Question
Chapter 4, Problem 45P
To determine
Select the project.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Annual demand is 42,626 units/year. Ordering Cost is $52/order. Holding cost is $5/unit/year.
What is the time between the two orders in days (assuming 365 days per year)?
EMERGENCY! Production just informed management that one of its five glycol squeezers has been destroyed by a rogue computer virus. Production capability is now only 23000 gallons at most. The squeezer cannot be fixed and IceLess cannot afford a replacement. This breakdown will NOT lower fixed costs. This breakdown will not change variable cost per unit, either. If only 23000 gallons are produced, and the earning target remains $94400 above fixed costs, what price per gallon must now be charged? (show your calculations
What is the Contribution Margin Ratio (CMR) if the price is $8.82 per gallon?
At a price of $10.95 per gallon, what will be the DOL (assume 23000 gallons are sold , that $94400 above fixed costs is to be earned, and that other costs are as initially given)(show your calculations).
Note: don't use chat gpt.
Chapter 4 Solutions
Basics Of Engineering Economy
Ch. 4 - State two conditions under which the do-nothing...Ch. 4 - Prob. 2PCh. 4 - Prob. 3PCh. 4 - Prob. 4PCh. 4 - Prob. 5PCh. 4 - Prob. 6PCh. 4 - Prob. 7PCh. 4 - Prob. 8PCh. 4 - Prob. 9PCh. 4 - The costs associated with manufacturing a...
Ch. 4 - Prob. 11PCh. 4 - Prob. 12PCh. 4 - Prob. 13PCh. 4 - Prob. 14PCh. 4 - Prob. 15PCh. 4 - Prob. 16PCh. 4 - Prob. 17PCh. 4 - Prob. 18PCh. 4 - Prob. 19PCh. 4 - Prob. 20PCh. 4 - Prob. 21PCh. 4 - Prob. 22PCh. 4 - Prob. 23PCh. 4 - Prob. 24PCh. 4 - Prob. 25PCh. 4 - Prob. 26PCh. 4 - Prob. 27PCh. 4 - Prob. 28PCh. 4 - Prob. 29PCh. 4 - Prob. 30PCh. 4 - Prob. 31PCh. 4 - Two mutually exclusive projects have the estimated...Ch. 4 - Prob. 33PCh. 4 - Prob. 34PCh. 4 - Prob. 35PCh. 4 - Prob. 36PCh. 4 - Prob. 37PCh. 4 - The manager of engineering at the 900-megawatt...Ch. 4 - Prob. 39PCh. 4 - Prob. 40PCh. 4 - Prob. 41PCh. 4 - Three different plans were presented to the GAO by...Ch. 4 - The U.S. Army received two proposals for a turnkey...Ch. 4 - Prob. 44PCh. 4 - Prob. 45PCh. 4 - Prob. 46PCh. 4 - Prob. 47PCh. 4 - Prob. 48PCh. 4 - Prob. 49PCh. 4 - Prob. 50PCh. 4 - Prob. 51PCh. 4 - Prob. 52PCh. 4 - Prob. 53PCh. 4 - Prob. 54PCh. 4 - Prob. 55PCh. 4 - Prob. 56PCh. 4 - Prob. 57PCh. 4 - Prob. 58PCh. 4 - Prob. 59PCh. 4 - Prob. 60PCh. 4 - Prob. 61PCh. 4 - Prob. 62PCh. 4 - Prob. 63APQCh. 4 - Prob. 64APQCh. 4 - Prob. 65APQCh. 4 - Prob. 66APQCh. 4 - Prob. 67APQCh. 4 - Prob. 68APQCh. 4 - Prob. 69APQCh. 4 - Prob. 70APQCh. 4 - Prob. 71APQ
Knowledge Booster
Similar questions
- A dozer with as S-blade has pushed a normal load onto a level area. The height of this load measured at the inside edge of each track was 7 ft and 7.4 ft. The width of the load at the inside edge of each track was 8.1 ft and 8.4 ft. The greatest length of the pile was 16ft. What is the capacity of the blade?arrow_forwardWhat is the total costing based on the following shipment? Dimensions: Weight: 4 pieces, 70 in L x 100 in W x 5 in H each piece. 100 kg each piece. Chargeable weight: 400 kg. Total charges CPT CDG airport, Paris, France Origin pick up fee: Origin handling fee: CAD $0.20/kg CAD $0.20 x 400 = CAD $80.00 CAD $45.00 /shipment CAD $45.00 CAD $45.00 Origin terminal handling charges: CAD $0.04/kg CAD $0.04 x 400 = CAD $16.00 NavCan surcharge: B13A Export Declaration: CAD $0.07/kg CAD CAD $0.07 x 400 = CAD $17.50/shipment CAD $28.00 CAD $17.50 Air freight: $17.50/shipment CAN $4.40/kg Fuel surcharge: CAD $0.15/kg CAD $4.40 x 400 CAD $0.15 x 400 CAD $1,760.00 CAD $60.00 Security surcharge: CAD $0.08/kg CAD $0.08 x 400 CAD $32.00 TOTAL $2,040.50 $2,038.50 $2,006.50 $2,667.47arrow_forwardA factory installs new machinery that saves S(x) = 1800 dollars per year. y $ per year 1800 savings S=1800- 80 x net savings cost C = 100 x Year 80x dollars per year, where x is the number of years since installation. However, the cost of maintaining the new machinery is C(x) : = 100x X (a) Find the year x at which the maintenance cost C(x) will equal the savings S(x). (At this time, the new machinery should be replaced. Round your answer to the nearest whole number.) X = years (b) Find the accumulated net savings (in dollars) [savings S(x) minus cost C(x)] during the period from t = 0 to the replacement time found in part (a). (Round your answer to the nearest whole number.)arrow_forward
- The price of a car you want is $37,000 today. Its price is expected to increase by $1000 each year. You now have $24,500 in an investment account, which is earning 9% per year. How many years will it be before you have enough to buy the car without borrowing any money? (Use Goal Seek to determine the time taken.) The time taken is determined to be years.arrow_forwardA manufacturer buys certain equipment form suppliers at $30 per unit. Total requirement is 200 units/ quarter. Ineventory carrying cost is 10% /year. Cost of placing an order is $100. Rent, insurance, storing per unit per year $3. SOLVE for the following: EOQ=? N=? T=? (in months) Total cost If 1300 is the current order quantity, how much would they save by switching to the EOQ?arrow_forwardEstimate the production in CCY per hour a roller if it is average speed will be 4 mph and it will cover 5.5 ft in one pass. The job specifications limit the compacted lift thickness to 5 in. and require four passes per lift. The company usually figures production based on 50-min hours.arrow_forward
- A company is investigating the “make or buy” decision for a new item, with the following cost structure: a) At what volumes would each decision be preferred?b) What is the most economical decision for a volume of 15,000 per year?arrow_forwardFind the value of APS when the APC is given as 0.65?arrow_forwardhow to design a numerical break-even analysis location technique?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Principles of Economics (12th Edition)EconomicsISBN:9780134078779Author:Karl E. Case, Ray C. Fair, Sharon E. OsterPublisher:PEARSONEngineering Economy (17th Edition)EconomicsISBN:9780134870069Author:William G. Sullivan, Elin M. Wicks, C. Patrick KoellingPublisher:PEARSON
- Principles of Economics (MindTap Course List)EconomicsISBN:9781305585126Author:N. Gregory MankiwPublisher:Cengage LearningManagerial Economics: A Problem Solving ApproachEconomicsISBN:9781337106665Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike ShorPublisher:Cengage LearningManagerial Economics & Business Strategy (Mcgraw-...EconomicsISBN:9781259290619Author:Michael Baye, Jeff PrincePublisher:McGraw-Hill Education
Principles of Economics (12th Edition)
Economics
ISBN:9780134078779
Author:Karl E. Case, Ray C. Fair, Sharon E. Oster
Publisher:PEARSON
Engineering Economy (17th Edition)
Economics
ISBN:9780134870069
Author:William G. Sullivan, Elin M. Wicks, C. Patrick Koelling
Publisher:PEARSON
Principles of Economics (MindTap Course List)
Economics
ISBN:9781305585126
Author:N. Gregory Mankiw
Publisher:Cengage Learning
Managerial Economics: A Problem Solving Approach
Economics
ISBN:9781337106665
Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike Shor
Publisher:Cengage Learning
Managerial Economics & Business Strategy (Mcgraw-...
Economics
ISBN:9781259290619
Author:Michael Baye, Jeff Prince
Publisher:McGraw-Hill Education