855
ELEV.=127.13
N=5138.589
E=5385.590
SWC BLDG
TERNAL
NTS
140.00
S 89°57'46" E
90°00'00"
160.00'
POINT 3
N=5,534.425
E=5,884.810
90°00'00"
200.00'
113.31'
COR
COR
.6
200.00'
COR
.5
300.00'
COR
.4
PROPOSED 1 STORY
BUILDING FOUNDATION
COR
.3
FINISHED FLOOR
ELEV.=132.00
COR
.2
400.00'
99.64'
POINT 1
N=5,000.000
E=5,000.000
CP 102
A CONTROL POINT
N=5,034.995
E=5.181.884
NOTE: ALL PROPOSED BUILDING CORNERS HAVE 90*
ANGLES.
S 89°57'46" E
NORTH
299.69'
157.39'
90°00'00"
POINT A
POINT B
POINT 2
_N=4,999.425
E=5,884.810
Transcribed Image Text:300,00.00 N POINT 4 _N=5,535.000 E=5,000.00 CP-101 N 4 CONTROL POINT N=5,487.752 452.85' S 01°08'07" W E=5,190.855 ELEV.=127.13 N=5138.589 E=5385.590 SWC BLDG TERNAL NTS 140.00 S 89°57'46" E 90°00'00" 160.00' POINT 3 N=5,534.425 E=5,884.810 90°00'00" 200.00' 113.31' COR COR .6 200.00' COR .5 300.00' COR .4 PROPOSED 1 STORY BUILDING FOUNDATION COR .3 FINISHED FLOOR ELEV.=132.00 COR .2 400.00' 99.64' POINT 1 N=5,000.000 E=5,000.000 CP 102 A CONTROL POINT N=5,034.995 E=5.181.884 NOTE: ALL PROPOSED BUILDING CORNERS HAVE 90* ANGLES. S 89°57'46" E NORTH 299.69' 157.39' 90°00'00" POINT A POINT B POINT 2 _N=4,999.425 E=5,884.810
Expert Solution
steps

Step by step

Solved in 2 steps with 1 images

Blurred answer
Recommended textbooks for you
Engineering Fundamentals: An Introduction to Engi…
Engineering Fundamentals: An Introduction to Engi…
Civil Engineering
ISBN:
9781305084766
Author:
Saeed Moaveni
Publisher:
Cengage Learning
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning
Architectural Drafting and Design (MindTap Course…
Architectural Drafting and Design (MindTap Course…
Civil Engineering
ISBN:
9781285165738
Author:
Alan Jefferis, David A. Madsen, David P. Madsen
Publisher:
Cengage Learning
Residential Construction Academy: House Wiring (M…
Residential Construction Academy: House Wiring (M…
Civil Engineering
ISBN:
9781285852225
Author:
Gregory W Fletcher
Publisher:
Cengage Learning
Construction Materials, Methods and Techniques (M…
Construction Materials, Methods and Techniques (M…
Civil Engineering
ISBN:
9781305086272
Author:
William P. Spence, Eva Kultermann
Publisher:
Cengage Learning
Residential Construction Academy: House Wiring (M…
Residential Construction Academy: House Wiring (M…
Civil Engineering
ISBN:
9781337402415
Author:
Gregory W Fletcher
Publisher:
Cengage Learning