Industrial Designs has been awarded a contract to design a label for a new wine produced by Lake View Winery. The company estimates that 150 hours will be required to complete the project. The firm's three graphic designers available for assignment to this project are Lisa, a senior designer and team leader; David, a senior designer; and Sarah, a junior designer. Because Lisa has worked on several projects for Lake View Winery, management specified that Lisa must be assigned at least 40% of the total number of hours assigned to the two senior designers. To provide label designing experience for Sarah, the junior designer must be assigned at least 15% of the total project time. However, the number of hours assigned to Sarah must not exceed 25% of the total number of hours assigned to the two senior designers. Due to other project commitments, Lisa has a maximum of 50 hours available to work on this project. Hourly wage rates are $30 for Lisa, $11 for David, and $18 for Sarah. (a) Formulate a linear program that can be used to determine the number of hours each graphic designer should e assigned to the project to minimize total cost. If an amount is zero, enter "0". If the constant is "1" it must be entered in the box. For negative numbers use a minus sign (Example: enter -100). Let L = number of hours assigned to Lisa D = number of hours assigned to David S = number of hours assigned to Sarah L+ $ D + $ S Min $ s.t. L + D + S≥ Minimum Lisa L D + S≥ Minimum Sarah D + S Maximum Lisa L + D + S S Maximum Sarah L D S= Total Time L, D, S 20 (b) How many hours should be assigned to each graphic designer? Hours Assigned Lisa David Sarah What is the total cost? If required, round your answer to a whole dollar amount. $ (c) Suppose Lisa could be assigned more than 50 hours. What effect would this have on the optimal solution? Explain. If an amount is zero, enter "0". We know that the shadow price for this constraint is , since the constraint is -Select your answer - V .Therefore, additional hours for Lisa will - Select your answer the solution. (d) If Sarah were not required to work a minimum number of hours on this project, would the optimal solution change? -Select your answer Explain. There Select your answer- lower limit on the right-hand-side range, so the optimal solution - Select your answer-change. Check My Work
Industrial Designs has been awarded a contract to design a label for a new wine produced by Lake View Winery. The company estimates that 150 hours will be required to complete the project. The firm's three graphic designers available for assignment to this project are Lisa, a senior designer and team leader; David, a senior designer; and Sarah, a junior designer. Because Lisa has worked on several projects for Lake View Winery, management specified that Lisa must be assigned at least 40% of the total number of hours assigned to the two senior designers. To provide label designing experience for Sarah, the junior designer must be assigned at least 15% of the total project time. However, the number of hours assigned to Sarah must not exceed 25% of the total number of hours assigned to the two senior designers. Due to other project commitments, Lisa has a maximum of 50 hours available to work on this project. Hourly wage rates are $30 for Lisa, $11 for David, and $18 for Sarah. (a) Formulate a linear program that can be used to determine the number of hours each graphic designer should e assigned to the project to minimize total cost. If an amount is zero, enter "0". If the constant is "1" it must be entered in the box. For negative numbers use a minus sign (Example: enter -100). Let L = number of hours assigned to Lisa D = number of hours assigned to David S = number of hours assigned to Sarah L+ $ D + $ S Min $ s.t. L + D + S≥ Minimum Lisa L D + S≥ Minimum Sarah D + S Maximum Lisa L + D + S S Maximum Sarah L D S= Total Time L, D, S 20 (b) How many hours should be assigned to each graphic designer? Hours Assigned Lisa David Sarah What is the total cost? If required, round your answer to a whole dollar amount. $ (c) Suppose Lisa could be assigned more than 50 hours. What effect would this have on the optimal solution? Explain. If an amount is zero, enter "0". We know that the shadow price for this constraint is , since the constraint is -Select your answer - V .Therefore, additional hours for Lisa will - Select your answer the solution. (d) If Sarah were not required to work a minimum number of hours on this project, would the optimal solution change? -Select your answer Explain. There Select your answer- lower limit on the right-hand-side range, so the optimal solution - Select your answer-change. Check My Work
Chapter17: Organizational Planning And Controlling
Section: Chapter Questions
Problem 2CTQ: China effectively shuts down for two weeks each year and celebrates the lunar new year. How does...
Related questions
Question
Use Excel to answer the question.

Transcribed Image Text:Industrial Designs has been awarded a contract to design a label for a new wine produced by Lake View Winery. The company estimates that 150 hours will be required to complete the project. The firm's three graphic designers available for assignment to this project are Lisa, a senior designer and team leader; David, a senior designer; and Sarah, a junior designer. Because Lisa has worked on several projects for Lake View Winery, management specified that Lisa must be assigned at least 40% of the total number of hours assigned to the two senior designers. To provide label designing experience for Sarah, the junior designer must be
assigned at least 15% of the total project time. However, the number of hours assigned to Sarah must not exceed 25% of the total number of hours assigned to the two senior designers. Due to other project commitments, Lisa has a maximum of 50 hours available to work on this project. Hourly wage rates are $30 for Lisa, $11 for David, and $18 for Sarah.
(a) Formulate a linear program that can be used to determine the number of hours each graphic designer should e assigned to the project to minimize total cost. If an amount is zero, enter "0". If the constant is "1" it must be entered in the box. For negative numbers use a minus sign (Example: enter -100).
Let L = number of hours assigned to Lisa
D = number of hours assigned to David
S = number of hours assigned to Sarah
L+ $
D + $
S
Min $
s.t.
L +
D
+
S≥
Minimum Lisa
L
D
+
S≥
Minimum Sarah
D +
S
Maximum Lisa
L
+
D
+
S S
Maximum Sarah
L
D
S=
Total Time
L, D, S 20
(b) How many hours should be assigned to each graphic designer?
Hours Assigned
Lisa
David
Sarah
What is the total cost? If required, round your answer to a whole dollar amount.
$
(c) Suppose Lisa could be assigned more than 50 hours. What effect would this have on the optimal solution? Explain. If an amount is zero, enter "0".
We know that the shadow price for this constraint is
, since the constraint is -Select your answer - V .Therefore, additional hours for Lisa will - Select your answer
the solution.
(d) If Sarah were not required to work a minimum number of hours on this project, would the optimal solution change?
-Select your answer
Explain.
There Select your answer-
lower limit on the right-hand-side range, so the optimal solution - Select your answer-change.
Check My Work
Expert Solution

This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 2 steps

Recommended textbooks for you

Understanding Management (MindTap Course List)
Management
ISBN:
9781305502215
Author:
Richard L. Daft, Dorothy Marcic
Publisher:
Cengage Learning

Management, Loose-Leaf Version
Management
ISBN:
9781305969308
Author:
Richard L. Daft
Publisher:
South-Western College Pub

Understanding Management (MindTap Course List)
Management
ISBN:
9781305502215
Author:
Richard L. Daft, Dorothy Marcic
Publisher:
Cengage Learning

Management, Loose-Leaf Version
Management
ISBN:
9781305969308
Author:
Richard L. Daft
Publisher:
South-Western College Pub