Basics Of Engineering Economy
2nd Edition
ISBN: 9780073376356
Author: Leland Blank, Anthony Tarquin
Publisher: MCGRAW-HILL HIGHER EDUCATION
expand_more
expand_more
format_list_bulleted
Question
Chapter 4, Problem 44P
a:
To determine
Select the project.
b:
To determine
Select the project through spreadsheet.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
A building contractor can source door frames from either a nearby shop or a far-off forest area.
The cost details are summarized in the table below. The total requirement of wood for the
construction work is 75 tons. Find the best alternative for buying the wooden frames. Also find
the economic advantage of the best alternative.
Items
Nearby Shop Far-off Forest Area
Negligible
Distance to site
900 km
$100
Transportation cost per ton per km
Material cost per ton
Negligible
$ 2,000
$ 1,250
Two automatic systems for dispensing maps are being compared by the state highway department. The accompanying breakeven chart of the comparison of these systems (System I vs. System II) shows total yearly costs for the number of maps dispensed per year for both alternatives. Answer the following questions. (a) What is the fixed cost for System I? (b) What is the fixed cost for System II? (c) What is the variable cost per map dispensed for System I? (d) What is the variable cost per map dispensed for System II? (e) What is the breakeven point in terms of maps dispensed at which the two systems have equal annual costs? (f) For what range of annual number of maps dispensed is System I recommended? (g) For what range of annual number of maps dispensed is System II recommended? (h) At 3000 maps per year, what are the marginal and average map costs for each system?
Identify the following cost elements as first-cost (FC) components or annual operating cost (AOC) components for a piece of equipment in a chemical processing plant: rent, direct labor, equipment overhaul, overhead, supplies, insurance, equipment cost, utility cost, installation, delivery charges, salaried personnel, and periodic safety training.
Chapter 4 Solutions
Basics Of Engineering Economy
Ch. 4 - State two conditions under which the do-nothing...Ch. 4 - Prob. 2PCh. 4 - Prob. 3PCh. 4 - Prob. 4PCh. 4 - Prob. 5PCh. 4 - Prob. 6PCh. 4 - Prob. 7PCh. 4 - Prob. 8PCh. 4 - Prob. 9PCh. 4 - The costs associated with manufacturing a...
Ch. 4 - Prob. 11PCh. 4 - Prob. 12PCh. 4 - Prob. 13PCh. 4 - Prob. 14PCh. 4 - Prob. 15PCh. 4 - Prob. 16PCh. 4 - Prob. 17PCh. 4 - Prob. 18PCh. 4 - Prob. 19PCh. 4 - Prob. 20PCh. 4 - Prob. 21PCh. 4 - Prob. 22PCh. 4 - Prob. 23PCh. 4 - Prob. 24PCh. 4 - Prob. 25PCh. 4 - Prob. 26PCh. 4 - Prob. 27PCh. 4 - Prob. 28PCh. 4 - Prob. 29PCh. 4 - Prob. 30PCh. 4 - Prob. 31PCh. 4 - Two mutually exclusive projects have the estimated...Ch. 4 - Prob. 33PCh. 4 - Prob. 34PCh. 4 - Prob. 35PCh. 4 - Prob. 36PCh. 4 - Prob. 37PCh. 4 - The manager of engineering at the 900-megawatt...Ch. 4 - Prob. 39PCh. 4 - Prob. 40PCh. 4 - Prob. 41PCh. 4 - Three different plans were presented to the GAO by...Ch. 4 - The U.S. Army received two proposals for a turnkey...Ch. 4 - Prob. 44PCh. 4 - Prob. 45PCh. 4 - Prob. 46PCh. 4 - Prob. 47PCh. 4 - Prob. 48PCh. 4 - Prob. 49PCh. 4 - Prob. 50PCh. 4 - Prob. 51PCh. 4 - Prob. 52PCh. 4 - Prob. 53PCh. 4 - Prob. 54PCh. 4 - Prob. 55PCh. 4 - Prob. 56PCh. 4 - Prob. 57PCh. 4 - Prob. 58PCh. 4 - Prob. 59PCh. 4 - Prob. 60PCh. 4 - Prob. 61PCh. 4 - Prob. 62PCh. 4 - Prob. 63APQCh. 4 - Prob. 64APQCh. 4 - Prob. 65APQCh. 4 - Prob. 66APQCh. 4 - Prob. 67APQCh. 4 - Prob. 68APQCh. 4 - Prob. 69APQCh. 4 - Prob. 70APQCh. 4 - Prob. 71APQ
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, economics and related others by exploring similar questions and additional content below.Similar questions
- Oil spill cleanup costs for a nation or region can be estimated by taking the average cost for the specified region and multiplying it by various modification factors" that are a function of oil type (light crude, heavy crude, No 4 fuel, etc.), spill size (< 34 tons, 34-340 tons. etc.), location type (offshore, nearshore, in-port), cleanup method (dispersant, burning, manual), and extent of shoreline oiling (0-1 km. 2-5 km, etc.). For an average cost of $23.100 per liter and modifiers for a region in the United States of 1.350, 0.65, 1.28, 0.25, and 1.320 for oil type, spill size, location type, cleanup method, and extent of shoreline oiling, respectively, determine the estimated cleanup cost per liter of an oil spill in the region of the United States (Round the final answer to three decimal places) The cleanup cost per liter of an oil spill in the region of the United States is estimated to be $arrow_forwardWhile drawing cost curves, the state of technology must be kept constant True/Falsearrow_forward1arrow_forward
- In the breakeven analysis, fixed costs are constant. Over time these expenses can change. Give some examples of fixed costs that change over time.arrow_forwardEconomic cost is equal to the sum of exiplicit and implicit costs. True/ Falsearrow_forwardA labor-intensive process has a fixed cost of $338,000 and a variable cost of $143 per unit. A capital-intensive (automated) process for the same product has a fixed cost of $1,244,000 and a variable cost of $92.50 per unit. How many units must be produced and sold at $197 each for the automated process to be preferred to the labor-intensive process?arrow_forward
- A company operates a summer camp. The cost data for a 12-week summer camp is as follows: Charge per camper $400/week. Variable cost per camper $220/week, Fixed costs $240,000 per summer season Capacity per week 200 camper. the total number of campers to breakeven for the season isarrow_forwardAfter a six months of work on the projects site, your company collected the following information relating to work down so far on the project BAC=$156,478.00, planned value=$95,565.24, Earned value =$92, 985.56, Actual cost =$95986.60. calculate the cost and schedule permermance indices and interpret your resultsarrow_forwardHow many books will a publisher have to sell to breakeven if fixed costs are $100,000, the selling price perbook is $60, and the variable costs per book are $40?arrow_forward
- An industrial engineering consulting firm usually observes a 90% learning curve rate in the installation of enterprise level software with its clients. If the first installation required 75 hours, estimate the time required for (a) the fifth, (b) the tenth, and (c) the twentieth installations. (d) Research the AMCF Code of Ethics. How are these similar to and different from engineering society ethics statements from your discipline?arrow_forwardHilton Enterprises sells a product for $119 per unit. The variable cost is $68 per unit, while fixed costs are $436,968. Determine (a) the break-even point in sales units and (b) the break-even point if the selling price were increased to $124 per unit. a. Break-even point in sales units units b. Break-even point if the selling price were increased to $124 per unit unitsarrow_forwardPlant design economics Only part (iii) required i.e plotarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Managerial Economics: Applications, Strategies an...EconomicsISBN:9781305506381Author:James R. McGuigan, R. Charles Moyer, Frederick H.deB. HarrisPublisher:Cengage LearningManagerial Economics: A Problem Solving ApproachEconomicsISBN:9781337106665Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike ShorPublisher:Cengage Learning
Managerial Economics: Applications, Strategies an...
Economics
ISBN:9781305506381
Author:James R. McGuigan, R. Charles Moyer, Frederick H.deB. Harris
Publisher:Cengage Learning
Managerial Economics: A Problem Solving Approach
Economics
ISBN:9781337106665
Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike Shor
Publisher:Cengage Learning
Decision Tree Analysis - Intro and Example with Expected Monetary Value; Author: Vincent Stevenson;https://www.youtube.com/watch?v=cbCsCQ4l4Zs;License: Standard Youtube License