Question
Chapter 4, Problem 16P
a:
To determine
Calculate the present worth.
b:
To determine
Calculate the present worth through calculator.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Polypropylene wall caps, used for covering exterior vents for kitchen cooktops. bathroom fans, dryers, and
other building air exhausts. can be made by two different methods. Method X will have a first cost of $75,000.
an operating cost of $32,000 per year, and a $9000 salvage value after 4 years. Method Y will have a first cost of
$140,000. an operating cost of $24,000 per year, and a $19,000 salvage value after its 4-year life. At an interest
rate of 10% per year, which method should be used on the basis of an annual worth analysis?
10%
TABLE 15 Discrete Cash Flow: Compound interest Factors
10%
Single Payments
Uniform Series Payments
Arithmetic Gradients
Compound
Amount
Capital
Recovery
Present
Sinking
Fund
Compound
Amount
Present
Gradient
Gradient
Worth
Worth
Present Worth
Uniform Series
F/P
P/F
A/F
F/A
A/P
P/A
P/G
A/G
L1000
110000
0.9091
09091
08264
10000
0.47619
0.30211
10000
04762
0.9366
12100
21000
0.57619
0.40211
1.7355
13310
0.7513
3.3100
2.4869
23291
14641
06830
0.21547
4,6410…
3
Hand written solutions are strictly prohibited
Chapter 4 Solutions
Basics Of Engineering Economy
Ch. 4 - State two conditions under which the do-nothing...Ch. 4 - Prob. 2PCh. 4 - Prob. 3PCh. 4 - Prob. 4PCh. 4 - Prob. 5PCh. 4 - Prob. 6PCh. 4 - Prob. 7PCh. 4 - Prob. 8PCh. 4 - Prob. 9PCh. 4 - The costs associated with manufacturing a...
Ch. 4 - Prob. 11PCh. 4 - Prob. 12PCh. 4 - Prob. 13PCh. 4 - Prob. 14PCh. 4 - Prob. 15PCh. 4 - Prob. 16PCh. 4 - Prob. 17PCh. 4 - Prob. 18PCh. 4 - Prob. 19PCh. 4 - Prob. 20PCh. 4 - Prob. 21PCh. 4 - Prob. 22PCh. 4 - Prob. 23PCh. 4 - Prob. 24PCh. 4 - Prob. 25PCh. 4 - Prob. 26PCh. 4 - Prob. 27PCh. 4 - Prob. 28PCh. 4 - Prob. 29PCh. 4 - Prob. 30PCh. 4 - Prob. 31PCh. 4 - Two mutually exclusive projects have the estimated...Ch. 4 - Prob. 33PCh. 4 - Prob. 34PCh. 4 - Prob. 35PCh. 4 - Prob. 36PCh. 4 - Prob. 37PCh. 4 - The manager of engineering at the 900-megawatt...Ch. 4 - Prob. 39PCh. 4 - Prob. 40PCh. 4 - Prob. 41PCh. 4 - Three different plans were presented to the GAO by...Ch. 4 - The U.S. Army received two proposals for a turnkey...Ch. 4 - Prob. 44PCh. 4 - Prob. 45PCh. 4 - Prob. 46PCh. 4 - Prob. 47PCh. 4 - Prob. 48PCh. 4 - Prob. 49PCh. 4 - Prob. 50PCh. 4 - Prob. 51PCh. 4 - Prob. 52PCh. 4 - Prob. 53PCh. 4 - Prob. 54PCh. 4 - Prob. 55PCh. 4 - Prob. 56PCh. 4 - Prob. 57PCh. 4 - Prob. 58PCh. 4 - Prob. 59PCh. 4 - Prob. 60PCh. 4 - Prob. 61PCh. 4 - Prob. 62PCh. 4 - Prob. 63APQCh. 4 - Prob. 64APQCh. 4 - Prob. 65APQCh. 4 - Prob. 66APQCh. 4 - Prob. 67APQCh. 4 - Prob. 68APQCh. 4 - Prob. 69APQCh. 4 - Prob. 70APQCh. 4 - Prob. 71APQ
Knowledge Booster
Similar questions
- Need help.arrow_forwardTo produce an item in-house, equipment costing $250,000 must be purchased. It will have a life of 4 years and an annual cost of $80,000; each unit will cost $40 to manufacture. Buying the item externally will cost $100 per unit. At i = 12%, determine the breakeven production number.arrow_forwardAn electric switch manufacturing company is trying to decide between three different assembly methods. Method A has an estimated first cost of $40,000, an annual operating cost (AOC) of $9000, and a service life of 2 years. Method B will cost $80,000 to buy and will have an AOC of $6000 over its 4-year service life. Method C costs $130,000 initially with an AOC of $4000 over its 8-year life. Methods A and B will have no salvage value, but Method C will have equipment worth 10% of its first cost. Perform both (a) future worth, and (b) present worth analyses to select the method at i = 10% per year.arrow_forward
- The direct labor cost and direct material cost of a certain product is P300 and P400 per unit, respectively. Fixed charges are P100,000 per month and other variable cost are P100 per unit. If the product is sold for P1200 per unit, how many units must be produced and sold to break even?arrow_forwardTwo processes can be used for producing a polymer that reduces friction loss in engines. Process T will have a first cost of $600,000,. an operating cost of $84,000 per year, and a salvage value of $80,000 after its 2-year life. Process W will have a first cost of $1,320,000, an operating cost of $25,000 per year, and a $120,000 salvage value after its 4-year life. Process W will also require updating at the end of year 2 at a cost of $90,000. Which process should be selected on the basis of a present worth analysis at a MARR of 12% per year? The present worth of process T is S- and the present worth of process W is $- The process selected on the basis of thepresent worth analysis is process (Click to select)arrow_forwardTwo automatic systems for dispensing maps are being compared by the state highway department. The accompanying breakeven chart of the comparison of these systems (System I vs. System II) shows total yearly costs for the number of maps dispensed per year for both alternatives. Answer the following questions. (a) What is the fixed cost for System I? (b) What is the fixed cost for System II? (c) What is the variable cost per map dispensed for System I? (d) What is the variable cost per map dispensed for System II? (e) What is the breakeven point in terms of maps dispensed at which the two systems have equal annual costs? (f) For what range of annual number of maps dispensed is System I recommended? (g) For what range of annual number of maps dispensed is System II recommended? (h) At 3000 maps per year, what are the marginal and average map costs for each system?arrow_forward
- Give typing answer with explanation and conclusion Two processes can be used for producing a polymer that reduces friction loss in engines. Process T will have a first cost of $780,000, an operating cost of $80,000 per year, and a salvage value of $80,000 after its 2-year life. Process W will have a first cost of $1,280,000, an operating cost of $25,000 per year, and a $120,000 salvage value after its 4-year life. Process W will also require updating at the end of year 2 at a cost of $90,000. Which process should be selected on the basis of a present worth analysis at a MARR of 12% per year? The present worth of process T is $− , and the present worth of process W is $− . The process selected on the basis of the present worth analysis is process (Click to select) .arrow_forwardEvaluate a combined cycle power plant on the basis of the PW method when the MARR is 12% per year. Pertinent cost data are as follows : Power Plant (thousands of $) Investment cost $13,000 Useful life 15 years Market value (EOY 15) $3,000 Annual operating expenses $1,000 Overhaul cost—end of 5th year $200 Overhaul cost—end of 10th year $550 USING FUTURE WORTH (FW)arrow_forwardBreakeven Analysis for a Project. A company that manufactures automatic blowdown control valves (for applications where boilers are operated unsupervised for 24 to 36 hours) has fixed cost of $160,000 per year and variable cost of $400 per valve. If the company expects to sell 12,000 valves per year, determine the selling price in order for the company to (a) break even, and (b) make a profit of $400,000 per yeararrow_forward
- In the breakeven analysis, fixed costs are constant. Over time these expenses can change. Give some examples of fixed costs that change over time.arrow_forwardTo make an item in-house, equipment costing $250,000 must be purchased. It will have a life of 4 years, annual operating cost of $80,000, and each unit will cost $40 to manufacture. Buying the item externally will cost $100 per unit. At i=15% per year, at what number of units needed per year will it be more economical to produce the item in-house? Using Breakeven Analysis, pls solve the problemarrow_forwardBennington Health purchased three dialysis systems each at an installed cost of $100,000 for different locations in the city. The AOC over 2 years varied as shown. (All values are costs.) The load factor in terms of percentage of clients at each location is shown in decimal form. Find the expected AW of costs for each location at /= 15% per year. Location Load Year 0 1 2 North (N) 0.50 100,000 20,000 11,000 South (S) 0.35 AOC, $ per year 100,000 15,000 12,000 The expected AW of costs for each location is $ West (W) 0.15 100,000 12,000 8,000arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Principles of Economics (12th Edition)EconomicsISBN:9780134078779Author:Karl E. Case, Ray C. Fair, Sharon E. OsterPublisher:PEARSONEngineering Economy (17th Edition)EconomicsISBN:9780134870069Author:William G. Sullivan, Elin M. Wicks, C. Patrick KoellingPublisher:PEARSON
- Principles of Economics (MindTap Course List)EconomicsISBN:9781305585126Author:N. Gregory MankiwPublisher:Cengage LearningManagerial Economics: A Problem Solving ApproachEconomicsISBN:9781337106665Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike ShorPublisher:Cengage LearningManagerial Economics & Business Strategy (Mcgraw-...EconomicsISBN:9781259290619Author:Michael Baye, Jeff PrincePublisher:McGraw-Hill Education
Principles of Economics (12th Edition)
Economics
ISBN:9780134078779
Author:Karl E. Case, Ray C. Fair, Sharon E. Oster
Publisher:PEARSON
Engineering Economy (17th Edition)
Economics
ISBN:9780134870069
Author:William G. Sullivan, Elin M. Wicks, C. Patrick Koelling
Publisher:PEARSON
Principles of Economics (MindTap Course List)
Economics
ISBN:9781305585126
Author:N. Gregory Mankiw
Publisher:Cengage Learning
Managerial Economics: A Problem Solving Approach
Economics
ISBN:9781337106665
Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike Shor
Publisher:Cengage Learning
Managerial Economics & Business Strategy (Mcgraw-...
Economics
ISBN:9781259290619
Author:Michael Baye, Jeff Prince
Publisher:McGraw-Hill Education