Chapter 10, Problem 12DQ
Summary Introduction
To determine: The manner in which the time of a drill operator is calculated who is idle for some time at the commencement of every job; waiting for the set-up worker to finish the setup.
Introduction: Waiting time is a term used in cost accounting that refers to the amount of time a job task is being idle before the order is processed or the machine is setup. Waiting time affects both the producer and the consumer.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
What are the significance of job rotation in details
The first day of basic training at the Air Force Academy is quite a sight, with 1500 cadets being processed in. This involves getting haircuts, uniforms, room assignments, and a mountain of paperwork. At the Uniform Fitting station, the worker takes the measurements on the cadet (which takes about 2 minutes), then retrieves shirts, pants and hats in his/her size (which takes about 2 minutes), waits for the cadet to try on the pants (which takes about 1 minute) and then marks the pants for hemming (which takes about 1 minute). The in-processing takes place from 8 AM to 5 PM with an hour off for lunch (8 hours).
__________2a. How many cadets can a single worker fit for uniforms on that hectic day?
__________2b. How many workers would be needed to fit 1601 cadets in one day, if everyone works at full capacity?
The normal time for a work cycle in a worker–machine system is 6.27 min. For setting the standard time, the PFD allowance factor is 12% and the machine allowance factor is 25%.The work cycle includes manual elements totaling a normal time of 5.92 min, all but 0.65 min of which are performed as internal elements. Determine (a) the standard time for the cycle and (b) the daily output at standard performance. (c) During an 8-hour shift, theworker lost 39 min due to personal time, rest breaks, and delays, and she produced 72 pieces. What was the worker’s pace on the operator-controlled portion of the shift?
Chapter 10 Solutions
EP PRIN.OF OPERATIONS MGMT.-MYOMLAB
Ch. 10 - Prob. 1EDCh. 10 - Prob. 1DQCh. 10 - Prob. 2DQCh. 10 - Prob. 3DQCh. 10 - Prob. 4DQCh. 10 - Prob. 5DQCh. 10 - Prob. 6DQCh. 10 - Prob. 7DQCh. 10 - Prob. 8DQCh. 10 - Prob. 9DQ
Ch. 10 - Prob. 10DQCh. 10 - Prob. 11DQCh. 10 - Prob. 12DQCh. 10 - Prob. 13DQCh. 10 - Prob. 14DQCh. 10 - Prob. 1PCh. 10 - Prob. 2PCh. 10 - Prob. 3PCh. 10 - Prob. 4PCh. 10 - Prob. 5PCh. 10 - Prob. 6PCh. 10 - Prob. 7PCh. 10 - Prob. 8PCh. 10 - Prob. 9PCh. 10 - Prob. 10PCh. 10 - Prob. 11PCh. 10 - Prob. 12PCh. 10 - Prob. 13PCh. 10 - Prob. 14PCh. 10 - Prob. 15PCh. 10 - Prob. 16PCh. 10 - Prob. 17PCh. 10 - Prob. 18PCh. 10 - Prob. 19PCh. 10 - Prob. 20PCh. 10 - Prob. 21PCh. 10 - Prob. 22PCh. 10 - Virginia College promotes a wide variety of...Ch. 10 - Prob. 24PCh. 10 - Prob. 25PCh. 10 - Prob. 26PCh. 10 - Prob. 27PCh. 10 - Prob. 28PCh. 10 - Prob. 29PCh. 10 - Prob. 30PCh. 10 - Prob. 31PCh. 10 - Prob. 32PCh. 10 - Prob. 33PCh. 10 - Prob. 34PCh. 10 - Prob. 35PCh. 10 - Prob. 36PCh. 10 - Prob. 37PCh. 10 - Prob. 38PCh. 10 - Prob. 1CSCh. 10 - Prob. 2CSCh. 10 - Prob. 3CSCh. 10 - Prob. 4CSCh. 10 - Prob. 1.1VCCh. 10 - Prob. 1.2VCCh. 10 - Prob. 1.3VCCh. 10 - Prob. 2.1VCCh. 10 - Prob. 2.2VCCh. 10 - Prob. 2.3VCCh. 10 - Prob. 2.4VC
Knowledge Booster
Similar questions
- Drew Rosen Automation Company estimates the data entry and verifying times for four jobs as follows: In what order should the jobs be done if the company has one operator for each job? Illustrate the time-phased flow of this job sequence graphically.arrow_forwardc) Time required for the fifth unit = ? hours (round your response to the nearest whole number).arrow_forwardInfographic slide on if cell phone battery A or cell phone battery B lasts 11 hours with continuous usearrow_forward
- Frank’s Fabricators has collected the following information to develop a standard time for producing their high-volume Navigator III, a universal remote control. All of the times are in minutes. Element (in Minutes) Observations 1 2 3 4 5 6 Cycle 1 1.15 3.07 0.94 1.31 1.49 1.82 Cycle 2 1.13 0.91 1.42 1.70 1.81 Cycle 3 1.17 3.23 0.85 1.26 1.58 1.82 Cycle 4 1.19 0.93 1.37 1.54 1.80 Cycle 5 1.09 3.16 0.93 1.40 1.65 1.83 Cycle 6 1.14 1.01 1.44 1.63 1.88 Rating Factor 1.15 1.20 1.10 1.20 1.15 1.30 Frequency 1.00 0.50 1.0 1.0 1.0 1.0 (a) Calculate the mean observed time for each element. (Round your answers to 3 decimal places, e.g.,5.123.) Element Mean Observed Time 1 1.145 2 1.577 3 0.928 4 1.367 5 1.598 6 1.827 eTextbook and Media Solution Attempts: 3 of 3 used (b) Calculate the normal time…arrow_forwardEsc Hg Time: 1 hour, 51 minutes, 08 seconds. * Question Completion Status: 1 2 3 4 5 6 7 8 9 10 12 13 14 15 16 17 18 31 32 19 20 21 22 23 24 25 26 28 29 30 A Moving to another question will save this response. Question 16 of 32 Question 16 1 points Save Answer CASE: The correct implementation of new product development process helps minimize the risk of product failure. When Netflix wanted ideas for improving the accuracy of its Cinematch online recommendation system, it decided to "open it up to the world," promising a $1 million prize for the best solution. QUESTION: Identify the idea generation tool used by Netflix in this example. *** For the toolbar, press ALT+F10 (PC) or ALT+FN+F10 (Mac). BIUS Paragraph V AV V Ix V L %0 V System Font V 12pt 8 C FS BI A+ F3 B ! 1 F1 @ F2 F4 2 TW 11 الالالال ER F6 T 6 F7 Y & 17 F8 * U 8 F9 ( F10 9 27 - F11 0 POWERED BY TINY PriSc F12 P 1 Insearrow_forwardcompany from your understanding. 3) Calculate the standard time for an operation from the following data. Average observed time for manual elements = 4 0 minutes Average auto cycle time = 3 minutes Rating on a scale of 100 = 90% Personal & other allowances = 15% of basic timearrow_forward
- 28.May I know the correct option?arrow_forward6. At ASP Micro Manufacturing, Inc. workers press semiconductor into predrilled slots on printed- circuit boards. Determine the normal time of the operation in seconds. The elemental motions for normal time used by the company are as follows: • Reach 6 inches for semiconductors • Grasp the semiconductors • Move semiconductor to printed-circuit board 10.5 TMU 8.0 TMU 9.5 TMU Position semiconductor 20.1 TMU Press semiconductor into slots 20.3 TMU • Move board aside 15.8 TMUarrow_forwardWhat will be the takt time for single 8 hour working shift including 1 hour lunch break for customer demand of 480 units per day? a. 58.4 seconds b. 53.5 seconds c. 1 minute d. 52.5 secondsarrow_forward
- subject: Software Process and Management Book : Software Process Definition and Management [J€urgen M€unch • Ove Armbrust • Martin Kowalczyk • Mart ́ın Soto] Question : Describe two typical problems that may occur while deploying a prescriptive process model. For each of these problems, discuss potential strategies for overcoming it.arrow_forwardwhat are the advantages and disadvantages of continuous and snapback method of time study.arrow_forwardA recently negotiated union contract allows workers in a shipping department 24 minutes for rest, 10 minutes for personal time, and 14 minutes for delays for each four hours worked. A time study analyst observed a job that is performed continuously and found an average time of 6.0 minutes percycle for a worker she rated at 95 percent. What standard time is applicable for that operation?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.