Chapter 10, Problem 40P

a)

Summary Introduction

To calculate: The normal time of the operation.

b)

Summary Introduction

To calculate: The allowance factor and standard time of the operation.

Blurred answer
Students have asked these similar questions
The snapback timing method was used to obtain the average times and performance ratings for work elements in a manual repetitive task. (See table below). All elements are worker-controlled and were performance rated at 80%. Element e is an irregular element performed every five cycles. A 15% allowance for personal time, fatigue, and delays isapplied to the cycle. Determine (a) the normal time and (b) the standard time for this cycle. If the worker’s performance during actual production is 120% on all manual elements for 7 actual hours worked on an 8-hour shift, (c) how many units will be produced
The results of a time study to perform a quality control test are shown in the following table: *Disregard employee is smoking a cigarette (included in personal time). The allowance factor is given to be 25%. a) The normal time for the complete operation = b) The standard time for this process = Performance Observation (minutes per cycle) Element Rating 1 2 3 4 5 1 95% 1.5 1.8 23 2 110% 0.8 0.5 90% 0.5 0.4 4 85% 0.6 0.9 8549 1.8 1.9 1.4 0.6 3.7* 0.6 0.6 0.4 0.4 0.7 0.7 0.7 minutes (round your response to two decimal places). minutes (round your response to two decimal places).
How many work cycles should be timed to estimate the average cycle time to within 2 percent ofthe sample mean with a confidence of 99 percent if a pilot study yielded these times (minutes):5.2, 5.5, 5.8, 5.3, 5.5, and 5.1? The standard deviation is .253 minutes per cycle.
Knowledge Booster
Background pattern image
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Text book image
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Text book image
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Text book image
Business in Action
Operations Management
ISBN:9780135198100
Author:BOVEE
Publisher:PEARSON CO
Text book image
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Text book image
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.