EBK PRINCIPLES OF OPERATIONS MANAGEMENT
11th Edition
ISBN: 9780135175644
Author: Munson
Publisher: VST
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 7.S, Problem 28P
a)
Summary Introduction
To determine: The break-even point in units for Proposal X.
b)
Summary Introduction
To determine: The break-even point in units for Proposal Y.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Wolfgang Kersten Mfg. intends to increase capacitythrough the addition of new equipment. Two vendors havepresented proposals. The fixed costs for proposal X are $150,000,and for proposal Y, Sl70,000. The variable cost for X is $120.00,and for Y, $100.00. The revenue generated by each unit is $200.00.a) What is the break-even point in units for proposal X?b) What is the break-even point in units for proposal Y?
Markland Manufacturing intends to increase capacity by overcoming a bottleneck operation byadding new equipment. Two vendors have presented proposals. The fixed costs for proposal A are$50,000, and for proposal B, $70,000. The variable cost for A is $12.00, and for B, $10.00. The revenuegenerated by each unit is $20.00.a) What is the break-even point in units for proposal A?b) What is the break-even point in units for proposal B?
Stapleton Manufacturing intends to increase capac-ity through the addition of new equipment. Two vendors have
presented proposals. The fixed cost for proposal A is $65,000, andfor proposal B, $34,000. The variable cost for A is $10, and for B,$14. The revenue generated by each unit is $18.
a) What is the crossover point in units for the two options?b) At an expected volume of 8,300 units, which alternative shouldbe chosen?
Chapter 7 Solutions
EBK PRINCIPLES OF OPERATIONS MANAGEMENT
Ch. 7.S - Prob. 1DQCh. 7.S - Prob. 2DQCh. 7.S - Prob. 3DQCh. 7.S - Prob. 4DQCh. 7.S - Prob. 5DQCh. 7.S - Distinguish between bottleneck time and throughput...Ch. 7.S - Prob. 7DQCh. 7.S - Prob. 8DQCh. 7.S - Prob. 9DQCh. 7.S - Prob. 10DQ
Ch. 7.S - Prob. 11DQCh. 7.S - Prob. 12DQCh. 7.S - What are the techniques available to operations...Ch. 7.S - Amy Xias plant was designed to produce 7,000...Ch. 7.S - For the post month, the plant in Problem S7.1,...Ch. 7.S - Prob. 3PCh. 7.S - Prob. 4PCh. 7.S - Prob. 5PCh. 7.S - The effective capacity and efficiency for the next...Ch. 7.S - Southeastern Oklahoma State Universitys business...Ch. 7.S - Prob. 8PCh. 7.S - Prob. 9PCh. 7.S - Prob. 10PCh. 7.S - The three-station work cell illustrated in Figure...Ch. 7.S - The three-station work cell at Pullman Mfg., Inc....Ch. 7.S - The Pullman Mfg., Inc., three-station work cell...Ch. 7.S - Prob. 14PCh. 7.S - 10 minutes per unit. Part 2 is simultaneously...Ch. 7.S - Prob. 16PCh. 7.S - Prob. 17PCh. 7.S - Using the data in Problem S7.17: a) What is the...Ch. 7.S - Prob. 19PCh. 7.S - Prob. 20PCh. 7.S - Prob. 21PCh. 7.S - Prob. 22PCh. 7.S - Prob. 23PCh. 7.S - Prob. 24PCh. 7.S - Prob. 25PCh. 7.S - Prob. 26PCh. 7.S - Prob. 27PCh. 7.S - Prob. 28PCh. 7.S - Prob. 29PCh. 7.S - Prob. 30PCh. 7.S - Prob. 31PCh. 7.S - Prob. 32PCh. 7.S - Prob. 33PCh. 7.S - Prob. 34PCh. 7.S - Prob. 35PCh. 7.S - Prob. 36PCh. 7.S - Prob. 37PCh. 7.S - Prob. 38PCh. 7.S - Prob. 39PCh. 7.S - Prob. 40PCh. 7.S - Prob. 41PCh. 7.S - Prob. 42PCh. 7.S - Prob. 43PCh. 7.S - Prob. 44PCh. 7.S - Prob. 45PCh. 7.S - Prob. 1VCCh. 7.S - a capacity expansion plan and a new 11-story...Ch. 7.S - a capacity expansion plan and a new 11-story...Ch. 7 - Ethical Dilemma For the sake of efficiency and...Ch. 7 - Prob. 1DQCh. 7 - Prob. 2DQCh. 7 - Prob. 3DQCh. 7 - Prob. 4DQCh. 7 - Prob. 5DQCh. 7 - Prob. 6DQCh. 7 - Prob. 7DQCh. 7 - Prob. 8DQCh. 7 - Prob. 9DQCh. 7 - Prob. 10DQCh. 7 - Prob. 11DQCh. 7 - Prob. 12DQCh. 7 - Prob. 13DQCh. 7 - Prob. 14DQCh. 7 - Prob. 15DQCh. 7 - Prob. 16DQCh. 7 - Prob. 17DQCh. 7 - Prob. 18DQCh. 7 - Prob. 19DQCh. 7 - Prob. 1PCh. 7 - Usingthedatain Problem 7.1, determinethemost...Ch. 7 - Prob. 3PCh. 7 - Refer to Problem 7.1. If a contract for the second...Ch. 7 - Stan Fawcetts company is considering producing a...Ch. 7 - Prob. 6PCh. 7 - Prob. 7PCh. 7 - Prob. 8PCh. 7 - Metters Cabinets, Inc., needs to choose a...Ch. 7 - Prob. 10PCh. 7 - Nagle Electric. Inc., of Lincoln, Nebraska, must...Ch. 7 - Stapleton Manufacturing intends to increase...Ch. 7 - Prepare a flowchart for one of the following: a)...Ch. 7 - Prepare a process chart for one of the activities...Ch. 7 - Prob. 15PCh. 7 - Prob. 16PCh. 7 - Prob. 17PCh. 7 - Prob. 1CSCh. 7 - Prob. 2CSCh. 7 - Prob. 3CSCh. 7 - Process Strategy at Wheeled Coach Wheeled Coach,...Ch. 7 - Prob. 1.2VCCh. 7 - Prob. 1.3VCCh. 7 - Prob. 1.4VCCh. 7 - Alaska Airlines: 20-Minute Baggage...Ch. 7 - Prob. 2.2VCCh. 7 - Prob. 2.3VCCh. 7 - Prob. 2.4VCCh. 7 - Prob. 2.5VCCh. 7 - Prob. 3.1VCCh. 7 - Prob. 3.2VCCh. 7 - Prob. 3.3VCCh. 7 - Prob. 3.4VC
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- example question 11a. please show solution. thank youarrow_forward1. Develop a level production plan for Covolo Diving Gear. What are the advantages and disadvantages of this plan? Could Covolo implement a pure chase plan, given the current capacity? Why? If sales continue to grow, what are the implications for production capacity at Covolo?arrow_forwardPhoto attachedarrow_forward
- Stapleton Manufacturing intends to increase capacity through the addition of new equipment. Two vendors have presented proposals. The fixed cost for proposal A is $65,000, and for proposal B, $34,000. The variable cost for A is $10, and for B, $14. The revenue generated by each unit is $18.a) What is the crossover point in units for the two o ptions?b) At an expected volume of8,300 units, which alternative shouldbe chosen?arrow_forwardMarkland Manufacturing intends to increase capac-ity by overcoming a bottleneck operation by adding new equip-ment. Two vendors have presented proposals. The fixed costs for proposal A are $50,000, and for proposal B, $70,000. The variablecost for A is $12.00, and for B, $10.00. The revenue generated byeach unit is $20.00.a) What is the break-even point in units for proposal A?b) What is the break-even point in units for proposal B?arrow_forwardCortez Manufacturing intends to increase capacity by overcoming a bottleneck operation by adding new equipment. Two vendors have presented proposals. The fixed costs are $50,000 for proposal A and $75,000 for proposal B. In addition to the proposed fixed costs from the two ve management at Cortez anticipates that they will have to spend $8,000 for installations be completed. The variable cost is $12.00 for A and $11.00 for B. The revenue generated by each unit is $24.00. a) The break-even point in dollars for the proposal by Vendor A = $ (round your response to the nearest whole number). b) The break-even point in dollars for the proposal by Vendor B = $| (round your response to the nearest whole number).arrow_forward
- Aria Acoustics, Incorporated (AAI), projects unit sales for a new seven-octave voice emulation implant as follows: Year Unit Sales 1 74,200 2 87,200 3 106,500 4 98,800 5 67,900 Production of the implants will require $1,800,000 in net working capital to start and additional net working capital investments each year equal to 20 percent of the projected sales increase for the following year. Total fixed costs are $3,800,000 per year, variable production costs are $261 per unit, and the units are priced at $393 each. The equipment needed to begin production has an installed cost of $17,700,000. Because the implants are intended for professional singers, this equipment is considered industrial machinery and thus qualifies as seven-year MACRS property. In five years, this equipment can be sold for about 25 percent of its acquisition cost. The tax rate is 21 percent and the required return is 18 percent. MACRS schedule What is the NPV of the project? Note: Do not round…arrow_forwardCourse:Engineering Managementarrow_forward"I'm not sure we should lay out $265,000 for that automated welding machine," said Jim Alder, president of the Superior Equipment Company. "That's a lot of money, and it would cost us $78,000 for software and installation, and another $40,800 per year just to maintain the thing. In addition, the manufacturer admits it would cost $41,000 more at the end of three years to replace worn-out parts." "I admit it's a lot of money," said Franci Rogers, the controller. “But you know the turnover problem we’ve had with the welding crew. This machine would replace six welders at a cost savings of $108,000 per year. And we would save another $6,900 per year in reduced material waste. When you figure that the automated welder would last for six years, I'm sure the return would be greater than our 19% required rate of return." "I'm still not convinced," countered Mr. Alder. "We can only get $14,000 scrap value out of our old welding equipment if we sell it now, and in six years the new machine will…arrow_forward
- 4 - Smithson Cutting is opening a new line of scissors for supermarket distribution. It estimates its fixedcost to be $500.00 and its variable cost to be $0.50 per unit. Selling price is expected to average $0.75per unit.a) What is Smithson’s break-even point in units?b) What is the break-even point in dollars?arrow_forward41. A manager is going to purchase new processing equipment and must decide on the number of spare parts to order with the new equipment. The spares cost $200 each, and any unused spares will have an expected salvage value of $50 each. The probability of usage can be described by this distribution: Number 0 1 2 3 Probability .10 .50 .25 .15 If a part fails and a spare is not available, two days will be needed to obtain a replacement and install it. The cost for idle equipment is $500 per day. What quantity of spares should be ordered? Page 553 a. Use the ratio method. b. Use the tabular method (see Table 12.3).arrow_forwardStapleton Manufacturing intends to increasecapacity through the addition of new equipment. Two vendors have presented proposals. The fixed cost for proposal A is$65,000, and for proposal B, $34,000. The variable cost for A is$10, and for B, $14. The revenue generated by each unit is $18.a) What is the crossover point in units for the two options?b) At an expected volume of 8,300 units, which alternativeshould be chosen?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Inventory Management | Concepts, Examples and Solved Problems; Author: Dr. Bharatendra Rai;https://www.youtube.com/watch?v=2n9NLZTIlz8;License: Standard YouTube License, CC-BY