Basics Of Engineering Economy
Basics Of Engineering Economy
2nd Edition
ISBN: 9780073376356
Author: Leland Blank, Anthony Tarquin
Publisher: MCGRAW-HILL HIGHER EDUCATION
bartleby

Videos

Textbook Question
Book Icon
Chapter 4, Problem 43P

The U.S. Army received two proposals for a turnkey design/build project for barracks for infantry unit soldiers in training. Proposal A involves an off-the-shelf “bare-bones” design and standard grade construction of walls, windows, doors, and other features. With this option, heating and cooling costs will be greater, maintenance costs will be higher, and replacement will occur earlier than proposal B. The initial cost for A will be $750,000. Heating and cooling costs will average $6000 per month with maintenance costs averaging $2000 per month. Minor remodeling will be required in years 5, 10, and 15 at a cost of $150,000 each time in order to render the units usable for 20 years. They will have no salvage value. Proposal B will include tailored design and construction costs of $1.1 million initially with estimated heating and cooling costs of $3000 per month and maintenance costs of $1000 per month. There will be no salvage value at the end of the 20-year life. Which proposal should be accepted on the basis of a life-cycle cost analysis at an interest rate of 0.5% per month?

Blurred answer
Students have asked these similar questions
Feasibility analysis for the immaginary vegetarian restaurant
Use the following information to calculate the change in value that would result if the benchmark were achieved for this company for a full year: Benchmark Cost per Occupied Room $ 3.85 Current Cost Per Occupied Room Total Rooms (per day) $ 4.00 1,500 Occupancy percentage Capitalization Rate 78 % 6 % Show your work.
Construction on your custom home is complete and now the yard must be landscaped. The landscape contractor has estimated that 8 cubic yards of dirt and 3 cubic yards of sand will be required to level the yard and provide proper drainage. Dirt is priced at $35 per cubic yard and sand is priced at $27 per cubic yard. She has measured the yard and calculated the area needing sod to be 3600 ft2. Sod is sold in rolls that measure 90 ft? at a cost of $10 each per roll. Shrubbery installation will cost an additional $2500. Estimate the cost of the landscaping.

Chapter 4 Solutions

Basics Of Engineering Economy

Knowledge Booster
Background pattern image
Economics
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, economics and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
ENGR.ECONOMIC ANALYSIS
Economics
ISBN:9780190931919
Author:NEWNAN
Publisher:Oxford University Press
Text book image
Principles of Economics (12th Edition)
Economics
ISBN:9780134078779
Author:Karl E. Case, Ray C. Fair, Sharon E. Oster
Publisher:PEARSON
Text book image
Engineering Economy (17th Edition)
Economics
ISBN:9780134870069
Author:William G. Sullivan, Elin M. Wicks, C. Patrick Koelling
Publisher:PEARSON
Text book image
Principles of Economics (MindTap Course List)
Economics
ISBN:9781305585126
Author:N. Gregory Mankiw
Publisher:Cengage Learning
Text book image
Managerial Economics: A Problem Solving Approach
Economics
ISBN:9781337106665
Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike Shor
Publisher:Cengage Learning
Text book image
Managerial Economics & Business Strategy (Mcgraw-...
Economics
ISBN:9781259290619
Author:Michael Baye, Jeff Prince
Publisher:McGraw-Hill Education
Difference between Renewable and Nonrenewable Resources; Author: MooMooMath and Science;https://www.youtube.com/watch?v=PLBK1ux5b7U;License: Standard Youtube License