Question
Book Icon
Chapter 4, Problem 17P
Summary Introduction

To determine: Find the forecast of sales using exponential smoothing with smoothing constant 0.6 and 0.9 and infer the effect of exponential smoothing on forecast. Using MAD, determine the accurate forecast of exponential smoothing with given smoothing constant 0.3, 0.6 and 0.9.

Introduction: A sequence of data points in successive order is known as time series. Time series forecasting is the prediction based on past events which are at a uniform time interval. Moving average method and trend projections are two of the time series methods which use weights to prioritize past data.

Expert Solution & Answer
Check Mark

Answer to Problem 17P

On Comparing MAD from exponential smoothing with smoothing constant 0.3, 0.6 and 0.9 (refer to equations (1), (2) and (3)), it can be inferred that the MAD of exponential smoothing with smoothing constant is most accurate because of least value of MAD.

Explanation of Solution

Forecast of sales using exponential smoothing with smoothing constant 0.6:

Given information:

Year Sales
1 450
2 495
3 518
4 563
5 584

Initial forecast for year 1=410Smoothingconstant=0.6

Formula to calculate the forecasted demand:

Ft=Ft-1+α(At-1-Ft-1)

Where,

Ft=newforecastFt-1=Previousperiod'sforecastα=smoothingconstantAt-1=PreviousperiodactualDemand

Smoothing constant=0.6
Year Sales Forecast Absolute error
1 450 410 40
2 495 434 61
3 518 470.6 47.4
4 563 499.04 63.96
5 584 537.416 46.584
6 565.3664
Total 258.944
MAD 51.7888

Excel worksheet:

Pearson eText Principles of Operations Management: Sustainability and Supply Chain Management -- Instant Access (Pearson+), Chapter 4, Problem 17P , additional homework tip  1

Calculation of the forecast for year 2:

F2=F1+α(A1-F1)=410+0.6(450410)=434

To calculate the forecast for year 2, substitute the value of forecast of year 1, smoothing constant and the difference of actual and forecasted demand in the above formula. The result of the forecast for year 2 is 434.

Calculation of the forecast for year 3:

F3=F2+α(A2-F2)=434+0.6(495434)=470.6

To calculate the forecast for year 3, substitute the value of forecast of year 2, smoothing constant and the difference of actual and forecasted demand in the above formula. The result of the forecast for year 3 is 470.6.

Calculation of the forecast for year 4:

F4=F3+α(A3-F3)=470.60+0.6(518470.60)=499.04

To calculate the forecast for year 4, substitute the value of forecast of year 3, smoothing constant and the difference of actual and forecasted demand in the above formula. The result of the forecast for year 4 is 499.04.

Calculation of the forecast for year 5:

F5=F4+α(A4-F4)=499.04+0.6(563499.04)=537.416

To calculate the forecast for year 5, substitute the value of forecast of year 4, smoothing constant and the difference of actual and forecasted demand in the above formula. The result of the forecast for year 5 is 537.416.

Calculation of the forecast for year 6:

F6=F5+α(A5F5)=537.416+0.6(584537.416)=565.36

To calculate the forecast for year 5, substitute the value of forecast of year 5, smoothing constant and the difference of actual and forecasted demand in the above formula. The result of the forecast for year 6 is 565.36.

Calculation of MAD using exponential smoothing with smoothing constant α=0.6:

Formula to calculate the Mean Absolute Deviation:

MAD=|ActualForecast|n

Calculation of the absolute error for year 1:

Absoluteerror=|ActualForecast|=|450410|=|40|=40

The absolute error for year 1 is the modulus of the difference between 450 and 410, which corresponds to 40. Therefore, the absolute error for year 1 is 40.

Calculation of the absolute error for year 2:

Absoluteerror=|Actual-Forecast|=|495434|=|61|=61

The absolute error for year 2 is the modulus of the difference between 495 and 434, which is correspond to 61. Therefore, the absolute error for year 2 is 61.

Calculation of the absolute error for year 3:

Absoluteerror=|Actual-Forecast|=|518470.6|=|47.4|=47.4

The absolute error for year 3 is the modulus of the difference between 518and 470.6, which is correspond to 47.4. Therefore, the absolute error for year 3 is 47.4.

Calculation of the absolute error for year 4:

Absoluteerror=|Actual-Forecast|=|563499.04|=|63.96|=63.96

The absolute error for year 4 is the modulus of the difference between 563and499.04, which is correspond to 63.96. Therefore, the absolute error for year 4 is 63.96.

Calculation of the absolute error for year 5:

Absoluteerror=|Actual-Forecast|=|584537.416|=|46.584|=46.584

The absolute error for year 5 is the modulus of the difference between 584and537.416, which is correspond to 46.584. Therefore, the absolute error for year 5 is 46.584.

Calculation of the Mean Absolute Deviation using exponential smoothing with smoothing constant 0.6:

MAD=|Actual-Forecast|n=40+61+47.4+63.96+46.5845=258.9445=51.7888 (1)

Upon the substitution of summation value of the absolute error for 5 years, that is, 258.944 is divided by the number of years. That is, 5 yields MAD of 51.7888.

The forecast of sales using exponential smoothing with 0.6 as smoothing constant is 565.36 and MAD is 51.7888.

Forecast of sales using exponential smoothing with smoothing constant 0.9:

Given information:

Year Sales
1 450
2 495
3 518
4 563
5 584

Initial forecast for year 1=410Smoothingconstant=0.9

Formula to calculate the forecasted demand:

Ft=Ft-1+α(At-1Ft-1)

Where,

Ft=newforecastFt-1=Previousperiod'sforecastα=smoothingconstantAt-1=PreviousperiodactualDemand

Smoothing constant=0.9
Year Sales Forecast Absolute error
1 450 410 40
2 495 446 49
3 518 490.1 27.9
4 563 515.21 47.79
5 584 558.221 25.779
6 581.4221
Total 190.469
MAD 38.0938

Excel worksheet:

Pearson eText Principles of Operations Management: Sustainability and Supply Chain Management -- Instant Access (Pearson+), Chapter 4, Problem 17P , additional homework tip  2

Calculation of the forecast for year 2:

F2=F1+α(A1-F1)=410+0.9(450410)=446

To calculate the forecast for year 2, substitute the value of forecast of year 1, smoothing constant and difference of actual and forecasted demand in the above formula. The result of the forecast for year 2 is 446.

Calculation of the forecast for year 3:

F3=F2+α(A2-F2)=446+0.9(495446)=490.1

To calculate the forecast for year 3, substitute the value of forecast of year 2, smoothing constant and difference of actual and forecasted demand in the above formula. The result of the forecast for year 3 is 490.1.

Calculation of the forecast for year 4:

F4=F3+α(A3-F3)=490.1+0.9(518490.1)=515.21

To calculate the forecast for year 4, substitute the value of forecast of year 3, smoothing constant and difference of actual and forecasted demand in the above formula. The result of the forecast for year 4 is 515.21.

Calculation of the forecast for year 5:

F5=F4+α(A4-F4)=515.21+0.9(563515.21)=558.221

To calculate the forecast for year 5, substitute the value of forecast of year 4, smoothing constant and difference of actual and forecasted demand in the above formula. The result of forecast for year 5 is 558.221.

Calculation of the forecast for year 6:

F6=F5+α(A5-F5)=558.221+0.9(584558.221)=581.42

To calculate the forecast for year 6, substitute the value of forecast of year 5, smoothing constant and difference of actual and forecasted demand in the above formula. The result of forecast for year 6 is 581.42.

Calculation of MAD using exponential smoothing with smoothing constant α=0.9:

Formula to calculate the Mean Absolute Deviation:

MAD=|ActualForecast|n

Calculation of the absolute error for year 1:

Absoluteerror=|Actual-Forecast|=|450410|=|40|=40

The absolute error for year 1 is the modulus of the difference between 450 and 410, which corresponds to 40. Therefore, the absolute error for year 1 is 40.

Calculation of the absolute error for year 2:

Absoluteerror=|Actual-Forecast|=|495446|=|49|=49

The absolute error for year 2 is the modulus of the difference between 495 and 446, which corresponds to 49. Therefore, the absolute error for year 2 is 49.

Calculation of the absolute error for year 3:

Absoluteerror=|Actual-Forecast|=|518490.1|=|27.9|=27.9

The absolute error for year 3 is the modulus of the difference between 518and490.1, which corresponds to 27.9. Therefore, the absolute error for year 3 is 27.9.

Calculation of the absolute error for year 4:

Absoluteerror=|Actual-Forecast|=|563515.21|=|47.79|=47.79

The absolute error for year 4 is the modulus of the difference between 563and515.21, which corresponds to 4.254. Therefore, the absolute error for year 4 is 47.79.

Calculation of the absolute error for year 5:

Absoluteerror=|Actual-Forecast|=|584558.221|=|25.779|=25.779

The absolute error for year 5 is the modulus of the difference between 584and558.221, which corresponds to 25.779. Therefore, the absolute error for year 5 is 25.779.

Calculation of the Mean Absolute Deviation using exponential smoothing:

MAD=|Actual-Forecast|n=40+49+27.9+47.79+25.7795=190.4695=38.093 (2)

Upon the substitution of summation value of absolute error for 5 years, that is, 190.469 is divided by the number of years. That is, 5 yields MAD of 38.093.

The forecast of sales using exponential smoothing with 0.9 as smoothing constant is 581.4221 and MAD is 38.093.

Forecast of sales using exponential smoothing with smoothing constant 0.3:

Given information:

Year Sales
1 450
2 495
3 518
4 563
5 584

Initial forecast for year 1=410Smoothingconstant=0.3

Formula to calculate the forecasted demand:

Ft=Ft-1+α(At-1-Ft-1)

Where,

Ft=newforecastFt-1=Previousperiod'sforecastα=smoothingconstantAt-1=PreviousperiodactualDemand

Smoothing constant=0.3
Year Sales Forecast Absolute error
1 450 410 40
2 495 422 73
3 518 443.9 74.1
4 563 466.13 96.87
5 584 495.191 88.809
6 521.8337
Total 372.779
MAD 74.5558

Excel worksheet:

Pearson eText Principles of Operations Management: Sustainability and Supply Chain Management -- Instant Access (Pearson+), Chapter 4, Problem 17P , additional homework tip  3

Calculation of the forecast for year 2:

F2=F1+α(A1-F1)=410+0.3(450410)=422

To calculate the forecast for year 2, substitute the value of forecast of year 1, smoothing constant and difference of actual and forecasted demand in the above formula. The result of the forecast for year 2 is 422.

Calculation of the forecast for year 3:

F3=F2+α(A2-F2)=422+0.3(495422)=443.9

To calculate the forecast for year 3, substitute the value of forecast of year 2, smoothing constant and difference of actual and forecasted demand in the above formula. The result of the forecast for year 3 is 443.9.

Calculation of the forecast for year 4:

F4=F3+α(A3-F3)=443.9+0.3(518443.9)=466.13

To calculate the forecast for year 4, substitute the value of forecast of year 3, smoothing constant and difference of actual and forecasted demand in the above formula. The result of the forecast for year 4 is 466.13.

Calculation of the forecast for year 5:

F5=F4+α(A4-F4)=466.13+0.3(563466.13)=495.191

To calculate the forecast for year 5, substitute the value of forecast of year 4, smoothing constant and difference of actual and forecasted demand in the above formula. The result of the forecast for year 5 is 495.191.

Calculation of the forecast for year 6:

F6=F5+α(A5-F5)=495.191+0.9(584495.191)=521.833

To calculate the forecast for year 6, substitute the value of forecast of year 5, smoothing constant and difference of actual and forecasted demand in the above formula. The result of the forecast for year 6 is 521.833.

Calculation of MAD using exponential smoothing with smoothing constant α=0.3:

Formula to calculate the Mean Absolute Deviation:

MAD=|Actual-Forecast|n

Calculation of the absolute error for year 1:

Absoluteerror=|Actual-Forecast|=|450410|=|40|=40

The absolute error for year 1 is the modulus of the difference between 450 and 410, which corresponds to 40. Therefore, the absolute error for year 1 is 40.

Calculation of the absolute error for year 2:

Absoluteerror=|Actual-Forecast|=|495422|=|73|=73

The absolute error for year 2 is the modulus of the difference between 495 and 422, which corresponds to 73. Therefore, the absolute error for year 2 is 73.

Calculation of the absolute error for year 3:

Absoluteerror=|Actual-Forecast|=|518443.9|=|74.1|=74.1

The absolute error for year 3 is the modulus of the difference between 518 and 443.9, which corresponds to 74.1. Therefore, the absolute error for year 3 is 74.1.

Calculation of the absolute error for year 4:

Absoluteerror=|Actual-Forecast|=|563466.13|=|96.87|=96.87

The absolute error for year 4 is the modulus of the difference between 563 and 466.13, which corresponds to 96.87. Therefore, the absolute error for year 4 is 96.87.

Calculation of the absolute error for year 5:

Absoluteerror=|Actual-Forecast|=|584495.191|=|88.809|=88.809

The absolute error for year 5 is the modulus of the difference between 584 and 495.191, which corresponds to 88.809. Therefore, the absolute error for year 5 is 88.809.

Calculation of the Mean Absolute Deviation using exponential smoothing with 0.3 as smoothing constant:

MAD=|Actual-Forecast|n=40+73+74.1+96.87+88.8095=372.7795=74.5558 (3)

Upon the substitution of summation value of absolute error for 5 years, that is, 372.779 are divided by the number of years. That is, 5 yields MAD of 74.5558.

The forecast of sales using exponential smoothing with 0.3 as smoothing constant is 521.833 and MAD is 74.5558.

Hence, on comparing MAD from exponential smoothing with smoothing constant 0.3, 0.6 and 0.9 (refer to equations (1), (2) and (3)), it can be inferred that MAD of exponential smoothing with smoothing constant is most accurate because of least MAD.

Want to see more full solutions like this?

Subscribe now to access step-by-step solutions to millions of textbook problems written by subject matter experts!
Students have asked these similar questions
Note: A waiting line model solver computer package is needed to answer these questions. The Kolkmeyer Manufacturing Company uses a group of six identical machines, each of which operates an average of 23 hours between breakdowns. With randomly occurring breakdowns, the Poisson probability distribution is used to describe the machine breakdown arrival process. One person from the maintenance department provides the single-server repair service for the six machines. Management is now considering adding two machines to its manufacturing operation. This addition will bring the number of machines to eight. The president of Kolkmeyer asked for a study of the need to add a second employee to the repair operation. The service rate for each individual assigned to the repair operation is 0.40 machines per hour. (a) Compute the operating characteristics if the company retains the single-employee repair operation. (Round your answers to four decimal places. Report time in hours.) La = L = Wa W = h…
Burger Dome sells hamburgers, cheeseburgers, french fries, soft drinks, and milk shakes, as well as a limited number of specialty items and dessert selections. Although Burger Dome would like to serve each customer immediately, at times more customers arrive than can be handled by the Burger Dome food service staff. Thus, customers wait in line to place and receive their orders. Burger Dome analyzed data on customer arrivals and concluded that the arrival rate is 40 customers per hour. Burger Dome also studied the order-filling process and found that a single employee can process an average of 56 customer orders per hour. Burger Dome is concerned that the methods currently used to serve customers are resulting in excessive waiting times and a possible loss of sales. Management wants to conduct a waiting line study to help determine the best approach to reduce waiting times and improve service. Suppose Burger Dome establishes two servers but arranges the restaurant layout so that an…
Agan Interior Design provides home and office decorating assistance to its customers. In normal operation, an average of 2.6 customers arrive each hour. One design consultant is available to answer customer questions and make product recommendations. The consultant averages 10 minutes with each customer. (a) Compute the operating characteristics of the customer waiting line, assuming Poisson arrivals and exponential service times. (Round your answers to four decimal places. Report time in hours.) λ= μ = = L = Wa W = P. W h (b) Service goals dictate that an arriving customer should not wait for service more than an average of 5 minutes. Is this goal being met? (Round your answer to one decimal place.) W₁ (in minutes) = min, which is ---Select--- than the desired wait time, so the goal ---Select--- met. What action do you recommend? (Select all that apply.) Hire another consultant. Increase the hours of operation. Decrease the mean service rate. Increase the mean service rate. There is…

Chapter 4 Solutions

Pearson eText Principles of Operations Management: Sustainability and Supply Chain Management -- Instant Access (Pearson+)

Ch. 4 - What is the primary difference between a...Ch. 4 - Define time series.Ch. 4 - What effect does the value of the smoothing...Ch. 4 - Explain the value of seasonal indices in...Ch. 4 - Prob. 14DQCh. 4 - In your own words, explain adaptive forecasting.Ch. 4 - Prob. 16DQCh. 4 - Explain, in your own words, the meaning of the...Ch. 4 - Prob. 18DQCh. 4 - Give examples of industries that are affected by...Ch. 4 - Prob. 20DQCh. 4 - Prob. 21DQCh. 4 - CEO John Goodale, at Southern Illinois Power and...Ch. 4 - The following gives the number of pints of type B...Ch. 4 - a) Plot the above data on a graph. Do you observe...Ch. 4 - Refer to Problem 4.2. Develop a forecast for years...Ch. 4 - A check-processing center uses exponential...Ch. 4 - The Carbondale Hospital is considering the...Ch. 4 - The monthly sales for Yazici Batteries, Inc., were...Ch. 4 - Prob. 7PCh. 4 - Daily high temperatures in St. Louis for the last...Ch. 4 - Lenovo uses the ZX-81 chip in some of its laptop...Ch. 4 - Data collected on the yearly registrations for a...Ch. 4 - Use exponential smoothing with a smoothing...Ch. 4 - Prob. 12PCh. 4 - At you can see in the following table, demand for...Ch. 4 - Prob. 14PCh. 4 - Refer to Solved Problem 4.1 on page 144. a) Use a...Ch. 4 - Prob. 16PCh. 4 - Prob. 17PCh. 4 - Prob. 18PCh. 4 - Income at the architectural firm Spraggins and...Ch. 4 - Resolve Problem 4.19 with = .1 and =.8. Using...Ch. 4 - Prob. 21PCh. 4 - Refer to Problem 4.21. Complete the trend-adjusted...Ch. 4 - Prob. 23PCh. 4 - The following gives the number of accidents that...Ch. 4 - In the past, Peter Kelles tire dealership in Baton...Ch. 4 - George Kyparisis owns a company that manufactures...Ch. 4 - Attendance at Orlandos newest Disneylike...Ch. 4 - Prob. 28PCh. 4 - The number of disk drives (in millions) made at a...Ch. 4 - Prob. 30PCh. 4 - Emergency calls to the 911 system of Durham, North...Ch. 4 - Using the 911 call data in Problem 4.31, forecast...Ch. 4 - Storrs Cycles has just started selling the new...Ch. 4 - Prob. 35PCh. 4 - Prob. 36PCh. 4 - Prob. 37PCh. 4 - Prob. 38PCh. 4 - Prob. 39PCh. 4 - Prob. 40PCh. 4 - Prob. 41PCh. 4 - Prob. 42PCh. 4 - Mark Gershon, owner of a musical instrument...Ch. 4 - Prob. 44PCh. 4 - Cafe Michigans manager, Gary Stark, suspects that...Ch. 4 - Prob. 46PCh. 4 - The number of auto accidents in Athens, Ohio, is...Ch. 4 - Rhonda Clark, a Slippery Rock, Pennsylvania, real...Ch. 4 - Accountants at the Tucson firm, Larry Youdelman,...Ch. 4 - Prob. 50PCh. 4 - Using the data in Problem 4.30, apply linear...Ch. 4 - Bus and subway ridership for the summer months in...Ch. 4 - Prob. 53PCh. 4 - Dave Fletcher, the general manager of North...Ch. 4 - Prob. 55PCh. 4 - Prob. 56PCh. 4 - Prob. 57PCh. 4 - Sales of tablet computers at Ted Glickmans...Ch. 4 - The following are monthly actual and forecast...Ch. 4 - Prob. 1CSCh. 4 - Prob. 2CSCh. 4 - Prob. 3CSCh. 4 - Prob. 1.1VCCh. 4 - Prob. 1.2VCCh. 4 - Using Perezs multiple-regression model, what would...Ch. 4 - Prob. 1.4VCCh. 4 - Prob. 2.1VCCh. 4 - Prob. 2.2VCCh. 4 - Prob. 2.3VCCh. 4 - Prob. 2.4VCCh. 4 - Prob. 2.5VC
Knowledge Booster
Background pattern image
Operations Management
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
  • Text book image
    Contemporary Marketing
    Marketing
    ISBN:9780357033777
    Author:Louis E. Boone, David L. Kurtz
    Publisher:Cengage Learning
    Text book image
    Marketing
    Marketing
    ISBN:9780357033791
    Author:Pride, William M
    Publisher:South Western Educational Publishing
    Text book image
    Practical Management Science
    Operations Management
    ISBN:9781337406659
    Author:WINSTON, Wayne L.
    Publisher:Cengage,
Text book image
Contemporary Marketing
Marketing
ISBN:9780357033777
Author:Louis E. Boone, David L. Kurtz
Publisher:Cengage Learning
Text book image
Marketing
Marketing
ISBN:9780357033791
Author:Pride, William M
Publisher:South Western Educational Publishing
Text book image
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Single Exponential Smoothing & Weighted Moving Average Time Series Forecasting; Author: Matt Macarty;https://www.youtube.com/watch?v=IjETktmL4Kg;License: Standard YouTube License, CC-BY
Introduction to Forecasting - with Examples; Author: Dr. Bharatendra Rai;https://www.youtube.com/watch?v=98K7AG32qv8;License: Standard Youtube License