SITHCCC036 Student Assessment Task 2
.docx
keyboard_arrow_up
School
Sydney College of Divinity *
*We aren’t endorsed by this school
Course
MISC
Subject
Management
Date
Jun 27, 2024
Type
docx
Pages
16
Uploaded by ChefDragon8823
SITHCCC036 Prepare meat dishes
Assessment Details
Unit Code/Name
SITHCCC036 Prepare meat dishes
Qualification Code/Name
SITHCCC036 Prepare meat dishes
Assessment Task
Task 2
Student Details
Student Name
Bishal Bhandari
Student ID
MCS2000525
Student Declaration:
I declare that the work submitted is my own and has
not been copied or plagiarized from any person or source.
Signature: bishal
Date:
25/04/2024 © Sydney City College of Management Pty Ltd
RTO: 45203
CRICOS: 03620C
Date
Revision date
Version
Page 1 of 16
File Name: SITHCCC036
Assessment tools
April 2023
April 2024
1.0
SITHCCC036 Prepare meat dishes
Instructions to Students
This assessment is to be completed according to the instructions given below in this document. Please read
the Questions carefully then complete all Tasks.
Should you not answer the tasks correctly, your assessor will provide you with feedback on the results and
gaps in knowledge. You are entitled to two (2) resubmissions attempts in showing your competence with this
unit. Please refer to the College re-submission policy for more information.
Before submitting this assessment, ensure that you have provided all required information above, signed and
dated.
If you have questions and other concerns that may affect your performance in the Assessment, please inform
your assessor immediately.
To receive satisfactory outcome in this assessment, you must answer all the questions correctly.
This is an Individual Assessment. Once you have completed this assessment, please submit the assessment on
Moodle in the designated submission link.
Plagiarism is copying someone else’s work and submitting it as your own. Any Plagiarism will result in a mark
of Not Satisfactory. SCCM uses a Plagiarism Checker to check the originality of the student assessment. The
student must be aware of and understand the SCCM’s policy on plagiarism and certify that this assignment is
their own work
, except were indicated by referencing, and that student have followed good academic
practices.
© Sydney City College of Management Pty Ltd
RTO: 45203
CRICOS: 03620C
Date
Revision date
Version
Page 2 of 16
File Name: SITHCCC036
Assessment tools
April 2023
April 2024
1.0
SITHCCC036 Prepare meat dishes
Introduction
Welcome to the Student Assessment Tasks for SITHCCC036 Prepare meat dishes
. These tasks have been designed to help you demonstrate the skills and knowledge that you have learnt during your course. Please ensure that you read the instructions provided with these tasks carefully. You should also follow the advice provided in the Hospitality Works Student User Guide
. The Student User Guide provides important information for you relating to completing assessment successfully.
Assessment for this unit
For you to be assessed as competent, you must successfully complete two assessment tasks:
Assessment Task 1: Knowledge questions – You must answer all questions correctly.
Assessment Task 2: Student Logbook – You must complete a range of food preparation tasks using commercial fixed and handheld equipment and complete a Student Logbook. The assessor must also observe a range of cooking tasks.
Kitchen time required
You will require time in the kitchen to complete Assessment Task 2. You will find more information about the requirements for training/commercial kitchens in the Hospitality Works Student User Guide
.
© Sydney City College of Management Pty Ltd
RTO: 45203
CRICOS: 03620C
Date
Revision date
Version
Page 3 of 16
File Name: SITHCCC036
Assessment tools
April 2023
April 2024
1.0
SITHCCC036 Prepare meat dishes
Assessment Task 2: Student Logbook
Information for students
Tasks required for this unit
This unit of competency requires that you:
follow standard recipes to prepare at least six finished meat dishes using each of the following meat items at least once:
o
beef o
game:
kangaroo or wallaby
specialty meats
o
lamb
o
pork
o
offal
use each of the following meat preparation techniques at least once when preparing the above dishes:
o
barding o
de-boning
o
trimming
o
frenching
o
portioning
o
wet and dry marinating
o
mincing
o
rolling
o
tenderising
o
tying
o
skewering
prepare the required meat dishes using each of the following cookery methods at least once:
o
braising o
deep-frying
o
shallow-frying
o
grilling
o
roasting
o
sous vide
o
stewing
cook a beef restaurant cut steak according to specified cooking preference from the following options:
o
blue
o
rare
o
medium rare
o
medium
o
medium well
o
well done
© Sydney City College of Management Pty Ltd
RTO: 45203
CRICOS: 03620C
Date
Revision date
Version
Page 4 of 16
File Name: SITHCCC036
Assessment tools
April 2023
April 2024
1.0
SITHCCC036 Prepare meat dishes
prepare, plate and present two portions of each of the six finished dishes and steaks above:
o
within commercial time constraints and deadlines
o
responding to at least one special customer request
o
following procedures for portion control and food safety practices when handling and storing meat.
Instructions for how you will complete these requirements are included below.
© Sydney City College of Management Pty Ltd
RTO: 45203
CRICOS: 03620C
Date
Revision date
Version
Page 5 of 16
File Name: SITHCCC036
Assessment tools
April 2023
April 2024
1.0
SITHCCC036 Prepare meat dishes
Activities
Complete the following activities.
1.
Carefully read the following information.
Successful completion of this unit requires that you complete the range of cooking tasks listed above. It is important that you provide evidence that you have successfully completed each task. We have provided you with a Student Logbook to help you.
Below is a guide to the skills and knowledge you must demonstrate when you are completing each task. We have provided a number of documents to assist you and you will find these in your Student Logbook
. What do I need to demonstrate?
During your practical assessments you will be required to demonstrate a range of the skills and knowledge that you have developed during your course. These include:
interpreting standard recipes and food preparation lists
confirming food production requirements
calculating ingredient amounts
identifying and selecting meat products and other ingredients from stores according to quality, freshness and stock rotation requirements
following procedures for portion control
producing the required quantities
checking perishable supplies for spoilage
checking perishable supplies for contamination
selecting the type and size of knives required
selecting the type and size of equipment required
ensuring that food preparation equipment safely assembled, clean and ready for use
using knives and equipment safely and hygienically
using equipment according to the manufacturer’s instructions
thawing frozen meats safely
sorting and assembling ingredients according to food production sequencing
weighing and measuring ingredients accurately
creating portions according to the recipe
using meat preparation techniques according to recipe requirements
© Sydney City College of Management Pty Ltd
RTO: 45203
CRICOS: 03620C
Date
Revision date
Version
Page 6 of 16
File Name: SITHCCC036
Assessment tools
April 2023
April 2024
1.0
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
Related Questions
nity College | Pima x
B Module 12 Practice Assignment
6 Question 1- Module 12 Practice x
A ezto.mheducation.com/ext/map/index.html?_con=con&external_browser=D0&launchUrl=https%253A%252F%252Flms.mheducation.com%252Fmghmiddleware%252Fr
ediStay v4
E New Scorpion
O Redistay - (Unknown) U Ulitpro -New
e Scorpion (UAT)
5) Springfield - Home
inContact
Dashboards
RediStay v4 (UAT) -...
lodule 12 Practice Assignment_Ch.17 i
Saved
1
Challenge Problem 17-25 (Static) [LU 17-2 (2)]
A delivered price (including attachments) of a crawler dozer tractor is $135,000 with a residual value of 35%. The useful life of the
tractor is 7,700 hours
eBook
Print
a. What is total amount of depreciation allowed?
References
Total amount
b. What is the amount of depreciation per hour? (Round your answer to the nearest cent.)
Amount of depreciation
per hour
arrow_forward
Do it with refrences
arrow_forward
Question:
A Hospital Management System Development Project has a budgeted cost of Rs. 11,900,000/-. The project is to be completed in 11 months. After 4 months, you have completed 24 percent of the project at a total expense of Rs. 1,475,000/-. You, as a Project Manager, needs to submit the monthly performance report to the Steering Committee. Based on EVM methodology, please identify the current progress of the Project.
Find Budget at Completion (BAC), Actual Cost(AC), Planned Value (PV) and Earned Value (EV).
Calculate the Project Health by finding values of Schedule Variance (SV), Schedule Performance Index (SPI), Cost Variance (CV) and Cost Performance Index (CPI). What these value shows?
If the project continues at the current pace, what will be the true cost of the Project or Estimate at completion of the project.
What actions, You would suggest or take as a Project Manager, to keep the budget and time under control.
arrow_forward
Subject: project management
Q. What steps can you take to maximise "quality" when yOU
are gathering requirements from users?
arrow_forward
Ongoing Clients 75
Client Attrition Rate for MRR: 30%
Avg MRR from New Business per Rep $ 15,000
Average Deal Size (MRR) $ 12,000
% of SQLs that Close 16%
% MQLs that Become SQLs 9%
# of Reps on Team 5
Avg Growth Deals per Rep per Month 2
Avg MQL per Month 600
Avg MRR from Growth Deals per Rep $ 20,000
What is the NEW BUSINESS MRR Current Year $ per Rep?
arrow_forward
(Use the information below to solve Q11 - Q20)
Given the following information regarding a project:
Predecess
ors
None
None
a
a
b
b
Activity
a
b
C
d
e
CD
f
OC
g
h
Duration
3
1
3
4
4
5
23
c, e
f
Which of the following is NOT a path in the network?
O a-d
O a-c-g
b-c-g
O b-e-g
b-f-h
arrow_forward
15. For the network shown:
Crash Cost/week - (CC-NC)/(NT-CT)
TOTAL COST-$44,000
Crash D-$1,000
Crash G-$2,000
Crash A-$3,000
0
0
ATS)
Activity
A
B
54
C
D
E
F
45
45
B(10)
C(8)
1514
15
10
13 12
14
Normal Time
5
8
6
7
14 15
15
D(6)
21 20 19
21
a. Determine the critical path and the early completion time in weeks for the project.
b. For the data shown, reduce the project completion time by three weeks. Assume a lin-
ear cost per week shortened, and show, step by step, how you arrived at your schedule.
20 19
E(7)
14
13 17
F(4)
17 21
Normal Cost
$7,000
12,000
5,000
4,000
3,000
6,000
7,000
21
20
21 25
G(4)
25
Crash Time
3
7
7
24 23 22
A 2
B3
C1
D1
E1
5
6 F1
3 G1
Crash Cost
$13,000
18,000
7,000
5,000
6,000
7,000
9,000
A $3,000
B $2,000
C $2,000
D $1,000
E $3,000
F $1,000
G $2,000
arrow_forward
A ng.cengage.com
earning
Bb https://learn-us-east-1-prod-fleet01-xythos.content.blackboardcdn.com/blackboard.learn.xythos
AP
Q Se.
E AA
Review
ritical Thinking Activities
Module 2 Critical Thinking Activities
Assignment Score: 0.00%
Save
Submit Assignment
Questions
ca2ce01h_Module2.03
« Question 3 of 5 »
1.
2.
Emma Jackson is thinking of starting a retail business with two friends who have extensive experience in
sales and business organization. They want to determine whether they should run the business as an e-
commerce website or a brick-and-mortar store. Research the pros and cons of e-commerce for businesses
o and recommend an option to Emma.
3.
4.
5.
MacBook Air
DII
DD
O O O O0
arrow_forward
Question 5
Many of the individuals that sit on the group or council that typically oversees the Lean Six Sigma
projects and culture in an organization also get involved in the day-to-day project details to ensure
that the projects they are sponsoring or championing are going according to plan.
O True
O False
Question 6
All of the following are types of team members on a Lean Six Sigma project EXCEPT:
O Regular team members
O Ad-hoc team members
O Project evangelists
O Resource team members.
arrow_forward
1
arrow_forward
Q1:243
A project manager should have many skills. Describe two of these skills by providing a scenario in your choice to show how your selected skills are necessary. A description of the scenario’s environment is required for a better understood of the project manager qualities.
arrow_forward
CASE - CAPACITY BUILDING PROJECT AIMS TO INCREASE YOUTH INVOLVEMENT IN SUSTAINABLE DEVELOPMENT Basseterre, St. Kitts, April 29, 2021 (SKNIS): St. Kitts and Nevis Youth Ambassador Corps officially launched a new project on Wednesday (April 28, 2021) designed to increase the contributions of young people to the sustainable development of the twin-island Federation. The initiative, dubbed the Youth Capacity Building Small Grants Project on Youth in Sustainable Development, will build the capacity and practical skills of young people to design, implement, and monitor interventions relevant to the social, economic, and sustainable development of youth and their communities. The project is geared towards members of youth groups specifically. It is spearheaded by the national youth ambassador corps in collaboration with the GEF Small Grants Programme (SGP), and the Departments of Youth in St. Kitts, and Nevis. The Small Grants Project is funding the initiative to the tune of US$49,970.00. SGP…
arrow_forward
CASE - CAPACITY BUILDING PROJECT AIMS TO INCREASE YOUTH INVOLVEMENT IN SUSTAINABLE DEVELOPMENT Basseterre, St. Kitts, April 29, 2021 (SKNIS): St. Kitts and Nevis Youth Ambassador Corps officially launched a new project on Wednesday (April 28, 2021) designed to increase the contributions of young people to the sustainable development of the twin-island Federation. The initiative, dubbed the Youth Capacity Building Small Grants Project on Youth in Sustainable Development, will build the capacity and practical skills of young people to design, implement, and monitor interventions relevant to the social, economic, and sustainable development of youth and their communities. The project is geared towards members of youth groups specifically. It is spearheaded by the national youth ambassador corps in collaboration with the GEF Small Grants Programme (SGP), and the Departments of Youth in St. Kitts, and Nevis. The Small Grants Project is funding the initiative to the tune of US$49,970.00. SGP…
arrow_forward
CASE - CAPACITY BUILDING PROJECT AIMS TO INCREASE YOUTH INVOLVEMENT IN SUSTAINABLE DEVELOPMENT Basseterre, St. Kitts, April 29, 2021 (SKNIS): St. Kitts and Nevis Youth Ambassador Corps officially launched a new project on Wednesday (April 28, 2021) designed to increase the contributions of young people to the sustainable development of the twin-island Federation. The initiative, dubbed the Youth Capacity Building Small Grants Project on Youth in Sustainable Development, will build the capacity and practical skills of young people to design, implement, and monitor interventions relevant to the social, economic, and sustainable development of youth and their communities. The project is geared towards members of youth groups specifically. It is spearheaded by the national youth ambassador corps in collaboration with the GEF Small Grants Programme (SGP), and the Departments of Youth in St. Kitts, and Nevis. The Small Grants Project is funding the initiative to the tune of US$49,970.00. SGP…
arrow_forward
CASE - CAPACITY BUILDING PROJECT AIMS TO INCREASE YOUTH INVOLVEMENT IN SUSTAINABLE DEVELOPMENT Basseterre, St. Kitts, April 29, 2021 (SKNIS): St. Kitts and Nevis Youth Ambassador Corps officially launched a new project on Wednesday (April 28, 2021) designed to increase the contributions of young people to the sustainable development of the twin-island Federation. The initiative, dubbed the Youth Capacity Building Small Grants Project on Youth in Sustainable Development, will build the capacity and practical skills of young people to design, implement, and monitor interventions relevant to the social, economic, and sustainable development of youth and their communities. The project is geared towards members of youth groups specifically. It is spearheaded by the national youth ambassador corps in collaboration with the GEF Small Grants Programme (SGP), and the Departments of Youth in St. Kitts, and Nevis. The Small Grants Project is funding the initiative to the tune of US$49,970.00. SGP…
arrow_forward
CASE - CAPACITY BUILDING PROJECT AIMS TO INCREASE YOUTH INVOLVEMENT IN SUSTAINABLE DEVELOPMENT Basseterre, St. Kitts, April 29, 2021 (SKNIS): St. Kitts and Nevis Youth Ambassador Corps officially launched a new project on Wednesday (April 28, 2021) designed to increase the contributions of young people to the sustainable development of the twin-island Federation. The initiative, dubbed the Youth Capacity Building Small Grants Project on Youth in Sustainable Development, will build the capacity and practical skills of young people to design, implement, and monitor interventions relevant to the social, economic, and sustainable development of youth and their communities. The project is geared towards members of youth groups specifically. It is spearheaded by the national youth ambassador corps in collaboration with the GEF Small Grants Programme (SGP), and the Departments of Youth in St. Kitts, and Nevis. The Small Grants Project is funding the initiative to the tune of US$49,970.00. SGP…
arrow_forward
Q1 No HandWriting:
What are Project Management Knowledge areas? Explain the various types of knowledge areas that project managers should develop for effective and efficient management of their projects.
arrow_forward
EVENT 1: "The vacant project manager's position has not been filled." EVENT 2: "A credit card transaction for a friend has been denied".QUESTION 1: Conduct a root cause identification and analysis for both events, i.e., provide the appropriate “why” questions. Provide four (4) “why” questions for both events.QUESTION 2: Provide the corresponding observation for each of the four (4) “why” questions from the root cause analysis above, for both events.
arrow_forward
CASE - CAPACITY BUILDING PROJECT AIMS TO INCREASE YOUTH INVOLVEMENT IN SUSTAINABLE DEVELOPMENT Basseterre, St. Kitts, April 29, 2021 (SKNIS): St. Kitts and Nevis Youth Ambassador Corps officially launched a new project on Wednesday (April 28, 2021) designed to increase the contributions of young people to the sustainable development of the twin-island Federation. The initiative, dubbed the Youth Capacity Building Small Grants Project on Youth in Sustainable Development, will build the capacity and practical skills of young people to design, implement, and monitor interventions relevant to the social, economic, and sustainable development of youth and their communities. The project is geared towards members of youth groups specifically. It is spearheaded by the national youth ambassador corps in collaboration with the GEF Small Grants Programme (SGP), and the Departments of Youth in St. Kitts, and Nevis. The Small Grants Project is funding the initiative to the tune of US$49,970.00. SGP…
arrow_forward
Task No.
Task Name
Task Duration(Days)
Immediate Predecessor task
1
Preliminary system description
40
—
2
Develop specifications
100
1
3
Client approval
50
2
4
Develop input-output summary
60
2
5
Develop alarm list
40
4
6
Develop log formats
40
3, 5
7
Software definition
35
3
8
Hardware requirements
35
3
9
Finalize input-output summary
60
5, 6
10
Analysis performance calculations
70
9
11
Automatic turbine startup analysis
65
9
12
Boiler guides analysis
30
9
13
Fabricate and ship
200
10, 11, 12
14
Software preparation
80
7, 10, 11
15
Install and check
130
13, 14
16
Termination and wiring lists
30
9
17
Schematic wiring lists
60
16
18
Pulling terminals and cables
60
15, 17
19
Operational test
125
18
20
First firing
1
19
Therefore, Critical Path = 1-2-4-5-6-9-10-13-15-18-19-20
Note: tj is the original duration of task j; dj is the minimum duration of task j.
Expediting Costs ($1,000) and Limits
Task no.…
arrow_forward
Safari
File Edit
View History Bookmarks Window Help
✓
<
mylab.pearson.com
Access Pearson
P Pearson MyLab and Mastering
P Course Home
P Homework
24FA MGS 3100 ONF02
→ Homework: Ch 02 Homework
Question
Part 1 of 4
Sun Sep 15 2:59 PM
b Success Confirmation of Question S...
Catherine Lee
09/15/24 2:59 PM
Completed: 0 of 18 | My score: 0/30 pts (0%)
Save
Minimize list
{}
{}
Concept Question 4.4
Question 0/1 pt
Concept Question 4.3
Question 0/1 pt
Concept Question 5.1
Question 0/1 pt
Concept Question 5.3
Question 0/1 pt
Founded in 1970, ABC is one of the world's largest insurance companies with locations in 28 countries. Given the following description, flowchart the new
policy setup process as it existed in 1970:
Individual customers who wanted to set up a new policy would visit one of ABC's 70 branch offices or make contact with an agent. They would then fill out an
application and sometimes attach a check. The branch office then sent the application package through company mail to the XYZ…
arrow_forward
Arts
e Knowledge Language A
NAME:
DATE:
1. What clues tell you that you are close to a vent?
13.2
CONTINUED
2. How would you get close enough to observe the vent?
3. What would you discover on the seafloor near the vent?
4. Why is it important to conduct your underwater mission?
Activity Book | Unit 5
Core Knowledge Language Arts | Grade 4
TAKE-HOME
arrow_forward
time (hours)
pH
7.00
7.30
6.99
7.00
Assignment
1
2
7.12
7.25
7.12
7.20
3
720
7.16
720
7.16
4
6.98
7.00
6.94
7.00
5
6.99
6.99
6.99
6.98
6
7.00
6.93
7.02
6.93
7
6.92
7.00
6.92
7.02
Construct the X-Bar
charts and R- charts
6.88
6.82
6.94
6.99
7.10
7.00
7.00
7.00
for reporting your
results
10
721
7.02
721
7.04
11
7.01
6.86
7.01
6.90
12
6.86
6.98
6.90
6.98
13
6.90
7.00
6.87
7.00
14
7.01
7.04
7.01
7.05
15
7.00
6.95
7.00
6.99
16
7.09
7.20
7.03
7.20
17
6.89
7.14
6.87
7.15
18
6.98
6.80
6.98
6.89
19
7.00
6.90
7.00
6.90
20
7.20
7.00
723
7.00
21
7.04
7.03
7.08
7.00
22
6.90
6.92
6.98
6.92
23
7.00
7.00
7.00
7.00
24
7.00
6.97
7.01
6.98
arrow_forward
What is the total cost for this project? (question a)iv.)
arrow_forward
Group Assignment Topic: Case Study Assignment
Assigned marks: 35
DESCRIPTION OF THE ASSIGNMENT
A Radant Beauty for a New Generation When Sam Rainer launched Radant Beauty in the USA in spring 2021, it was with a clearly articulated marketing strategy – a hefty first-year sales goal of $1.7 Million. Nine months after rollout, Rainer’s plan seemed to have worked quite well. His skincare company and product line had already topped the $1 Million mark and showed no signs of slowing.
The line was formerly owned Zirh Skin Nutrition, a male skincare line that was acquired by Shisheido in 2000. Rainer immediately recognized an underserved market segment among young people ages fifteen to twenty-nine, a group he called “Generation Me”. A combination of Generation X and Generation Y, Generation Me had long been ignored by the more recognized skincare companies, which tended to make products to help older consumers fight such skin ailments as wrinkles and recondition ageing skin. No…
arrow_forward
QUESTION 1
In a project organizational structure, of an enterprise, the project manger reports to:
A functional manager
VP
CEO
Both functional manager CEO
arrow_forward
SEE MORE QUESTIONS
Recommended textbooks for you
Understanding Business
Management
ISBN:9781259929434
Author:William Nickels
Publisher:McGraw-Hill Education
Management (14th Edition)
Management
ISBN:9780134527604
Author:Stephen P. Robbins, Mary A. Coulter
Publisher:PEARSON
Spreadsheet Modeling & Decision Analysis: A Pract...
Management
ISBN:9781305947412
Author:Cliff Ragsdale
Publisher:Cengage Learning
Management Information Systems: Managing The Digi...
Management
ISBN:9780135191798
Author:Kenneth C. Laudon, Jane P. Laudon
Publisher:PEARSON
Business Essentials (12th Edition) (What's New in...
Management
ISBN:9780134728391
Author:Ronald J. Ebert, Ricky W. Griffin
Publisher:PEARSON
Fundamentals of Management (10th Edition)
Management
ISBN:9780134237473
Author:Stephen P. Robbins, Mary A. Coulter, David A. De Cenzo
Publisher:PEARSON
Related Questions
- nity College | Pima x B Module 12 Practice Assignment 6 Question 1- Module 12 Practice x A ezto.mheducation.com/ext/map/index.html?_con=con&external_browser=D0&launchUrl=https%253A%252F%252Flms.mheducation.com%252Fmghmiddleware%252Fr ediStay v4 E New Scorpion O Redistay - (Unknown) U Ulitpro -New e Scorpion (UAT) 5) Springfield - Home inContact Dashboards RediStay v4 (UAT) -... lodule 12 Practice Assignment_Ch.17 i Saved 1 Challenge Problem 17-25 (Static) [LU 17-2 (2)] A delivered price (including attachments) of a crawler dozer tractor is $135,000 with a residual value of 35%. The useful life of the tractor is 7,700 hours eBook Print a. What is total amount of depreciation allowed? References Total amount b. What is the amount of depreciation per hour? (Round your answer to the nearest cent.) Amount of depreciation per hourarrow_forwardDo it with refrencesarrow_forwardQuestion: A Hospital Management System Development Project has a budgeted cost of Rs. 11,900,000/-. The project is to be completed in 11 months. After 4 months, you have completed 24 percent of the project at a total expense of Rs. 1,475,000/-. You, as a Project Manager, needs to submit the monthly performance report to the Steering Committee. Based on EVM methodology, please identify the current progress of the Project. Find Budget at Completion (BAC), Actual Cost(AC), Planned Value (PV) and Earned Value (EV). Calculate the Project Health by finding values of Schedule Variance (SV), Schedule Performance Index (SPI), Cost Variance (CV) and Cost Performance Index (CPI). What these value shows? If the project continues at the current pace, what will be the true cost of the Project or Estimate at completion of the project. What actions, You would suggest or take as a Project Manager, to keep the budget and time under control.arrow_forward
- Subject: project management Q. What steps can you take to maximise "quality" when yOU are gathering requirements from users?arrow_forwardOngoing Clients 75 Client Attrition Rate for MRR: 30% Avg MRR from New Business per Rep $ 15,000 Average Deal Size (MRR) $ 12,000 % of SQLs that Close 16% % MQLs that Become SQLs 9% # of Reps on Team 5 Avg Growth Deals per Rep per Month 2 Avg MQL per Month 600 Avg MRR from Growth Deals per Rep $ 20,000 What is the NEW BUSINESS MRR Current Year $ per Rep?arrow_forward(Use the information below to solve Q11 - Q20) Given the following information regarding a project: Predecess ors None None a a b b Activity a b C d e CD f OC g h Duration 3 1 3 4 4 5 23 c, e f Which of the following is NOT a path in the network? O a-d O a-c-g b-c-g O b-e-g b-f-harrow_forward
- 15. For the network shown: Crash Cost/week - (CC-NC)/(NT-CT) TOTAL COST-$44,000 Crash D-$1,000 Crash G-$2,000 Crash A-$3,000 0 0 ATS) Activity A B 54 C D E F 45 45 B(10) C(8) 1514 15 10 13 12 14 Normal Time 5 8 6 7 14 15 15 D(6) 21 20 19 21 a. Determine the critical path and the early completion time in weeks for the project. b. For the data shown, reduce the project completion time by three weeks. Assume a lin- ear cost per week shortened, and show, step by step, how you arrived at your schedule. 20 19 E(7) 14 13 17 F(4) 17 21 Normal Cost $7,000 12,000 5,000 4,000 3,000 6,000 7,000 21 20 21 25 G(4) 25 Crash Time 3 7 7 24 23 22 A 2 B3 C1 D1 E1 5 6 F1 3 G1 Crash Cost $13,000 18,000 7,000 5,000 6,000 7,000 9,000 A $3,000 B $2,000 C $2,000 D $1,000 E $3,000 F $1,000 G $2,000arrow_forwardA ng.cengage.com earning Bb https://learn-us-east-1-prod-fleet01-xythos.content.blackboardcdn.com/blackboard.learn.xythos AP Q Se. E AA Review ritical Thinking Activities Module 2 Critical Thinking Activities Assignment Score: 0.00% Save Submit Assignment Questions ca2ce01h_Module2.03 « Question 3 of 5 » 1. 2. Emma Jackson is thinking of starting a retail business with two friends who have extensive experience in sales and business organization. They want to determine whether they should run the business as an e- commerce website or a brick-and-mortar store. Research the pros and cons of e-commerce for businesses o and recommend an option to Emma. 3. 4. 5. MacBook Air DII DD O O O O0arrow_forwardQuestion 5 Many of the individuals that sit on the group or council that typically oversees the Lean Six Sigma projects and culture in an organization also get involved in the day-to-day project details to ensure that the projects they are sponsoring or championing are going according to plan. O True O False Question 6 All of the following are types of team members on a Lean Six Sigma project EXCEPT: O Regular team members O Ad-hoc team members O Project evangelists O Resource team members.arrow_forward
- 1arrow_forwardQ1:243 A project manager should have many skills. Describe two of these skills by providing a scenario in your choice to show how your selected skills are necessary. A description of the scenario’s environment is required for a better understood of the project manager qualities.arrow_forwardCASE - CAPACITY BUILDING PROJECT AIMS TO INCREASE YOUTH INVOLVEMENT IN SUSTAINABLE DEVELOPMENT Basseterre, St. Kitts, April 29, 2021 (SKNIS): St. Kitts and Nevis Youth Ambassador Corps officially launched a new project on Wednesday (April 28, 2021) designed to increase the contributions of young people to the sustainable development of the twin-island Federation. The initiative, dubbed the Youth Capacity Building Small Grants Project on Youth in Sustainable Development, will build the capacity and practical skills of young people to design, implement, and monitor interventions relevant to the social, economic, and sustainable development of youth and their communities. The project is geared towards members of youth groups specifically. It is spearheaded by the national youth ambassador corps in collaboration with the GEF Small Grants Programme (SGP), and the Departments of Youth in St. Kitts, and Nevis. The Small Grants Project is funding the initiative to the tune of US$49,970.00. SGP…arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Understanding BusinessManagementISBN:9781259929434Author:William NickelsPublisher:McGraw-Hill EducationManagement (14th Edition)ManagementISBN:9780134527604Author:Stephen P. Robbins, Mary A. CoulterPublisher:PEARSONSpreadsheet Modeling & Decision Analysis: A Pract...ManagementISBN:9781305947412Author:Cliff RagsdalePublisher:Cengage Learning
- Management Information Systems: Managing The Digi...ManagementISBN:9780135191798Author:Kenneth C. Laudon, Jane P. LaudonPublisher:PEARSONBusiness Essentials (12th Edition) (What's New in...ManagementISBN:9780134728391Author:Ronald J. Ebert, Ricky W. GriffinPublisher:PEARSONFundamentals of Management (10th Edition)ManagementISBN:9780134237473Author:Stephen P. Robbins, Mary A. Coulter, David A. De CenzoPublisher:PEARSON
Understanding Business
Management
ISBN:9781259929434
Author:William Nickels
Publisher:McGraw-Hill Education
Management (14th Edition)
Management
ISBN:9780134527604
Author:Stephen P. Robbins, Mary A. Coulter
Publisher:PEARSON
Spreadsheet Modeling & Decision Analysis: A Pract...
Management
ISBN:9781305947412
Author:Cliff Ragsdale
Publisher:Cengage Learning
Management Information Systems: Managing The Digi...
Management
ISBN:9780135191798
Author:Kenneth C. Laudon, Jane P. Laudon
Publisher:PEARSON
Business Essentials (12th Edition) (What's New in...
Management
ISBN:9780134728391
Author:Ronald J. Ebert, Ricky W. Griffin
Publisher:PEARSON
Fundamentals of Management (10th Edition)
Management
ISBN:9780134237473
Author:Stephen P. Robbins, Mary A. Coulter, David A. De Cenzo
Publisher:PEARSON