Principles of Operations Management: Sustainability and Supply Chain Management (10th Edition)
10th Edition
ISBN: 9780134181981
Author: Jay Heizer, Barry Render, Chuck Munson
Publisher: PEARSON
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 10, Problem 37P
Summary Introduction
To determine: The delay and
Introduction: Sample size refers to the number of observations that are necessary to determine the cycle time. The major goal of sample size is to determine inferences about the population from the observations.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Supervisor Tom Choi at Tempe Equipment Company is concerned that material is not arriving as promptly as needed at work cells. A new kanban system has been installed, but there seems to be some delay in getting the material moved to the work cells so that the job can begin promptly. Choi is interested in determining how much delay there is on the part of his highly paid machinists. Ideally, the delay would be close to zero. He has asked his assistant to determine the delay factor among his 10 work cells. The assistant collects the data on a random basis over the next 2 weeks and deter- mines that of the 1,200 observations, 105 were made while the oper- ators were waiting for materials. Use a 95% confidence level and a {3% acceptable error. What report does he give to Choi?
Supervisor Tom Choi at Tempe Equipment Companyis concerned that material is not arriving as promptly as needed atwork cells. A new kanban system has been insta lled, but there seemsto be some delay in getting the material moved to the work cells sothat the job can begin promptly. Choi is interested in determininghow much delay there is on the part of his highly paid machinists.Ideally, the delay would be close to zero. He has asked his assistantto determine the delay factor among his 10 work cells. The assistantcollects the data on a random basis over the next 2 weeks anddetermines that of the 1,200 observations, 105 were made while theoperators were waiting for materials. Use a 95% confidence leveland a ±3% acceptable error. What report does he give to Choi?
Drew Rosen Automation Company estimates the data entry and verifying times for four jobs as follows: In what order should the jobs be done if the company has one operator for each job? Illustrate the time-phased flow of this job sequence graphically.
Chapter 10 Solutions
Principles of Operations Management: Sustainability and Supply Chain Management (10th Edition)
Ch. 10 - Prob. 1EDCh. 10 - Prob. 1DQCh. 10 - Prob. 2DQCh. 10 - Prob. 3DQCh. 10 - Prob. 4DQCh. 10 - Prob. 5DQCh. 10 - Prob. 6DQCh. 10 - Prob. 7DQCh. 10 - Prob. 8DQCh. 10 - Prob. 9DQ
Ch. 10 - Prob. 10DQCh. 10 - Prob. 11DQCh. 10 - Prob. 12DQCh. 10 - Prob. 13DQCh. 10 - Prob. 14DQCh. 10 - Prob. 1PCh. 10 - Prob. 2PCh. 10 - Prob. 3PCh. 10 - Prob. 4PCh. 10 - Prob. 5PCh. 10 - Prob. 6PCh. 10 - Prob. 7PCh. 10 - Prob. 8PCh. 10 - Prob. 9PCh. 10 - Prob. 10PCh. 10 - Prob. 11PCh. 10 - Prob. 12PCh. 10 - Prob. 13PCh. 10 - Prob. 14PCh. 10 - Prob. 15PCh. 10 - Prob. 16PCh. 10 - Prob. 17PCh. 10 - Prob. 18PCh. 10 - Prob. 19PCh. 10 - Prob. 20PCh. 10 - Prob. 21PCh. 10 - Prob. 22PCh. 10 - Virginia College promotes a wide variety of...Ch. 10 - Prob. 24PCh. 10 - Prob. 25PCh. 10 - Prob. 26PCh. 10 - Prob. 27PCh. 10 - Prob. 28PCh. 10 - Prob. 29PCh. 10 - Prob. 30PCh. 10 - Prob. 31PCh. 10 - Prob. 32PCh. 10 - Prob. 33PCh. 10 - Prob. 34PCh. 10 - Prob. 35PCh. 10 - Prob. 36PCh. 10 - Prob. 37PCh. 10 - Prob. 38PCh. 10 - Prob. 1CSCh. 10 - Prob. 2CSCh. 10 - Prob. 3CSCh. 10 - Prob. 4CSCh. 10 - Prob. 1.1VCCh. 10 - Prob. 1.2VCCh. 10 - Prob. 1.3VCCh. 10 - Prob. 2.1VCCh. 10 - Prob. 2.2VCCh. 10 - Prob. 2.3VCCh. 10 - Prob. 2.4VC
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- local market research fim has just won a contract for several thousand small projects involving data gathering and statistical analysis. In the past, the firm has assigned each project to a single member of its highly trained professional staff. This person would both gather and analyze the data Using this approach, an experienced person can complete an average of 10 such projects in an eight-hour day. The firm's management is thinking of assigning two people to each project in order to allow them to specialize and become more efficient The process would require the data gatherer to fill out a matrix on the computer, check it and transmit it to the statistical analysis program for the analyst to complete. Data can be gathered on one project while the analysis is being completed on another, but the analysis must be complete before the statistical analysis program can accept the new data. After some practice, the new process can be completed with a standard time of 20 minutes…arrow_forwardOne of the chair lifts at a ski resort unloads 1,900 skiers per hour at the top of the slope. The ride from the bottom to the top takes 19 minutes. Instruction: Do not round your intermediate and round final answer to nearest integer. How many skiers are riding on the lift at any given time? 603 skiersarrow_forwardThe relationship between time and units in a process is called what?arrow_forward
- The normal time for a work cycle in a worker–machine system is 6.27 min. For setting the standard time, the PFD allowance factor is 12% and the machine allowance factor is 25%.The work cycle includes manual elements totaling a normal time of 5.92 min, all but 0.65 min of which are performed as internal elements. Determine (a) the standard time for the cycle and (b) the daily output at standard performance. (c) During an 8-hour shift, theworker lost 39 min due to personal time, rest breaks, and delays, and she produced 72 pieces. What was the worker’s pace on the operator-controlled portion of the shift?arrow_forwardFor the production of part R-193, two operations are being considered. The capital investment associated with each operation is identical. Operation 1 produces 2,100 parts per hour. After each hour, the tooling must be adjusted by the machine operator. This adjustment takes 15 minutes. The machine operator for Operation 1 is paid $24 per hour (this includes fringe benefits). Operation 2 produces 2,350 parts per hour, but the tooling needs to be adjusted by the operator only once every two hours. This adjustment takes 45 minutes. The machine operator for Operation 2 is paid $13 per hour (this includes fringe benefits). Assume an 8-hour workday. Further assume that all parts produced can be sold for $0.35 each. a. Should Operation 1 or Operation 2 be recommended? b. What is the basic tradeoff in this problem?arrow_forwardThe normal time for a work cycle in a worker-machine system is 6.0 min. For setting the standard time, the PFD allowance factor is 15%, and the machine allowance factor is 20%. The work cycle includes manual elements totaling a normal time of 5.5 min, all but 0.75 min of which are performed as internal elements. Determine (a) the daily output at standard performance. (b) During an 8-hour shift, the worker lost 20 min due to personal time, rest breaks, and delays, and she produced 80 pieces. What was the worker’s pace on the operator-controlled portion of the shift?arrow_forward
- Rocky’s Pre-Cast Shop is considering two different processes for completing Pre-Cast jobs. Process A uses one person to setup the job and do the pre-casting. If this approach is used, an experienced person can complete an average of 20 jobs per day. Process B uses two people. One person does the setup and the second person does the actual pre-casting. Setup on one job can be done while pre-casting is being completed on another but pre-casting must be completed on a job before the pre-cast machine can start processing the next. After some practice, this second process can be completed with a standard time of 10 minutes for setup and 15 minutes for actual pre-casting. In either case, assume an 8-hour day, 5 days per week, 250 days per year. 3. Assuming ideal conditions, what is the maximum capacity of process B? 4. How long would it take to process 200 jobs using process A (assume only one worker and one machine)? 5. If Rocky’s is primarily…arrow_forwardThe process for renewing a driver's license at the Archer County Courthouse is as follows. First, the clerk fills out the application; then the clerk takes the driver's picture; and finally, a typist enters the information into the computer system and processes the new license. It takes an average of 6 minutes to fill out an application, 1 minute to take a picture, and 8 minutes to process the new license. Due to county and state budget cuts, Archer County Courthouse now has only 3 clerks and 2 typists and expects to process 45 drivers/hour. What is the current labor utilization of each labor type? Do not round intermediate calculations. Round your answers to the nearest whole number. Labor utilization of clerks: (percentage) Labor utilization of typists: (percentage) The ability of the system is limited to (clerks, typists, or clerks & typists). How might the job and process design be improved? The best way to help alleviate this bottleneck is by using (better or worse) work…arrow_forwardPanini, a popular sandwich shop, offers 3 types of sandwiches: grilled vegetables, grilled chicken, and pastrami. Demand (sandwiches per hour) are Grilled Vegetables = 25, Grilled Chicken = 15, and Pastrami = 10. There are up to five steps in the process of making sandwiches, listed below with processing times. Step Grilled Vegetables Grilled Chicken Pastrami 0.75 minutes 0.75 minutes 0.75 minutes 0.75 minutes 1.4 minutes 1.4 minutes - - - - 3 minutes 3 minutes 2 minutes 2 minutes 2 minutes 2 minutes 0.5 minutes 0.5 minutes 0.5 minutes 0.5 minutes Only 50 percent of customers want their sandwich toasted, no matter which sandwich is ordered. Suppose Panini employs 1 worker at each step. Instructions: Round all answers to 1 decimal place. What is the implied utilization of each of the five steps in this process? Cut ____% Grill ____% Slice ____% Toast…arrow_forward
- We are analyzing the performance of four different machines, all subjected to the same workload. We have calculated the average Cycle Time (CT) and Work in Progress (WIP) for these machines. Which machine has the smallest effective variability? Machine 1: CT= 5 hours , WIP= 15 units Machine 2: CT= 10 hours , WIP= 30 units Machine 3: CT= 20 hours , WIP= 60 units Machine 4: CT= 40 hours , WIP= 120 unitsarrow_forwardThe process for renewing a driver's license at the Archer County Courthouse is as follows. First, the clerk fills out the application; then the clerk takes the driver's picture; and finally, a typist enters the information into the computer system and processes the new license. It takes an average of five minutes to fill out an application, two minutes to take a picture, and ten minutes to process the new license. Due to county and state budget cuts, Archer County Courthouse now has only two clerks and two typists and expects to process 45 drivers/hour. What is the current labor utilization of each labor type? Do not round intermediate calculations. Round your answers to the nearest whole number. Labor utilization of clerks: % Labor utilization of typists: Where is the bottleneck in this three-stage process? The ability of the system is limited to -Select- How might the job and process design be improved? The best way to help alleviate this bottleneck is by using -Select- work…arrow_forwardThe process for renewing a driver's license at the Archer County Courthouse is as follows. First, the clerk fills out the application; then the clerk takes the driver's picture; and finally, a typist enters the information into the computer system and processes the new license. It takes an average of five minutes to fill out an application, two minutes to take a picture, and ten minutes to process the new license. Due to county and state budget cuts, Archer County Courthouse now has only two clerks and two typists and expects to process 45 drivers/hour. What is the current labor utilization of each labor type? Do not round intermediate calculations. Round your answers to the nearest whole number.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.