The U.S. Army received two proposals for a turnkey design/build project for barracks for infantry unit soldiers in training. Proposal A involves an off-the-shelf “bare-bones” design and standard grade construction of walls, windows, doors, and other features. With this option, heating and cooling costs will be greater, maintenance costs will be higher, and replacement will occur earlier than proposal B. The initial cost for A will be $750,000. Heating and cooling costs will average $6000 per month with maintenance costs averaging $2000 per month. Minor remodeling will be required in years 5, 10, and 15 at a cost of $150,000 each time in order to render the units usable for 20 years. They will have no salvage value. Proposal B will include tailored design and construction costs of $1.1 million initially with estimated heating and cooling costs of $3000 per month and maintenance costs of $1000 per month. There will be no salvage value at the end of the 20-year life. Which proposal should be accepted on the basis of a life-cycle cost analysis at an interest rate of 0.5% per month?
Want to see the full answer?
Check out a sample textbook solutionChapter 4 Solutions
Basics Of Engineering Economy
- ENGINEERING ECONOMY RATE WILL BE GIVEN. WRITE THE COMPLETE SOLUTIONS/EXPLANATION LEGIBLY OR TYPEWRITTEN. GIVE STRAIGHT TO THE POINT EXPLANATION. A company is analyzing a make-versus-purchase situation for a component used in several products, and the engineering department has developed these data: Option A: Purchase 10,000 items per year at a fixed price of $8.50 per item. The cost of placing the order is negligible according to the present cost accounting procedure. Option B: Manufacture 10,000 items per year, using available capacity in the factory. Cost estimates are direct materials = $5.00 per item and direct labor = $1.50 per item. Manufacturing overhead is allocated at 200% of direct labor (= $3.00 per item). Based on these data, should the item be purchased or manufactured?arrow_forwardPure gasoline has an energy density of 115,600 BTU per gallon while ethanol has an energy density of 75,670 BTU per gallon. If gasoline costs $3.50 per gallon, (a) what would the cost of pure ethanol have to be in order for the energy costs of the two fuels to break even? (b) What would the price of E85 (85% ethanol, 15% gasoline) have to be for its energy cost to be the same as that of pure gasoline?arrow_forwardFocus on the difference between feasible alternatives. Insulated concrete forms (ICF) can be used as a substitute for conventional wood framing in building construction. Heating and cooling bills will be about 50% less than in a similar wood-framed building in upstate New York. An ICF home will be approximately 10% more expensive to construct than a wood-framed home. For a typical 2,000 ft2 home costing $120 per ft2 to construct in upstate New York and costing $200 per month to heat and cool, how many months does it take for a 2,000 ft2 ICF home to pay back its extraconstruction cost?arrow_forward
- Five years ago a dam was constructed to impound irrigation water and to provide flood protection for the area below the dam. Last winter a 100-year flood caused extensive damage both to the dam and to the surrounding area. This was not surprising, since the dam was designed for a 50-year flood. The cost to repair the dam now will be $250,000. Damage in the valley below amounts to $750,000. If the spillway is redesigned at a cost of $250,000 and the dam is repaired for another $250,000, the dam may be expected to withstand a 100-year flood without sustaining damage. However, the storage capacity of the dam will not be increased and the probability of damage to the surrounding area below the dam will be unchanged. A second dam can be constructed up the river from the existing dam for $1 million. The capacity of the second dam would be more than adequate to provide the desired flood protection. If the second dam is built, redesign of the existing dam spillway will not be necessary, but…arrow_forwardCanadian oil company is considering whether or not to develop a site it has been exploring for the past six months. One of the arguments for developing the site is that considerable time and money have already been expended. This cost should not be included in the capital budgeting decision because it is: Unsure A.sunk cost B.An agency cost C.An operating cost D.A financing cost E.An opportunity costarrow_forwardhelp please answer in text form with proper workings and explanation for each and every part and steps with concept and introduction no AI no copy paste remember answer must be in proper format with all workingarrow_forward
- M. Cotteleer Electronics supplies microcomputer circuitry to a company that incorporates microprocessors into refrigerators and other home appliances. One of the components has an annual demand of 250 units, and this is constant throughout the year. Carrying cost is estimated to be $1 per unit per year, and the ordering (setup) cost is $20 per order. a) To minimize cost, how many units should be ordered each time an order is placed? b) How many orders per year are needed with the optimal policy? c) What is the average inventory if costs are minimized? d) Suppose that the ordering (setup) cost is not $20, and Cotteleer has been ordering 150 units each time an order is placed. For this order policy (of Q 5 150) to be optimal, determine what the ordering (setup) cost would have to be.arrow_forwardA small automotive supply company manufactures fuel gauges for various types of cars. The company has fixed costs of $1,885,000 per year. The average cost of manufacturing a fuel gauge is $21.88. The average price the fuel gauge sells for is $48.20 The company manufactures its products 252 days per year. What is the minimum number of fuel guages per day that the company must produce in order to break even?arrow_forwardA firm is considering the “make vs. buy” question for a subcomponent. If the part is made in-house, the production data would be: first cost = $350, 000; annual costs for operation = $45, 000; salvage value = $15, 000; project life = 5 years; interest = 10%; and material cost per unit = $8.50. If annual production is 10,000 units, the maximum amount that the firm should be willing to pay to an outside vendor for the subcomponent is nearest? (a) $10 per unit (b) $16 per unit (c) $22 per unit (d) $28 per unit?arrow_forward
- PROBLEM NO. 1: The cost of producing a commodity consists of P35 per unit of labor, P42 per unit of materials, and P10 per unit for other variable costs. Cost of utilities and rents amounts to P850,000 per month. If the commodity is sold at P310 each; (a) What is the profit/loss if 3369 units were sold? (b) How many pieces must be produced each month for the manufacturer to breakeven?arrow_forwardAn automobile spare part is sold for $15 per unit. The VC are $3 per unit, 15000 units of the product are sold annually and a profit of $80,000 is made. The change to be made in the design of the product will increase the VC by 20% and the FC by 10%, and the sales amount will increase to 18000 units. a) At what selling price do we break even? b) What is the annual profit when the selling price remains the same ($12/unit)?arrow_forwardA company in Denver started a new production line to manufacture a new part. The table below showed the costs. If the parts will be sold at the selling price = $15.00/unit, what annual production quantity need to be manufactured to make it breakeven? Material and Parts Cost $3.00/unit, Labor Costs $4.00/unit, Overhead Cost $2,500,000, Annual Production Quantity ? unitsarrow_forward
- Principles of Economics (12th Edition)EconomicsISBN:9780134078779Author:Karl E. Case, Ray C. Fair, Sharon E. OsterPublisher:PEARSONEngineering Economy (17th Edition)EconomicsISBN:9780134870069Author:William G. Sullivan, Elin M. Wicks, C. Patrick KoellingPublisher:PEARSON
- Principles of Economics (MindTap Course List)EconomicsISBN:9781305585126Author:N. Gregory MankiwPublisher:Cengage LearningManagerial Economics: A Problem Solving ApproachEconomicsISBN:9781337106665Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike ShorPublisher:Cengage LearningManagerial Economics & Business Strategy (Mcgraw-...EconomicsISBN:9781259290619Author:Michael Baye, Jeff PrincePublisher:McGraw-Hill Education