Question
Chapter 4, Problem 35P
a:
To determine
Select the project.
b:
To determine
Number of time project is repurchased.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
You have been asked to evaluate two alternatives, X and Y, that may increase plant capacity for manufacturing high-pressure hydraulic hoses. The parameters associated with each alternative have been estimated. Which one should be selected on the basis of a present worth comparison at an interest rate of 12% per year? Why is yours the correct choice? Alternative X Y First cost, $ −45,000 −58,000 Maintenance cost, $/year −8,000 −4,000 Salvage value, $ 2,000 12,000 Life, years 5 5
The initial cost of a packed-bed degassing reactor for removing trihalomethanes from potable water is $84,000. The annual operating cost for power, site maintenance, etc. is $13,000. If the salvage value of the pumps, blowers, and control systems is expected to be $9000 at the end of 10 years, the AW of the packed-bed reactor, at an interest rate of 8% per year, is closest to: (a) $−26,140 (b) $−25,518 (c) $−24,900 (d) $−13,140
An environmental engineer wants to evaluate three different methods for disposing of nonhazardous chemical waste: land application,
fluidized-bed incineration, and private disposal contract. Use the estimates below to help her determine which has the least cost at /=
13% per year on the basis of an annual worth evaluation.
First Cost
AOC per Year
Salvage Value
Life
Land
$-145.000
$-91,000
$23,000
4 years
Incineration
$-910,000
$-50,000
$310,000
6 years
The environmental engineer selects a✔(Click to select)
private disposal contract
land application
fluidized-bed incineration
Contract.
0
$-132,000
0
2 years
Chapter 4 Solutions
Basics Of Engineering Economy
Ch. 4 - State two conditions under which the do-nothing...Ch. 4 - Prob. 2PCh. 4 - Prob. 3PCh. 4 - Prob. 4PCh. 4 - Prob. 5PCh. 4 - Prob. 6PCh. 4 - Prob. 7PCh. 4 - Prob. 8PCh. 4 - Prob. 9PCh. 4 - The costs associated with manufacturing a...
Ch. 4 - Prob. 11PCh. 4 - Prob. 12PCh. 4 - Prob. 13PCh. 4 - Prob. 14PCh. 4 - Prob. 15PCh. 4 - Prob. 16PCh. 4 - Prob. 17PCh. 4 - Prob. 18PCh. 4 - Prob. 19PCh. 4 - Prob. 20PCh. 4 - Prob. 21PCh. 4 - Prob. 22PCh. 4 - Prob. 23PCh. 4 - Prob. 24PCh. 4 - Prob. 25PCh. 4 - Prob. 26PCh. 4 - Prob. 27PCh. 4 - Prob. 28PCh. 4 - Prob. 29PCh. 4 - Prob. 30PCh. 4 - Prob. 31PCh. 4 - Two mutually exclusive projects have the estimated...Ch. 4 - Prob. 33PCh. 4 - Prob. 34PCh. 4 - Prob. 35PCh. 4 - Prob. 36PCh. 4 - Prob. 37PCh. 4 - The manager of engineering at the 900-megawatt...Ch. 4 - Prob. 39PCh. 4 - Prob. 40PCh. 4 - Prob. 41PCh. 4 - Three different plans were presented to the GAO by...Ch. 4 - The U.S. Army received two proposals for a turnkey...Ch. 4 - Prob. 44PCh. 4 - Prob. 45PCh. 4 - Prob. 46PCh. 4 - Prob. 47PCh. 4 - Prob. 48PCh. 4 - Prob. 49PCh. 4 - Prob. 50PCh. 4 - Prob. 51PCh. 4 - Prob. 52PCh. 4 - Prob. 53PCh. 4 - Prob. 54PCh. 4 - Prob. 55PCh. 4 - Prob. 56PCh. 4 - Prob. 57PCh. 4 - Prob. 58PCh. 4 - Prob. 59PCh. 4 - Prob. 60PCh. 4 - Prob. 61PCh. 4 - Prob. 62PCh. 4 - Prob. 63APQCh. 4 - Prob. 64APQCh. 4 - Prob. 65APQCh. 4 - Prob. 66APQCh. 4 - Prob. 67APQCh. 4 - Prob. 68APQCh. 4 - Prob. 69APQCh. 4 - Prob. 70APQCh. 4 - Prob. 71APQ
Knowledge Booster
Similar questions
- Dexcon Technologies, Inc. is evaluating two alternatives to produce its new plastic filament with tribological (i.e., low friction) properties for creating custom bearings for 3-D printers. The estimates associated with each alternative are shown below. Using a MARR of 20% per year, which alternative has the lower present worth? Method DDM LS First cost, $ −164,000 −370,000 M&O cost, $/year −55,000 −21,000 Salvage value, $ 0 30,000 Life, years 2 4arrow_forwardA defense contractor has been able to summarize its total annual fixed costs as RM 100,000 and the total variable cost per unit of production as RM 33.(i) If only 5,000 units is all that is expected to sell to the government this year, determine what should the per unit selling price be to make a 25% profit this year.(ii) If foreign sales of 3,000 units per year is to be added to the 5,000 units government contract above and a 25% profit is acceptable for this contractor again, determine what could be the new selling price per unit.arrow_forwardA chemical processing corporation is considering two methods to dispose of a non-hazardous chemical sludge: land application and fluidized-bed incineration. The estimates for each method are shown below. Use the Annual Worth (AW) method at interest 10% per year to select the better alternative Land Application Incineration First cost, $ - 130,000 - 900,000 Annual operating cost, $ - 95,000 - 60,000 Salvage value, $ 25,000 300,000 Life, years 3 10% TABLE 15 Discrete Cash Flow: Compound Interest Factors 10% Single Payments Uniform Serles Payments Arithmetic Gradients Compound Amount Present Sinking Fund Compound Amount Capital Recovery A/P Gradient Present Worth P/G Gradient Uniform Series A/G Present Worth Worth F/P P/F A/F F/A P/A 1.00000 1.0000 2.1000 1.10000 0.57619 0.40211 1.1000 0.9091 0.9091 0.8264 0.7513 2 1.2100 0.47619 1.7355 0.8264 0.4762 2.4869 2.3291 4.3781 6.8618 9.6842 1.3310 0.30211 3.3100 0.9366 1.3812 0.31547 0.26380 0.22961 0.20541 0.21547 4.6410 3.1699 0.6830 0.6209 4…arrow_forward
- A chemical processing corporation is considering three methods to dispose of a nonhazardous chemical sludge: land application, fluidized-bed incineration, and private disposal contract. The estimates for each method are shown. Determine which has the least cost on the basis of a present worth comparison at 10% per year for the following scenarios (You may assume a planning horizon of 6 years.): (a) The estimates are as shown in the table above. b) If land application and incineration costs are as shown in the table, but the annual cost of the contract award cost increase by 20% every time the contract is renewed (every 2 years).arrow_forward8arrow_forwardDexcon Technologies, Inc., is evaluating two alternatives to produce its new plastic filament with low friction properties for creating custom bearings for 3-D printers. The estimates associated with each alternative are shown below. Using a MARR of 16% per year, which alternative has the better present worth and what is that value (select the closest value)? Method First Cost AOC, per Year Salvage Value Life DDM $170,000 $65,000 $4,000 2 years LS $350,000 $40,000 $29,000 4 years DDM with a PW--$473,000 LS with a PW --$445,900 LS with a PW --$222,055 DDM with a PW--$109,300arrow_forward
- Handheld fiber-optic meters with white light polarization interferometry are useful for measuring temperature, pressure, and strain in electrically noisy environments. The fixed costs associated with manufacturing are $800,000 per year. If a base unit sells for $2950 and its variable cost is $2075, (a ) how many units must be sold each year for breakeven? (b ) what will the profit be for sales of 3000 units per year?arrow_forwardQUESTION: To improve package tracking at a UPS transfer facility, conveyor equipment was upgraded with RFID sensors at a cost of $300 and has a useful life of 3 years. The operating cost is expected to be $150 per year. The salvage value of the equipment is expected to be $140 for the first 2 years, but due to obsolescence, it won't have a significant value after that. At an interest rate of 10% per year, (a) The economic service life of the equipment and associated annual worth (b) The percentage increase in the AW of cost if the equipment is retained 1 years longer than the ESL determinearrow_forwardA large textile company is trying to decide which sludge dewatering process it should use ahead of its sludge drying operation. The costs associated with centrifuge and belt press systems are shown. Compare them on the basis of their annual worths using an interest rate of 10% per year. System Centrifuge Belt Press First cost, $ −235,000 −150,000 AOC, $/year −48,000 −41,000 Overhaul in year 2, $ -- −26,000 Salvage value, $ 40,000 10,000 Life, years 6 4 The annual worth of the centrifuge system is $− , and the annual worth of the belt press system is $− . The system selected on the basis of the annual worth analysis is the (Click to select) belt press centrifuge system.arrow_forward
- Because of international competition, a company that manufactures high-speed submersible rotary indexing spindles must upgrade its production equipment to reduce costs over a 6-year planning horizon. The company can invest $80,000 one year from now, 2 years from now, or 3 years from now. Depending on when the investment is made, the savings will vary. That is, the savings will be $29,000, 34,000, or $38,000 per year if the investment is made 1, 2, or 3 years from now, respectively. Will the timing of the investment affect the request to make at least 20% per year return? Use future worth analysis and solve using factors. (Click to select) No Yes , the timing of the investment (Click to select) will not will affect the request to make at least 20% per year return. The investment must be made in (Click to select) 3 2 1 years.arrow_forwardBecause of international competition, a company that manufactures high-speed submersible rotary indexing spindles must upgrade its production equipment to reduce costs over a 6-year planning horizon. The company can invest $80,000 one year from now, 2 years from now, or 3 years from now. Depending on when the investment is made, the savings will vary. That is, the savings will be $20,000, 25,000, or $38,000 per year if the investment is made 1, 2, or 3 years from now, respectively. Will the timing of the investment affect the request to make at least 20% per year return? Use future worth analysis and solve using factors. Please provide excel formula.arrow_forwardConsider two air-conditioning systems with the estimates below. (a) Use AW analysis to determine the sensitivity of the economic decision to MARR values of 4%, 6%, and 8% per year. (b) Develop the spreadsheet functions that will display the six AW values. System 1 2 First cost, $ −10,000 −17,000 AOC, $ per year −600 −150 Salvage value, $ −100 −300 New compressor and motor cost at midlife, $ −1,750 −3,000 Life, years 8 12arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Principles of Economics (12th Edition)EconomicsISBN:9780134078779Author:Karl E. Case, Ray C. Fair, Sharon E. OsterPublisher:PEARSONEngineering Economy (17th Edition)EconomicsISBN:9780134870069Author:William G. Sullivan, Elin M. Wicks, C. Patrick KoellingPublisher:PEARSON
- Principles of Economics (MindTap Course List)EconomicsISBN:9781305585126Author:N. Gregory MankiwPublisher:Cengage LearningManagerial Economics: A Problem Solving ApproachEconomicsISBN:9781337106665Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike ShorPublisher:Cengage LearningManagerial Economics & Business Strategy (Mcgraw-...EconomicsISBN:9781259290619Author:Michael Baye, Jeff PrincePublisher:McGraw-Hill Education
Principles of Economics (12th Edition)
Economics
ISBN:9780134078779
Author:Karl E. Case, Ray C. Fair, Sharon E. Oster
Publisher:PEARSON
Engineering Economy (17th Edition)
Economics
ISBN:9780134870069
Author:William G. Sullivan, Elin M. Wicks, C. Patrick Koelling
Publisher:PEARSON
Principles of Economics (MindTap Course List)
Economics
ISBN:9781305585126
Author:N. Gregory Mankiw
Publisher:Cengage Learning
Managerial Economics: A Problem Solving Approach
Economics
ISBN:9781337106665
Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike Shor
Publisher:Cengage Learning
Managerial Economics & Business Strategy (Mcgraw-...
Economics
ISBN:9781259290619
Author:Michael Baye, Jeff Prince
Publisher:McGraw-Hill Education