Concept explainers
(a)
Interpretation: The control charts are to be drawn based on the given data.
Concept Introduction:
The control chart is used to determine the changes in the process over the time. The control chart consists three lines which are upper control limit line, lower control limit line and central line.
(b)
Interpretation: The values of the Cp and pic for the initial capability study are to be determined.
Concept Introduction:
The control chart is used to determine the changes in the process over the time. The control chart consists three lines which are upper control limit line, lower control limit line and central line.
(c)
Interpretation: The values of the Cp and Cpk after the improvements are to be determined.
Concept Introduction:
The control chart is used to determine the changes in the process over the time. The control chart consists three lines which are upper control limit line, lower control limit line and central line.
(d)
Interpretation: The values of the Cp and Cpk are to be determined when the process is centered at 166.
Concept Introduction:
The control chart is used to determine the changes in the process over the time. The control chart consists three lines which are upper control limit line, lower control limit line and central line.
Want to see the full answer?
Check out a sample textbook solutionChapter 3 Solutions
OPERATIONS MANAGEMENT CUSTOM ACCESS
- Explain what might cause a process to be out of control in managing quality ?arrow_forwardSan Angelo Manufacturing Company was concerned about a growing number of defective units being produced. At one time, the company had the percentage of defective units down to less than five per thousand, but recently rates of defects have been near, or even above, 1%. The company decided to graph its defects for the last 8 weeks (40 working days), beginning Monday, September 1 through Friday, October 24. The graph is as attached Identify two important trends evident in the quality-control chart. What might management of San Angelo do to deal with each trend?arrow_forwardAn explanation of importance of the quality and identification of atleast one cost of quality for each category of costs of quality.arrow_forward
- Six sigma is considered a symbol of quality. Identify the areas it focuses to acheive quality. Explain the statistical concept using illustrations.arrow_forwardA shirt manufacturer buys cloth by the 100-yard roll from a supplier. For setting up a control chart to manage the irregularities (e.g., loose threads and tears), the following data were collected from a sample provided by the supplier. SAMPLE 1 2 3 4 5 6 7 8 9 10 IRREGULARITIES 3 5 2 6 5 4 6 3 4 5 Determine the c¯�¯ , Sc�� , UCL and LCL for a c-chart with z = 2. Note: Round your answers to 2 decimal places. Suppose the next five rolls from the supplier had three, two, five, three, and seven irregularities. Is the supplier process under control? multiple choice Yes Noarrow_forwardExercise : Control chart for X-R variablesThe data shown in the table represent the internal diameters (mm) of automobile engine piston rings.Each sample is made up of five parts and a total of 25 samples were collected. a) Construct limits and control charts for this critical quality characteristic. Is the process statistically controlled? b) If the product specifications are 74,000 +/- 0.05, determine the ability of the process to meet these specifications. Sample observations1 74.03 74.002 74.019 73.992 74.0082 73.995 73.992 74.001 74.011 74.0043 73.988 74.024 74.021 74.005 74.0024 74.002 73.996 73.993 74.015 74.0095 73.992 74.007 74.015 73.989 74.0146 74.009 73.994 73.997 73.985 73.9937 73.995 74.006 73.994 74.000 74.0058 73.985 74.003 73.993 74.015 73.9889 74.008 73.995 74.009 74.005 74.00410 73.998 74.000 73.99 74.007…arrow_forward
- Describe a situation where a control chart is the right tool for quality conformance. If you were a Quality Manager, would you be an advocate for the use of control charts? Why or why not?arrow_forward1. Differentiate the two schools of thought relating to the cost of quality: traditional (ECM) and TQM perspectives based on the role of variations and process inspection approach. 2. How are outcome variations related to prevention and appraisal costs? 3. Which parameters are required to compute process capability?arrow_forwardThe manager of the customer service department of Data Tech Credit Card Service Company is concerned about the number of defects produced by the billing process. Every day a random sample of 250 statements was inspected for errors regarding incorrect entries involving account numbers, transactions on the customer’s account, interest charges, and penalty charges. Any statement with one or more of these errors was considered a defect. The study lasted 30 days and yielded the data in Table. Sample Data For Data Tech Credit Card Service Samples Number of Errors in Sample of 250 1–10 3 8 5 11 7 1 12 9 0 8 11–20 3 5 7 9 11 3 2 9 13 4 21–30 12 10 6 2 1 7 10 5 8 4 a. Construct a p-chart for the billing process.b. Is there any nonrandom behavior in the billing process that would require management attention?arrow_forward
- Write, in your own words, what is the objective of the Statement of Quality Control Standard number 8 (SQCS No. 8)arrow_forwardExplain what are the requirements of the well designed quality control system?arrow_forwardExplain the acceptable quality level and lo tolerance percentage defective and also explain how they are used in managing quality ?arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.