EBK PRINCIPLES OF OPERATIONS MANAGEMENT
11th Edition
ISBN: 9780135175644
Author: Munson
Publisher: VST
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 7.S, Problem 8P
Summary Introduction
To determine: The minimum number of service bays Company FL needs to achieve and anticipated servicing of 200 cars per 8-hour day.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Under ideal conditions, a service bay at a Fast Lube can serve 7 cars per hour. The effective capacity of a Fast Lube service bay is 5.5 cars per hour, with efficiency known to be 0.88.
The minimum number of service bays Fast Lube needs to achieve an anticipated production of 150 cars per 8-hour day = service bays (enter your response rounded up to the next whole number).
Under ideal conditions, a service bay at a FastLube can serve 6 cars per hour. The effective capacity and efficiency of a Fast Lube service bay are known to be 5.5 and0.880, respectively. What is the minimum number of servicebays Fast Lube needs to achieve an anticipated servicing of200 cars per 8-hour day?
Knott’s Industries manufactures standard and super premium backyard swing sets. Currently it has four identical swing-set-making machines, which are operated 250 days per year and 8 hours each day. A capacity cushion of 20 percent is desired. The following information is also known:
Standard Model
Super PremiumModel
Annual Demand
Standard Processing Time
Average Lot Size
Standard Setup Time per Lot
20,000
7 min
50
30 min
10,000
20 min
30
45 min
a. Does Knott’s have sufficient capacity to meet annual demand?b. If Knott’s was able to reduce the setup time for the Super Premium Model from 45 minutes to 30 minutes, would there be enough current capacity to produce 20,000 units of each type of swing set?
Chapter 7 Solutions
EBK PRINCIPLES OF OPERATIONS MANAGEMENT
Ch. 7.S - Prob. 1DQCh. 7.S - Prob. 2DQCh. 7.S - Prob. 3DQCh. 7.S - Prob. 4DQCh. 7.S - Prob. 5DQCh. 7.S - Distinguish between bottleneck time and throughput...Ch. 7.S - Prob. 7DQCh. 7.S - Prob. 8DQCh. 7.S - Prob. 9DQCh. 7.S - Prob. 10DQ
Ch. 7.S - Prob. 11DQCh. 7.S - Prob. 12DQCh. 7.S - What are the techniques available to operations...Ch. 7.S - Amy Xias plant was designed to produce 7,000...Ch. 7.S - For the post month, the plant in Problem S7.1,...Ch. 7.S - Prob. 3PCh. 7.S - Prob. 4PCh. 7.S - Prob. 5PCh. 7.S - The effective capacity and efficiency for the next...Ch. 7.S - Southeastern Oklahoma State Universitys business...Ch. 7.S - Prob. 8PCh. 7.S - Prob. 9PCh. 7.S - Prob. 10PCh. 7.S - The three-station work cell illustrated in Figure...Ch. 7.S - The three-station work cell at Pullman Mfg., Inc....Ch. 7.S - The Pullman Mfg., Inc., three-station work cell...Ch. 7.S - Prob. 14PCh. 7.S - 10 minutes per unit. Part 2 is simultaneously...Ch. 7.S - Prob. 16PCh. 7.S - Prob. 17PCh. 7.S - Using the data in Problem S7.17: a) What is the...Ch. 7.S - Prob. 19PCh. 7.S - Prob. 20PCh. 7.S - Prob. 21PCh. 7.S - Prob. 22PCh. 7.S - Prob. 23PCh. 7.S - Prob. 24PCh. 7.S - Prob. 25PCh. 7.S - Prob. 26PCh. 7.S - Prob. 27PCh. 7.S - Prob. 28PCh. 7.S - Prob. 29PCh. 7.S - Prob. 30PCh. 7.S - Prob. 31PCh. 7.S - Prob. 32PCh. 7.S - Prob. 33PCh. 7.S - Prob. 34PCh. 7.S - Prob. 35PCh. 7.S - Prob. 36PCh. 7.S - Prob. 37PCh. 7.S - Prob. 38PCh. 7.S - Prob. 39PCh. 7.S - Prob. 40PCh. 7.S - Prob. 41PCh. 7.S - Prob. 42PCh. 7.S - Prob. 43PCh. 7.S - Prob. 44PCh. 7.S - Prob. 45PCh. 7.S - Prob. 1VCCh. 7.S - a capacity expansion plan and a new 11-story...Ch. 7.S - a capacity expansion plan and a new 11-story...Ch. 7 - Ethical Dilemma For the sake of efficiency and...Ch. 7 - Prob. 1DQCh. 7 - Prob. 2DQCh. 7 - Prob. 3DQCh. 7 - Prob. 4DQCh. 7 - Prob. 5DQCh. 7 - Prob. 6DQCh. 7 - Prob. 7DQCh. 7 - Prob. 8DQCh. 7 - Prob. 9DQCh. 7 - Prob. 10DQCh. 7 - Prob. 11DQCh. 7 - Prob. 12DQCh. 7 - Prob. 13DQCh. 7 - Prob. 14DQCh. 7 - Prob. 15DQCh. 7 - Prob. 16DQCh. 7 - Prob. 17DQCh. 7 - Prob. 18DQCh. 7 - Prob. 19DQCh. 7 - Prob. 1PCh. 7 - Usingthedatain Problem 7.1, determinethemost...Ch. 7 - Prob. 3PCh. 7 - Refer to Problem 7.1. If a contract for the second...Ch. 7 - Stan Fawcetts company is considering producing a...Ch. 7 - Prob. 6PCh. 7 - Prob. 7PCh. 7 - Prob. 8PCh. 7 - Metters Cabinets, Inc., needs to choose a...Ch. 7 - Prob. 10PCh. 7 - Nagle Electric. Inc., of Lincoln, Nebraska, must...Ch. 7 - Stapleton Manufacturing intends to increase...Ch. 7 - Prepare a flowchart for one of the following: a)...Ch. 7 - Prepare a process chart for one of the activities...Ch. 7 - Prob. 15PCh. 7 - Prob. 16PCh. 7 - Prob. 17PCh. 7 - Prob. 1CSCh. 7 - Prob. 2CSCh. 7 - Prob. 3CSCh. 7 - Process Strategy at Wheeled Coach Wheeled Coach,...Ch. 7 - Prob. 1.2VCCh. 7 - Prob. 1.3VCCh. 7 - Prob. 1.4VCCh. 7 - Alaska Airlines: 20-Minute Baggage...Ch. 7 - Prob. 2.2VCCh. 7 - Prob. 2.3VCCh. 7 - Prob. 2.4VCCh. 7 - Prob. 2.5VCCh. 7 - Prob. 3.1VCCh. 7 - Prob. 3.2VCCh. 7 - Prob. 3.3VCCh. 7 - Prob. 3.4VC
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- RideShare offers short-term rentals of vehicles that are kept in small lots in urbanneighborhoods with plenty of potential customers. With one lot, it has eight cars. Theinterarrival time of potential demand for this lot from its base of customers is 40 minutes.The average rental period is five hours. If a customer checks availability of vehicles in thislot online and finds that they are all rented for the desired time, the customer skips rentingand finds alternative arrangements. However, because customers pay a monthly fee tosubscribe to this service, RideShare does not want customers to be disappointed too often.a. What is the offered load?b. What is the implied utilization?c. What is the capacity of the process (rentals per hour)?d. What is the probability that all eight cars are rented at the same time?e. How many customers are served every hour?f. What is the utilization of the cars?g. How many cars should it have in this lot to ensure that it serves at least 90 percent ofdemand?arrow_forward5. Under ideal conditions, a service bay at a Fast Lube can serve 8 cars per hour. The effective capacity of a Fast Lube service bay is 5.7 cars per hour, with efficiency known to be 0.85. The minimum number of service bays Fast Lube needs to achieve an anticipated production of 150 cars per 8-hour day = 3.93.9 service bays ( __________ ).arrow_forwardsniparrow_forward
- Agan Interior Design provides home and office decorating assistance to its customers. In normal operation, an average of 2.1 customers arrive each hour. One design consultant is available to answer customer questions and make product recommendations. Agan's management would like to evaluate two alternatives: Use one consultant with an average service time of 8 minutes per customer. Expand to two consultants, each of whom has an average service time of 10 minutes per customer. If the consultants are paid $18 per hour and the customer waiting time is valued at $26 per hour for waiting time prior to service, should Agan expand to the two-consultant system? - No What is the total cost for each scenario? Round your answers to the nearest cent. The total cost for the first scenario where there is one consultant with an average service time of 8 minutes per customer is $____________. The total cost for the second scenario where there are two consultants with an average service time of 10…arrow_forwardAgan Interior Design provides home and office decorating assistance to its customers. In normal operation, an average of 2.7 customers arrive each hour. One design consultant is available to answer customer questions and make product recommendations. Agan's management would like to evaluate two alternatives: Use one consultant with an average service time of 8 minutes per customer. Expand to two consultants, each of whom has an average service time of 10 minutes per customer. If the consultants are paid $19 per hour and the customer waiting time is valued at $29 per hour for waiting time prior to service, should Agan expand to the two-consultant system? No What is the total cost for each scenario? Round your answers to the nearest cent. The total cost for the first scenario where there is one consultant with an average service time of 8 minutes per customer is $ fill in the blank 2 . The total cost for the second scenario where there are two consultants with an average service time of…arrow_forwardUberya Towing Services repair vehicles that break down at an average 8 vehicles per day. The mechanic crew can service an average of 11 vehicles per day. How many vehicles are likely to be in the system at any one time? The crew cost is approximately Php 900 per day. The cost associated with lost productivity from the breakdown is estimated at Php500 per vehicle per day. if an additional Service crew is added, What is the Expected or Total Cost (Waiting +Service Cost)?arrow_forward
- Uberya Towing Services repair vehicles that break down at an average 7.5 vehicles per day. The mechanic crew can service an average of 10 vehicles per day. The crew cost is approximately Php1406 per day. The cost associated with lost productivity from the breakdown is estimated at Php500 per vehicle per day. if an additional 2 Service crews are added, What is the Expected or Total Cost (Waiting +Service Cost)?arrow_forwardThe Corner Cleaners 24-hour laundromat has 16 washing machines. A machine breaks down every 20 days(exponentially distributed). The repair service the laundromat contracts takes an average of one day to repair amachine (exponentially distributed). A washing machineaverages $5 per hour in revenue. The laundromat is considering a new repair service that guarantees repairs in0.50 day, but they charge $10 more per hour than thecurrent repair service. Should the laundromat switch tothe new repair service?arrow_forwardA grocery store has three open checkout lanes. On average, 45 shoppers arrive at these lanes per hour. The coefficient of variation of the interarrival time is equal to 1. The average service times for all the lanes is 18 customers per hour, and the coefficient of variation of service time distribution for all three lanes is three minutes. What is the percentage decrease in utilization when one more checkout lane is added to the system? Select one: а. 62.5% b. 50% C. 25% d. 15%arrow_forward
- The Universal Manufacturing Company produces a par-ticular product in an assembly-line operation. One of the machines on the line is a drill press that has a single as-sembly line feeding into it. A partially completed unit ar-rives at the press to be worked on every 8 minutes, on average, according to an exponential distribution. Themachine operator can process an average of 10 parts perhour (Poisson distributed). Determine the average numberof parts waiting to be worked on, the percentage of timethe operator is working, and the percentage of time themachine is idle.arrow_forwardThe Delacroix Inn in Alexandria is a small exclusive hotelwith 20 rooms. Guests can call housekeeping from 8:00 A.M.to midnight for any of their service needs. Housekeepingkeeps one person on duty during this time to respond to guest calls. Each room averages 0.7 call per day to house-keeping (Poisson distributed), and a guest request requires an average response time of 30 minutes (exponentially dis-tributed) from the staff person. Determine the portion of time the staff person is busy and how long a guest must wait for his or her request to be addressed. Does the house-keeping system seem adequate?arrow_forwardLou operates a cab service specifically tailored to provide safe and comfortable transportation for seniors in his town. He owns five cabs, each staffed by a dedicated driver. Upon receiving a service call, Lou promptly dispatches one of these drivers to pick up the customer. The operational details are as follows: • Each driver takes an average of 15 minutes to arrive at the customer's location after being dispatched. • The journey from the customer's pickup location to their destination averages 25 minutes. • Lou’s service receives an average of 2.5 calls per hour. For analytical purposes, you can assume that both the arrival of service calls (demand) and the service times have coefficients of variation (CV) equal to 1. (a) What is the average waiting time for a customer from the moment they place a service call to Lou until a cab arrives to pick them up? (For answering this question carefully think about different stages of processes, and what a customer is doing in each stage. It…arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Inventory Management | Concepts, Examples and Solved Problems; Author: Dr. Bharatendra Rai;https://www.youtube.com/watch?v=2n9NLZTIlz8;License: Standard YouTube License, CC-BY