
(a)
Whether a

Answer to Problem 5.5.14P
Inadequate
Explanation of Solution
Given:
Formula used:
Lpis unbraced length in an inelastic behavior
Lris unbraced length in an elastic behavior
Mn is nominal moment strength
Mpis plastic moment capacity
Calculation:
All channel shapes in the Manual are compact.(There are no footnotes to indicate otherwise)
For an
A is Cross-sectional area
Sxis Elastic section modulus about X -axis
Zxis Plastic section modulus about X -axis
Iyis Moment of inertia about Y -axis
ryis Radius of gyration about Y -axis
Syis Elastic section modulus about Y -axis
Cwis Warping constant
h0is Distance between centroid of flanges
J is Torsional moment of inertia
For channels,
For
From the below given figure in the textbook,
Conclusion:
(b)
Whether a

Answer to Problem 5.5.14P
Inadequate
Explanation of Solution
Given:
Formula used:
Mn is nominal moment strength
Mpis plastic moment capacity
Calculation:
All channel shapes in the Manual are compact. (There are no footnotes to indicate otherwise)
For an
A is Cross-sectional area
Sxis Elastic section modulus about X -axis
Zxis Plastic section modulus about X -axis
Iyis Moment of inertia about Y -axis
ryis Radius of gyration about Y -axis
Syis Elastic section modulus about Y -axis
Cwis Warping constant
h0is Distance between centroid of flanges
J is Torsional moment of inertia
For channels,
For
From the below given figure in the textbook,
Conclusion:
Want to see more full solutions like this?
Chapter 5 Solutions
Steel Design (Activate Learning with these NEW titles from Engineering!)
- A1.4- Determine the factored moment resistance for the flanged beam (simply supported) shown in Figure 4. Given: Beam span L = 8m fc = 25MPa fy=400MPa As = 3-35M *350* mm 1.5 m Figure 4 *350* mm -60mmarrow_forwardA2.3- a simply supported reinforced concrete beam of rectangular cross-section is shown in Figure 3. The beam supports a uniform dead load of 20 kN/m (excluding the beam self-weight) and a uniform live load of 20 kN/m. The beam width is restricted to 400 mm. The maximum aggregate size is 20 mm. We are using 10M bars for stirrups and 25M bars for tension steel. Concrete is type N with f'c = 35 MPa and fy = 400 MPa. The beam needs to have 2hr fire rating. Design the beam for the given load, considering the reinforcement ratio p < 0.5 pb Figure 3 WDL = 20 kN/m WLL= 20 kN/m 8.0 marrow_forwardOlin's Construction: Principles, Materials, and Methods By H. Leslie Simmonsarrow_forward
- The L6 x 4 x 1/2 single angle shown has two rows of bolts. Each leg has one row (one line) of 5/8 in bolts in each leg as shown. Determine the net area (An). If needed, I attached the section properties from AISC manual for L6x4x1/2.arrow_forward3. Determine the reactions at the supports for the frame shown in following. 36.5 kN/m 14.6 kN/m Hinge R = 10 m 10 m -10 marrow_forward# 4 F3 Existing Flocculation Basin Design Parameters at 22.5 MGD: A) # of Basins: 5 B) # of Stages per Basin: 2 c) Basin Dimensions: (30 ft. X 4 ft. X 15 ft.) D) Volume per Basin 10,800 cf (80,787 Gal) E) Total Flocculation Volume: 54,000 cf (406,920 Gal) F) Theoretical Unit Detention Time: 25.9 minutes G) Flow through Velocity (Q): 1.16 ft/min Deliverables: 1) Determine if the existing flocculation basins are sufficient to accommodate the projected future capacity. A) Current Capacity: 22.5 MGD B) Future Capacity: 34.5 MGD for 110,000 residents C) If not, determine the number of additional flocculation basins needed to accommodate the future capacity of 34.5 MGD. a) Ignore this bullet point 2) Specify the basic dimensions (length, width, water height, weir dimensions, etc.) of these additional flocculation basins. 3) Specify the design flow rate, detention time, and the flow-through velocity for each basin under the maximum future capacity of 34.5 MGD, assuming one of the basins is…arrow_forward
- A1.4- Determine the factored moment resistance for the flanged beam (simply supported) shown in Figure 4. Given: Beam span L = 8m fc = 25MPa fy=400MPa As = 3-35M *350* mm 1.5 m Figure 4 *350* mm -60mmarrow_forwardA2.3- a simply supported reinforced concrete beam of rectangular cross-section is shown in Figure 3. The beam supports a uniform dead load of 20 kN/m (excluding the beam self-weight) and a uniform live load of 20 kN/m. The beam width is restricted to 400 mm. The maximum aggregate size is 20 mm. We are using 10M bars for stirrups and 25M bars for tension steel. Concrete is type N with f'c = 35 MPa and fy = 400 MPa. The beam needs to have 2hr fire rating. Design the beam for the given load, considering the reinforcement ratio p < 0.5 pb Figure 3 WDL = 20 kN/m WLL= 20 kN/m 8.0 marrow_forwardA2.2- For the given reinforced concrete section shown in Figure 2, a) Determine the balanced reinforced amount for this section; b) Calculate the ultimate moment resistance of the section if As = 8-20M. What is the mode of failure? c) Calculate the ultimate moment resistance of the section if As = 8-30M. Determine the strain in the steel reinforcement. Given: fc 30 MPa fy = 400 MPa 625 mm 500 mm + + *. 400 mm Figure 2arrow_forward
- A2.1- For a reinforced concrete beam (typical cross-section is shown in Figure 1), a) Determine the maximum moment that this beam can resist before cracking; b) Determine the beam moment of inertia after cracking. Given: The beam is reinforced with 4-25M longitudinal bars f'c = 35 MPa fy = 400 MPa 600 mm 530 mm + * 400 mm * Figure 1arrow_forwardCalculate the number of 8 x 8 x 16 inch blocks needed to complete the wall overhead doors 10 x 12 ft high If Lintel blocks are required wherever the #4 horizontal bars are located and above the doors how many plain blocks and how many lintel blocks are needed for the wall. Show all calculationsarrow_forwardCalculate the quantity of cubic yards needed for the spread footing usinf a waste factor of 10% Determine the amount of rebar needed for the spread footing, dowels extend 24 inches into the colum Allow for 3 inch concrete cover Show all work pleasearrow_forward
- Steel Design (Activate Learning with these NEW ti...Civil EngineeringISBN:9781337094740Author:Segui, William T.Publisher:Cengage LearningMaterials Science And Engineering PropertiesCivil EngineeringISBN:9781111988609Author:Charles GilmorePublisher:Cengage LearningEngineering Fundamentals: An Introduction to Engi...Civil EngineeringISBN:9781305084766Author:Saeed MoaveniPublisher:Cengage Learning


