Chapter 15, Problem 4P
a)
Summary Introduction
To determine: The optimal assignment of jobs to the given machine.
Introduction: The assignment method is one of the methods available in the process of optimization. Here, the jobs are assigned to every available resource.
b)
Summary Introduction
To determine: The total production of the assignments.
Introduction: The assignment method is one of the methods available in the process of optimization. Here, the jobs are assigned to every available resource.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Q. 3
What is the total makespan from Question 1?
Question 1: Four floral arranging jobs are to be carried out across three stations: A (Arrange), B (Bag), C (crop) shown. The station sequences and job times in minutes are shown below, along with the due dates for each job. Using an "earliest due date" job dispatching priority rule, which, if any, of the jobs in will be late?
Answer was Job 4
Group of answer choices
a. 100
b. 130
c. 150
d. 170
e. 200
QUESTION 5a. A Chef bakes and decorates cakes in a two-stage process. The cakes are baked and once cooledthey are then decorated based on the clients’ requirements. The Chef received seven orders forfully decorated cakes and has documented the orders with respective processing times for bakingand decorating, as shown in Table 7 that follows:.Table 7. Cake Job Orders received by the Chef with the respective processing times for Baking andDecoratingCake Job Order Baking Processing Time Decorating Processing TimeA 2 1B 8 5C 4 6D 9 7E 7 8F 9 6G 3 5
(ii) Illustrate the flow (throughput) times to complete the baking and decorating on atimeline chart.
QUESTION 5a. A Chef bakes and decorates cakes in a two-stage process. The cakes are baked and once cooledthey are then decorated based on the clients’ requirements. The Chef received seven orders forfully decorated cakes and has documented the orders with respective processing times for bakingand decorating, as shown in Table 7 that follows:.Table 7. Cake Job Orders received by the Chef with the respective processing times for Baking andDecoratingCake Job Order Baking Processing Time Decorating Processing TimeA 2 1B 8 5C 4 6D 9 7E 7 8F 9 6G 3 5
(i) Using Johnson’s Rule, determine the optimum sequence for processing the cake joborders through the baking and decorating stages.
Chapter 15 Solutions
Principles of Operations Management: Sustainability and Supply Chain Management (10th Edition)
Ch. 15 - Prob. 1EDCh. 15 - Prob. 1DQCh. 15 - Prob. 2DQCh. 15 - Prob. 3DQCh. 15 - Prob. 4DQCh. 15 - Prob. 5DQCh. 15 - Prob. 6DQCh. 15 - Prob. 7DQCh. 15 - Prob. 8DQCh. 15 - Prob. 9DQ
Ch. 15 - Prob. 10DQCh. 15 - Prob. 11DQCh. 15 - Prob. 12DQCh. 15 - Prob. 13DQCh. 15 - Prob. 1PCh. 15 - Prob. 2PCh. 15 - Prob. 3PCh. 15 - Prob. 4PCh. 15 - Prob. 5PCh. 15 - Prob. 6PCh. 15 - Prob. 7PCh. 15 - Prob. 8PCh. 15 - Prob. 9PCh. 15 - Prob. 10PCh. 15 - Prob. 15PCh. 15 - Prob. 16PCh. 15 - Prob. 17PCh. 15 - Prob. 18PCh. 15 - Prob. 19PCh. 15 - Prob. 20PCh. 15 - Prob. 21PCh. 15 - Prob. 22PCh. 15 - Prob. 23PCh. 15 - Daniels Barber Shop at Newark Airport is open 7...Ch. 15 - Given the following demand for waiters and...Ch. 15 - Prob. 1CSCh. 15 - Prob. 2CSCh. 15 - Prob. 3CSCh. 15 - Prob. 4CSCh. 15 - Prob. 1.1VCCh. 15 - Prob. 1.2VCCh. 15 - Prob. 1.3VCCh. 15 - Prob. 2.1VCCh. 15 - Prob. 2.2VCCh. 15 - Why is seniority important in scheduling servers?Ch. 15 - Prob. 2.4VC
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- Questionarrow_forwardQUESTION 6 The framing department has six jobs waiting to be processed as shown in Table 3 below. It is now time zero and all jobs are ready to begin. Each has only one operation remaining. Table 3 Jobs (In order of arrival) Processing Time Due Date A 5 12 B 7 18 C 8. 14 D 3 10 E 9 22 F 12 17 Using minimum flow time as the evaluation criterion, recommend the best rule to sequence the jobs from the list below: i. FCFS ii. SOT iii. EDD iv. STRarrow_forwardJob specifications state the minimum qualifications that applicants must possess to be considered for a job. Question 9 options: True Falsearrow_forward
- Question 6 Tasty Tim’s Tasty Tim’s is a specialty taco restaurant. The following tasks are required for the successful assembly of a Tasty taco (times are in seconds per taco): Chop and trim meat – 30 Chop vegetables – 20 Grill meat – 240 Grill vegetables – 180 Prepare toppings - Lettuce - 10 - Tomato - 15 - Guacamole - 40 Assemble taco - Add meat - 5 - Add vegetables - 5 - Add cheese - 5 - Add toppings - 10 Wrap taco - 20 During the lunch hour, Tasty Tim’s encounters demand for 120 tacos. During off-peak afternoon hours, demand at Tasty Tim’s drops to 40 tacos each hour. How many employees should Tim schedule to work during the afternoon? Again, ignore any effects of idle time or inefficiency due to poor line balancing.arrow_forwardQUESTION 2 Six processes are to be laid out in six areas in a company. The distance between adjacent work centres is 40 feet. The number of trips between work centres is given in the following table: FROM A B с D E F A TRIPS BETWEEN PROCESSES TO с 25 96 B 18 D 73 23 41 a) Assign the processes to the initial work areas and draw the total flow. E 12 31 22 19 F 54 45 20 57 48arrow_forward* Question Completion Status: QUESTION 7 The following is a simplex tableau: Basis Св 7.72X1 4.5X2 6.19X3 S1 S2 аз RHS X3 6.19 -1.25 1 -0.125 -0.75 12.5 S2 11.25 X1 7.72 1.25 1 -2.5 10.5 1 1 6. 6.19 -0.75 0.5 ? C-Z 0.75 -0.5 What is the value of Z QUESTION 8 Minimize z = 4.5x1 + 4.5x2 + 4.28x3 (hundreds of dollars) s.t: ?x1 + ?x2 + ?x3 > 140 (production capacity; hours)arrow_forward
- Last Question plsarrow_forwardQuestion 1- Week 31 Ola Ltd, which uses a job costing system, had two jobs in process at the start of the year: Job L1 ($68,000) and Job L2 ($30 000). The following information is available: i) The company applies manufacturing overhead on the basis of machine hours. Budgeted overhead and machine activity for the year were anticipated to be $1,000,000 and 25,000 hours, respectively. ii) The company worked on three jobs during the first quarter (i.e. from 1 January to 31 March). Direct materials used, direct labour incurred and machine hours consumed were as shown in the following table: Job numbers Direct material Direct labour Machine hours L1 $15,000 $30,000 900 L2 33,000 1,600 L3 45,000 65,000 2,000 ii) Manufacturing overhead incurred during the first quarter was $215,000. iv) Ola Ltd completed Job L1 and Job L2 during the first quarter. Job L2 was sold on credit, producing a profit of $30,000 for the company. Required: a) Calculate the company's predetermined overhead rate. b)…arrow_forwardquestion atatchedarrow_forward
- Question-1 A department has five employees with five jobs to be performed. The time in hours each man will take to perform each job is given in the effectiveness matrix. A B C D E I 10 3 10 7 7 II 5 9 7 11 9 III 13 18 2 9 10 IV 15 13 2 7 4 V 16 6 2 12 12 How should the jobs be allocated one per employee so as to minimize the total man-hours?arrow_forwardQUESTION TWO (a) The following tasks are to be completed on vehicles at a service station: To A B с D E F A 139 112 110 132 112 B 139 122 105 109 110 From C 112 122 117 126 108 D 110 105 117 134 111 E 132 109 126 134 118 F 112 110 108 111 118 She plans to start her journey from city A and to return back to this city after visiting all the cities without visiting any city more than once. i. Find the sequence of the cities for her visit programme for minimum total distance travelled. ii. What is the total distance travelled? (b) State the dual of the following and solve the same by the simplex method: Maximize Z=4x₂ + 2x₂ subject to 2x+3x₂ + 5x₂ 22, 3x₁ + x₂ +7x, ≤ 3, x₂ + 4x₂ + 6x₂ ≤5, x₁,x₂20,x, unrestrictedarrow_forwardWork teams usually do not have the authority to assign roles within the team. Question 2 options: True Falsearrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.