Concept explainers
a)
To determine: The change in the items due to the change in the lead time of item G.
Introduction:
Net requirements plan:
The Net requirements plan is the plan which is established on the Gross requirements plan formed by deducting the stock on and the
b)
To determine: The implications of the production plan because of change in the lead time of item G.
Introduction:
Net requirements plan:
The Net requirements plan is the plan which is established on the Gross requirements plan formed by deducting the stock on and the Scheduled receipts. If the total requirement is below the safety stock levels, a planned order is made based on the given lot sizing technique.
c)
To determine: The options the
Want to see the full answer?
Check out a sample textbook solutionChapter 14 Solutions
EBK PRINCIPLES OF OPERATIONS MANAGEMENT
- The Betterbilt Construction Company designs and builds residential mobile homes. Thecompany is ready to construct, in sequence, 16 new homes of 2,400 square feet each. Thesuccessful bid for the construction materials in the first home is $64,800, or $27 per square foot.The purchasing manager believes that several actions can be taken to reduce material costs by8% each time the number of homes constructed doubles. Based on this information,a. What is the estimated cumulative average material cost per square foot for the first fivehomes?b. What is the estimated material cost per square foot for the last (16th) home?arrow_forwardRefer to this product tree If 17 Ps are needed, and no on-hand inventory exists for any items, how many Cs will be needed?arrow_forwardDraw an approximate bill-of-materials (BOM) for a kid’s toy of your choice following these requirements: I would like to use the Jollibee plush Bee toy. (a) clearly label the end item and each component, (b) the BOM must contain no more than 20 items, (c) the BOM must contain at least three levels (you may count the end-item level zero).arrow_forward
- An electric hand drill would take 15, 40, 10, 20, 50, and 30 units in the next 6 weeks. The marketing department has booked orders for the first, second, third, and fourth weeks for 20, 25, 10 and 20 units in all. Currently, there are 30 hand boxes in order. The strategy should be ordered in several 60 units. One week is lead period. Lead time. A. Develop the MPS hand drill log. b. A hand drill dealer puts an order for 15 units. What is the correct date of shipment for the whole order?arrow_forwardIn which product life cycle the scope, schedule, and cost are determined early, and changes to scope are carefully managed? 1) Iterative 2) Incremental 3) Predictive 4) Adaptivearrow_forwardNote:- Do not provide handwritten solution. Maintain accuracy and quality in your answer. Take care of plagiarism. Answer completely. You will get up vote for sure.arrow_forward
- Draw a simple bill-of-materials (BOM) for a smart phone given the following requirements: (a) clearly label the end item and each component, (b) the BOM must contain no more than ten items, (c) the BOM must contain at least three levels (you may count the end-item level zero).arrow_forwardComplete the following table. Lead time for the part is 2 weeks, and the order quantity is 50. What action should be taken?arrow_forwardUsing the information in(You need to schedule I0 units of product Alpha fordelivery in 6 weeks. Three units of D and 2 units ofF are requiredfor each Alpha. The lead time for Alpha is I week. Lead time forD is I week, and lead time for F is 2 weeks.a) Construct a product structure.b) Prepare a time-phased product structure.c) Prepare a gross requirements plan for Alpha. ), construct a netmaterial requirements plan. There are 2 Alphas on hand and 4 Ds.arrow_forward
- 6) Product M is made of 2 units of N & 3 of P. N is made of 2 units of R & 4 units of S. R is made of 1 unit of S & 3 units of T. P is made of 2 units of T & 4 units of U. LT are 1 week except for level 2 items which is 2 weeks. On hand are: P = 50 and S = 125 units. a) Show the product structure tree. b) If 100 M are required at the start of week 7, develop a planning schedule showing when each item should be ordered and in what quantity? Use lot for lot except for R & U which uses multiples of 250.arrow_forwardPlease do not give solution in image formate thanku. WATCH MOVIE GUNG HO After you have watched it, please answer the following questions: 1. Overview of the general concept of the movie? 2. What were the mission and vision/long-term goals of Assan Motors? 3. What is the Zero Defects philosophy? 4. Why does the focus on quantity and deadlines not work well? Should companies that use a total quality management system set deadlines or quantities? Would not it hurt quality? 5. Emphasize the main cultural differences between the two organizations. 6. What was surprising in the movie? 7. Identify problems, causes of problems, solutions presented by the movie, and your suggestionsarrow_forwardAdidas is an athletic company designs and manufacturesseveral athletic things. Football is one of the company'sproducts that sells for $40 per unit. Total fixed costs relatedto the manufacturing of the football are $150,000 per monthand variables costs involved in manufacturing are $ 15 perunit. 1- Compute the break- even point of the football in unitsand dollars?arrow_forward