Chapter 10, Problem 19P
a
Summary Introduction
Interpretation:
Concept Introduction:
The first-come, first-served (FCFS) rule gives the job arriving at the workstation first the highest priority.
The earliest due date (EDD) rule gives the job with the earliest due date based on assigned due dates the highest priority.
b
Summary Introduction
To determine:
Performance of the two rules.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
A process improvement team is working to improve the production output at the Johnson Manufacturing plant’sHeader Cell that manufactures a key component, headers, used in commercial air conditioners. A header is partof the circulatory system of a commercial air conditioner that moves coolant between various components suchas the evaporator coil and the condenser coil. Currently, the header production cell is scheduled separately fromthe main work in the plant. Often, individual headers are not sequenced to match the product they go into on thefinal assembly line in a timely fashion, and so the product can sit in queue waiting for a header
Currently a company that designs Web sites has five customers in its backlog. The time since the order arrived, processing time, and promised due dates are given in the following table. The customers are ready to be scheduled today, which is the start of day 190.
Customer
Time Since
Order Arrived
(days ago)
Processing
Time (days)
Due Date
(days from
now)
Upper AA
6
18
66
Upper BB
3
24
58
Upper CC
2
32
100
Upper DD
10
22
26
Upper EE
8
12
50
a. Develop separate schedules by using the FCFS and EDD rules. Compare the schedules on the basis of average flow time and average days past due.
Part 2
Using the FCFS (first come, first served) decision rule for sequencing the customers, the order is:
Sequence
1
2
3
4
5
Customer
D
E
A
B
C
Part 3
Using…
Mike’s Auto Body Shop has five cars waiting to be repaired. The shop is quite small, so only one car can be repaired at a time. The number of days required to repair each car and the promised date for each are given in the following table. (given)
Mike has agreed to provide a rental car to each customer whose car is not repaired on time. Compare the performance of the four sequencing rules FCFS, SPT, EDD, and CR relative to minimizing average tardiness.
Chapter 10 Solutions
Operations Management: Processes and Supply Chains (11th Edition)
Ch. 10 - List the types of costs incurred when employees...Ch. 10 - Prob. 2DQCh. 10 - Prob. 3DQCh. 10 - Explain why management should be concerned about...Ch. 10 - The Barberton Municipal Division of Road...Ch. 10 - Bob Canton’s golf camp estimates the following...Ch. 10 - Prob. 3PCh. 10 - Prob. 4PCh. 10 - Management at the Kerby Corporation has determined...Ch. 10 - Gretchen’s Kitchen is a fast-food restaurant...
Ch. 10 - Prob. 7PCh. 10 - Tax Prep Advisers, Inc. has forecasted the...Ch. 10 - Climate Control, Inc. makes expedition-quality...Ch. 10 - Prob. 11PCh. 10 - Gemini Inc. is using the Sales and Operations...Ch. 10 - Gerald Glynn manages the Michaels Distribution...Ch. 10 - Cara Ryder manages a ski school in a large resort...Ch. 10 - Prob. 15PCh. 10 - Prob. 17PCh. 10 - The Hickory Company manufactures wooden desks....Ch. 10 - Prob. 19PCh. 10 - The Mowry Machine Shop still has five jobs to be...Ch. 10 - If we use the same number of workers in each...Ch. 10 - Prob. 2AMECh. 10 - Prob. 3AMECh. 10 - Suppose the overtime cost is $3,300. What happens...Ch. 10 - Suppose the undertime cost is the same as the...Ch. 10 - Prob. 6AMECh. 10 - Prob. 1VCCh. 10 - Does Starwood employ a chase, level, or mixed...Ch. 10 - How would staffing for the opening of a new hotel...Ch. 10 - Explain the alternatives available to Darlene Fry...Ch. 10 - Prob. 2C
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- Jack's Refrigeration Repair Service repairs and reconditions commercial icemakers at restaurants. Jack has four jobs to complete. Below are their processing times and due dates: Job Processing time (hours) Due date (hour) A 20 50 B 10 40 C 15 35 D 55 75 What is the average inventory if jobs are processed using the earliest due date rule?arrow_forwardUsing the FCFS rule for scheduling, the sequence is Sunny Park Tailors has been asked to make three different types of wedding suits for separate customers. The table below highlights the time taken in hours for cutting and sewing (process 1) and delivery (process 2) of each of the suits Times Taken for Different Activities (hours) Cut and Sew Suit 1 2 3 7 4 5 Deliver 2 3 6 Assume that orders for suits have been listed in the above table in the order in which they were received. Carrow_forwardCurrently a company that designs Web sites has five customers in its backlog. The day when the order arrived, processing time, and promised due dates are given in the following table. The customers are listed in the order of when they arrived. They are ready to be scheduled today, which is the start of day 190. Customer Time SinceOrder Arrived(days ago) ProcessingTime (days) Due Date(days fromnow) A B C D E 10 8 6 3 2 20 12 28 24 32 26 50 66 58 100 a. Develop separate schedules by using the FCFS and EDD rules. Compare the schedules on the basis of average flow time and average days past due.b. Comment on the performance of the two rules relative to these measures. Which one gives the best schedule? Why?arrow_forward
- Jane Reed bakes breads and cakes in her home for parties and other affairs on a contract basis. Jane has only one oven for baking. One particular Monday morning she finds that she has agreed to complete five jobs for that day. Her husband John will make the deliveries, which require about 15 minutes each. Suppose that she begins baking at 8:00 A.M. (given) Determine the sequence in which she should perform the jobs in order tominimizea. Mean flow time.b. Number of tardy jobs.c. Maximum lateness.arrow_forwardThe Neptune’s Den Machine Shop specializes in overhauling outboard marine engines. Some engines require replacement of broken parts, whereas others need a complete overhaul. Currently, five engines with varying problems are awaiting service. The best estimates for the labor times involved and the promise dates (in number of days from today) are shown in the following table. Customers usually do not pick up their engines early.Engine Time Since Order Arrived (days) Processing Time, Including Setup (days) Promise Date (days from now) Engine Time Since OrderArrived (days) Processing Time,Including Setup (days) Promise Date (daysfrom now) 50-hp Evinrude 7-hp Johnson 100-hp Mercury 50-hp Honda 75-hp Nautique 4 6 8 1 15 5 4 10 1 3 8 15 12 20 10 a. Develop separate schedules by using the SPT and EDD rules.b. Compare the two schedules on the basis of average flow time, percentage of past due jobs, and maximum past due days for any engine.arrow_forwardCurrently a company that designs Web sites has five customers in its backlog. The time since the order arrived, processing time, and promised due dates are given in the following table. The customers are ready to be scheduled today, which is the start of day 190. Question Viewer Time Since Order Arrived Customer (days ago) Processing Time (days) Due Date (days from now) A 3 B 2 C 10 D E 8 6 22228 24 32 58 100 20 26 12 50 66 a. Develop separate schedules by using the FCFS and EDD rules. Compare the schedules on the basis of average flow time and average days past due. Using the FCFS (first come, first served) decision rule for sequencing the customers, the order is: Sequence 1 2 3 4 5 Customer C D E A B Using the EDD (earliest due date) decision rule for sequencing the customers, the order is (to resolve a tie, use the order in which the jobs were received): Sequence 1 2 3 4 5 Customer C D A E B The average flow time and average days past due for each option are: (Enter your responses…arrow_forward
- In a variety of test criteria, the SOT rule contains the best solution. Should the SOT rule be used as a priority rule by a bank's manager? What is the reason for this?arrow_forwardA new surgical facility called Cut & Sew has opened in the United States. The branches of the facility are spread throughout the country. These are job shops that handle a variety of outpatient surgical procedures. The process of the facility is set up in a way that one doctor will cut and another will sew. The data regarding the patients and the estimated time for cutting and sewing for each patient are given in the following table. Using Johnson's sequencing rule, the final sequence of the patients is - Patient Cut Time (hours) Sew Time (hours) A 2.3 2.8 2.5 IC 2 1.5 D 0.6 1 E 3.6 2.6 a) С-А-В-Е-D b) B-E-A-C-D c) D-A-B-E-C d) A-B-C-D-Earrow_forwardDifferentiate between the general time table and the specifictime tablearrow_forward
- How do standard circular flow and expanded circular flow differ?arrow_forwardNeed a,b,c Options for b and carrow_forwardPanini, a popular sandwich shop, offers 3 types of sandwiches: grilled vegetables, grilled chicken, and pastrami. The table below provides demand data: Grilled Vegetables Grilled Chicken Pastrami Demand per hour 25 9 12 There are up to five steps in the process of making sandwiches listed below with activity times (if no activity time, then than step is not done for that sandwich). Only 50% of customers want their sandwich toasted, no matter which sandwich is ordered. Step Grilled Vegetables(in minutes) Grilled Chicken(in minutes) Pastrami(in minutes) Cut bread 1 1 1 Grill 1.2 1.2 Slice meat 2 Toast 1.2 1.2 1.2 Wrap 0.8 0.8 0.8 Suppose Panini employs 1 worker at each step. a) Does Panini have enough capacity to fulfill the current demand for sandwiches? (b) What is the current capacity cushion for Panini? (as a %) c) If demand for Pastramis increase with the percentage indicated below, how much additional workers should Panini hire (if any), and where…arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Inventory Management | Concepts, Examples and Solved Problems; Author: Dr. Bharatendra Rai;https://www.youtube.com/watch?v=2n9NLZTIlz8;License: Standard YouTube License, CC-BY