Concept explainers
A
Interpretation: A process chart for the given information in the production involved should be plotted.
Concept Introduction: A flowchart is a diagrammatic representation of a step-by-step approach involved in the workflow or process.
B
Interpretation: The total labor cost that can be incurred under this process should be determined.
Concept Introduction: A flowchart is a diagrammatic representation of a step-by-step approach involved in the workflow or process.
C
Interpretation: A process chart for the given information in the production involved should be plotted.
Concept Introduction: A flowchart is a diagrammatic representation of a step-by-step approach involved in the workflow or process.
Want to see the full answer?
Check out a sample textbook solutionChapter 2 Solutions
Operations Management: Processes and Supply Chains, Student Value Edition Plus MyLab Operations Management with Pearson eText -- Access Card Package (12th Edition)
- A call centre that handles customer service telephone calls is monitored by information system that collects data on the number of calls each representative received and the length of time each representative took to answer each call and then to respond to the question or request for service. Managers at the call centre can easily obtain statistics on virtually any part of the process. And data collection is built into the system, making it unintrusive. Obviously, the manager‟s goal is to make sure all calls are answered quickly and that customers are satisfied. Information from the system can then be used in a variety of ways. For instance, a manager can use the information from the system to compare a worker‟s output to that of his colleagues, to his own earlier output, to historical outputs reflecting similar work conditions at other times. He can evaluate the number and duration of calls service representatives answer on a given day. 1. Rationally, what are the…arrow_forwardAnswer 23 pleasearrow_forwardCreate a swim-lane process map for placing and receiving an order at a fast food restaurant. Please choose a restaurant where you can see the food being prepared (e.g Panera Bread, McDonalds, Arbys, Subway, Taco Bell, etc.). > Your process map will have three swim-lanes: you, cashier (taking your order), and cook (preparing food). You do not need to include any metrics (times, distances, etc.).arrow_forward
- A process has seven elements composed of combination of worker and machine. Elements A, B, D, and F are worker-controlled while elements C and E are machine controlled. Element G is a worker-controlled irregular element performed every five cycles Machines are idle during elements A, D, and G. Two units are produced every cycle. Below are the observed time (in minutes) and performance rating of each element. Work Element Observed Time (in minutes) Performance Rating A 0.75 115% B 1.20 120% C 1.40 N.A. D 1.05 90% E 1.25 N.A. F 1.20 105% G 1.60 85% Worker's allowance is 20% a) Determine Normal Time . Answer in 4 decimal placesb) What is the standard time? Round up answer in 2 decimal places.c) If the worker's performance during actual production is 125% on all manual elements for seven hours worked on an eight-hour shift, how many units will be produced? Round up answer in integer value.d) Determine the worker's efficiency (in percentage). Answer in 2 decimal placesarrow_forwardWellplace Insurance Company processes insurance policy applications in batches of 25. One day, they had fifteen batches to process and, after inspection, it was found that four batches had nonconforming policies. One batch had one nonconformance, another had five, another had two, and another had six nonconformance. a. What was the proportion nonconforming for each batch? Round your answers to two decimal places. The proportion nonconforming for the first batch: The proportion nonconforming for the second batch: The proportion nonconforming for the third batch: The proportion nonconforming for the fourth batch: b. What was the nonconformance per unit (NPU) in total for the fifteen batches? Round your answer to three decimal places. Total nonconformances per unit for all batches:arrow_forwardCan a process be frozen in the midst of another process it is executing? Provide justifications for your answers, please.arrow_forward
- Describe how THE PROCESS DIAGRAM BELOW they could be improved and make recommendations for their improvement.arrow_forwardLa Trobe university hire you as a consultant to model the student enrolment process using BPMN. Note, during the enrolment process student will select units of study (subjects), confirm their financial liability, upload a photo for a student card and complete other required administrative tasks. Your task is to model the process using BPMN.arrow_forwardWellplace Insurance Company processes insurance policy applications in batches of 25. One day, they had fifteen batches to process and, after inspection, it was found that four batches had nonconforming policies. One batch had four nonconformances, another had eight, another had one, and another had five nonconformance. a. What was the proportion nonconforming for each batch? Round your answers to two decimal places. The proportion nonconforming for the first batch: The proportion nonconforming for the second batch: The proportion nonconforming for the third batch: The proportion nonconforming for the fourth batch: b. What was the nonconformance per unit (NPU) in total for the fifteen batches? Round your answer to three decimal places. Total nonconformances per unit for all batches:arrow_forward
- There are two aspects to process management: procedures and developing such key competencies as process capability, flexibility, capacity, and cost efficiency. In the long-run, it also involves process improvement aimed at producing and delivering products that will satisfy targeted customer needs better. and process control. The first aspect involves structuring the process, designing operating Select one: a. product improvement b. process planning C. process improvement d. product planning A computer repair service has a design capacity of 80 repairs per day. Its effective capacity, however, is 74 repairs per day, and its actual output is 62 repairs per day. What is the utilization of the computer repair service? Select one: a. 80% b. 78% C. 84% d. 93%arrow_forwardConsider the range of processes in the financial services industry. What position on the customer-contact matrix would the process of selling financial services to municipalities occupy? The process of preparing monthly fund balance reports? Explain why they would differ.arrow_forwardIf you don't provide an adequate response, the experts will downvote your answer. What exactly is meant by the term "process framework"? In the process models, what are the five general actions that take place?arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,