a)
To determine: The normal time for the operation.
Introduction: The time study is the basis that helps set the standard time; it would time a sample of the performance of the worker.
a)
Answer to Problem 28P
The normal time is calculated as 77.8 minutes.
Explanation of Solution
Given information:
The observed time and performance rating for each element is given as follows:
Element | Performance rating | Observation (minutes) | ||||
1 | 2 | 3 | 4 | 5 | ||
Prepare daily reports | 120 | 35 | 40 | 33 | 42 | 39 |
Photocopy results | 110 | 12 | 10 | 36a | 15 | 13 |
Label and package reports | 90 | 3 | 3 | 5 | 5 | 4 |
Distribute reports | 85 | 15 | 18 | 21 | 17 | 45b |
a refers to the photocopying machine being broken
b refers to the delay in allowance factor
Formulae to calculate normal time:
Calculate normal time:
Element | Performance rating | Observation (minutes) | Average time | Normal time | ||||
1 | 2 | 3 | 4 | 5 | ||||
Prepare daily reports | 120% | 35 | 40 | 33 | 42 | 39 | 37.8 | 45.36 |
Photocopy results | 110% | 12 | 10 | 36a | 15 | 13 | 12.5 | 13.75 |
Label and package reports | 90% | 3 | 3 | 5 | 5 | 4 | 4 | 3.6 |
Distribute reports | 85% | 15 | 18 | 21 | 17 | 45b | 17.75 | 15.09 |
Calculate the average time to prepare daily reports:
The average time is calculated by taking an average of the observation given, which is a summation of 35, 40, 33, 42, and 39 and dividing the result by 5. Hence, the average is 37.8 minutes.
Calculate the average time to photocopy results:
The average time is calculated by taking an average of the observation given, which is a summation of 12, 10, 15, and 13 and dividing the result by 4. Hence, the average is 12.5 minutes.
Note: The observation with (Xa) should not be considered while calculating the average time.
Calculate the average time to label and package reports:
The average time is calculated by taking an average of the observation given, which is a summation of 3, 3, 5, 5, and 4 and dividing the result by 5. Hence, the average is 4 minutes.
Calculate the average time to distribute reports:
The average time is calculated by taking an average of the observation given, which is a summation of 15, 18, 21, and 17 and dividing the result by 4. Hence, the average is 17.75 minutes.
Note: The observation with (Xb) should not be considered while calculating the average time.
Calculate the normal time to prepare daily reports:
The normal time is calculated by multiplying average time and performance rating. The average time is calculated as 37.8 minutes, and performance rating is given as 120%. Hence, the normal time is 45.36 minutes.
Calculate the normal time to photocopy results:
The normal time is calculated by multiplying average time and performance rating. The average time is calculated as 12.50 minutes, and performance rating is given as 110%. Hence, the normal time is 13.75 minutes.
Calculate the normal time to label and package reports:
The normal time is calculated by multiplying average time and performance rating. The average time is calculated as 4.0 minutes, and performance rating is given as 90%. Hence, the normal time is 3.6 minutes.
Calculate the normal time to distribute reports:
The normal time is calculated by multiplying average time and performance rating. The average time is calculated as 17.75 minutes, and performance rating is given as 85%. Hence, the normal time is 15.09 minutes.
Calculate the total normal time:
The normal time is calculated by adding the normal time to prepare daily reports, photocopy results, label and package reports, and distribute reports.
Hence, the total normal time is 77.8 minutes.
b)
To determine: The standard time for the operation.
Introduction: Time study is the basis that helps set the standard time; it would time a sample of the performance of the worker.
b)
Answer to Problem 28P
Thestandard time is calculated as 91.53 minutes.
Explanation of Solution
Given information:
The allowance is given as 15%. The observed time and performance rating for each element is given as follows:
Element | Performance rating | Observation (minutes) | ||||
1 | 2 | 3 | 4 | 5 | ||
Prepare daily reports | 120 | 35 | 40 | 33 | 42 | 39 |
Photocopy results | 110 | 12 | 10 | 36a | 15 | 13 |
Label and package reports | 90 | 3 | 3 | 5 | 5 | 4 |
Distribute reports | 85 | 15 | 18 | 21 | 17 | 45b |
a refers to the photocopying machine being broken
b refers to the delay in allowance factor
Formula to calculate standard time:
Calculate standard time:
The standard time is calculated by dividing the normal time with the value attained by subtracting the allowance factor from 1. Normal time is calculated as 77.8 minutes and allowance factor is calculated as 15%
Hence, standard time is 91.53 minutes.
c)
To determine: The number of the
Introduction: The sample size is required to determine the number of observations that are necessary to find the true cycle time.
c)
Answer to Problem 28P
The sample size to prepare reports is 15, to photocopy results is 44, label, and package reports is 96, and to distribute reports is 31 samples.
Explanation of Solution
Given information:
The confidence level is 95% and accuracy is ±5%.
Element | Performance rating | Observation (minutes) | ||||
1 | 2 | 3 | 4 | 5 | ||
Prepare daily reports | 120 | 35 | 40 | 33 | 42 | 39 |
Photocopy results | 110 | 12 | 10 | 36a | 15 | 13 |
Label and package reports | 90 | 3 | 3 | 5 | 5 | 4 |
Distribute reports | 85 | 15 | 18 | 21 | 17 | 45b |
Formula to determine the required number of observation:
n refers to the number of observations required
z refers to the table value for the confidence level
s refers to the standard deviation
h refers to an accuracy level
x(bar) refers to the average observed time
Determine a proper number of observation required:
Element | Mean observed time | s | Sample |
Prepare daily reports | 37.8 | 3.7 | 15 |
Photocopy results | 12.5 | 2.1 | 44 |
Label and package reports | 4 | 1 | 96 |
Distribute reports | 17.75 | 2.5 | 31 |
Calculate the standard deviation to prepare daily reports:
The standard deviation can be calculated by dividing two values. The first value can be calculated by adding the square of the value attained by subtracting the mean observed value from each observation. The second value can be attained by subtracting 1 from the number of samples and the results should be square rooted. The standard deviation to prepare the daily report is 3.7.
Calculate the standard deviation to photocopy results:
The standard deviation can be calculated by dividing two values. The first value can be calculated by adding the square of the value attained by subtracting the mean observed value from each observation. The second value can be attained by subtracting 1 from the number of samples and the results should be square rooted. The standard deviation to photocopy results is 2.1.
Calculate the standard deviation to label and package reports:
The standard deviation can be calculated by dividing two values. The first value can be calculated by adding the square of the value attained by subtracting the mean observed value from each observation. The second value can be attained by subtracting 1 from the number of samples and the results should be square rooted. The standard deviation to label and package reports is 1.
Calculate the standard deviation to distribute reports:
The standard deviation can be calculated by dividing two values. The first value can be calculated by adding the square of the value attained by subtracting the mean observed value from each observation. The second value can be attained by subtracting 1 from the number of samples and the results should be square rooted. The standard deviation to distribute reports is 2.5.
Calculate the sample size to prepare daily reports:
It is calculated by multiplying the z value of 1.96, the standard deviation that is given as 3.7, and dividing the result with the multiple of the accuracy level and average observed time that is given as 0.05 and 37.8, respectively. Hence, the required number of observations is 15 samples.
Calculate the sample size to photocopy results:
It is calculated by multiplying the z value of 1.96, the standard deviation that is given as 2.1, and dividing the result with the multiple of the accuracy level and average observed time that is given as 0.05 and 12.5, respectively. Hence, the required number of observations is 44 samples.
Calculate the sample size to label and package reports:
It is calculated by multiplying the z value of 1.96, the standard deviation that is given as 1, and dividing the result with the multiple of the accuracy level and average observed time that is given as 0.05 and 4, respectively. Hence, the required number of observations is 96 samples.
Calculate the sample size to distribute reports:
It is calculated by multiplying the z value of 1.96, the standard deviation that is given as 2.5, and dividing the result with the multiple of the accuracy level and average observed time that is given as 0.05 and 17.75, respectively. Hence, the required number of observations is 31 samples.
Hence, the normal time for the process is 77.8 minutes and standard time for the process is 91.53 minutes. The sample size to prepare reports is 15, to photocopy results is 44, label and package reports are 96, and to distribute reports is 31 samples.
Want to see more full solutions like this?
Chapter 10 Solutions
Principles Of Operations Management
- This area of emotional intelligence describes your ability to not only understand your strengths and weaknesses but to recognize your emotions and their effect on you and your team’s performance self management self awareness relationship management social awarenessarrow_forwardEmotional intelligence is defined as the ability to understand and manage your emotions, as well as recognize and influence the emotions of those around you. True Falsearrow_forwardAt the Ford automobile Highland plant, assume the one-millionth vehicle was produced in 1916 at a cost of $8084 (in 2013 US$), by how much did the Ford company reduce his cost with each doubling of cumulative output from 1916 to 1927?arrow_forward
- At the Ford automobile Highland plant,in 1913, how long did the average worker stay with the plant and what was the average tenure of a worker?arrow_forwardCommunity Federal Bank in Dothan, Alabama, recently increased its fees to customers who use employees as tellers. Management is interested in whether its new tee policy has increased the number of customers now using its automatic teller machines to that point that more machines are required. The following table provides the number of automatic teller transactions by week. Use trend projection with regression to forecast usage for weeks 13-16.arrow_forwardDavison Electronics manufactures three LED television monitors, identified as Model A, Model B, and Model C. Davison Electronics four manufacturing plants. Each model has its lowest possible production cost when produced at Plant 1. However, Plant 1 does not have the capacity to handle the total production of all three models. As a result, at least some of the production must be routed to the other manufacturing plants. The following table shows the minimum production requirements for next month, the plant capacities in units per month, and the production cost per unit at each plant: Model Production Cost per Unit Minimum Production Requirements Plant 1 Plant 2 Plant 3 Plant 4 A $25 $28 $37 $34 48,000 B $26 $35 $36 $41 75,000 C $20 $31 $26 $23 60,000 Production Capacity 65,000 50,000 32,000 43,000 Davison’s objective is to determine the cost-minimizing production planarrow_forward
- Anecdotally, entrepreneurs frequently encounter two critical dilemmas in managing human resources: the timing of hiring and the decision regarding hiring a generalist versus a specialist for their growing venture. Deciding when to expand a team is crucial, as premature hiring (i.e., hiring too soon) can strain resources, while delayed hiring (i.e., hiring too late) might hinder growth opportunities. Moreover, the choice between hiring a generalist or a specialist depends on the specific needs and stage of the venture, with each option presenting distinct advantages and challenges. To address these issues, a management scholar seeks to identify the factors shaping the hiring cycle throughout the entrepreneurial journey and to understand the criteria for choosing between generalists and specialists at various stages of a venture. The scholar has assembled a sample of 20 experienced South African entrepreneurs who have encountered both failure and success in the financial technology…arrow_forward3. [25 pts.] Four projects are available for investment. The projects require the cash flows and yield the net present values (NPV) (in millions) shown in the following table. Project id. 1 2 Cash outflow at time 0 (million Lira) 8 8 NPV (million Lira) 12 11 3 4 6 5 8 6 If 20 million Lira is available for investment at time 0, find the investment plan that maximizes NPV. All investments are required to be 0 or 1 (fractional investment values are not permitted). a. Formulate the mathematical model. (Write the decision variables, objective function and the constraints.) [10 pts.] b. Find the optimal solution by using Branch and Bound method (Draw the branch and bound tree clearly, write also lower bounds(LB)) (Left branches x=0, right branches x =1) [15 pts.].arrow_forwardexamine the production concept and operations management, what are the key steps required to achieve success? Be specific in your response.arrow_forward
- Produce a 3000 report with references on one international organization of your choice and Address the following: Provide a brief introduction of the organisation and sector it operates in, including its mission and vision statements, its core values, a summary of its financial performance and a general overview of the business’s operational activities. From the relevant literature explain the Total Quality Management (TQM) processes the chosen organization follows and identify one quality challenge/issue that the organization faced or is currently facing. Explain how the organization managed/or still managing the particular quality challenge/issue. Critically analyze whether the organization failed or succeeded in achieving and maintaining quality performance. Provide a few critical recommendations for business managers in order to highlight the importance of Total Quality Management (TQM) within an organization.arrow_forward問題2 Production system design involves determining the arrangement of workstations and the... O allocation of resources to workstations design of the process O production schedule all of the abovearrow_forwardElaborate on the need for and the benefits of an effective supply chain management (SCM) system in the context of a globalized and networked economy. In your answer, explain how organizations like Dell and Hewlett-Packard leverage supply chain networks to maintain competitiveness, and analyse the impact of globalization, technological advancements, and business environment changes on supply chain structures. Additionally, evaluate the key components of SCM, including distribution network configuration, inventory management, and cash-flow management, and discuss how these components contribute to creating an effective and integrated supply chain. (15) 3.2. Critically evaluate the requirements for effective inventory management within an organization. In your answer, discuss the importance of inventory accounting systems, the role of cost information (holding, ordering, and shortage costs), and the significance of classification systems like ABC analysis. Additionally, analyse how…arrow_forward
- Foundations of Business (MindTap Course List)MarketingISBN:9781337386920Author:William M. Pride, Robert J. Hughes, Jack R. KapoorPublisher:Cengage LearningFoundations of Business - Standalone book (MindTa...MarketingISBN:9781285193946Author:William M. Pride, Robert J. Hughes, Jack R. KapoorPublisher:Cengage Learning
- Understanding Management (MindTap Course List)ManagementISBN:9781305502215Author:Richard L. Daft, Dorothy MarcicPublisher:Cengage Learning