a)
To determine: The standard time for the operation
Introduction: Time study is the basis that helps set the standard time; it would time a sample of the performance of the worker.
a)

Answer to Problem 29P
Thestandard time is calculated as 85.56 seconds.
Explanation of Solution
Given information:
The allowance factor is given as 23%. The observed time and performance rating for each element is given as follows:
Element | Performance rating | Observation (seconds) | ||||
1 | 2 | 3 | 4 | 5 | ||
Grasp and place bag | 110% | 8 | 9 | 8 | 11 | 7 |
Fill bag | 85% | 36 | 41 | 39 | 35 | 112a |
Seal bag | 105% | 15 | 17 | 13 | 20 | 18 |
Place bag on conveyor | 90% | 8 | 6 | 9 | 30b | 35b |
a refers to the bag breaking open
b refers to the conveyor getting jammed
Formulae to calculate standard time:
Calculate normal time:
Element | Performance rating | Observation (seconds) | Average time | Normal time | ||||
1 | 2 | 3 | 4 | 5 | ||||
Grasp and place bag | 110% | 8 | 9 | 8 | 11 | 7 | 8.6 | 9.46 |
Fill bag | 85% | 36 | 41 | 39 | 35 | 112a | 37.75 | 32.0875 |
Seal bag | 105% | 15 | 17 | 13 | 20 | 18 | 16.6 | 17.43 |
Place bag on conveyor | 90% | 8 | 6 | 9 | 30b | 35b | 7.67 | 6.9 |
Calculate the average time to grasp and place bag:
The average time is calculated by taking an average of the observation given, which is the summation of 8, 9, 8, 11, and 7 and dividing the result by 5. Hence, the average is 8.6 seconds.
Calculate the average time to fill bag:
The average time is calculated by taking an average of the observation given, which is the summation of 36, 41, 39, and 35 and dividing the result by 4. Hence, the average is 37.75 seconds.
Note: The observation with (Xa) should not be considered while calculating the average time.
Calculate the average time to seal bag:
The average time is calculated by taking an average of the observation given, which is the summation of 15, 17, 13, 20, and 18 and dividing the result by 5. Hence, the average is 16.6 seconds.
Calculate the average time to place bag on conveyor:
The average time is calculated by taking an average of the observation given, which is the summation of 8, 6, and 9 and dividing the result by 3. Hence, the average is 7.67 seconds.
Note: The observations with (Xa and Xb) should not be considered while calculating the average time.
Calculate the normal time to grasp and place bag:
The normal time is calculated by multiplying average time and performance rating. Average time is calculated as 8.60 seconds, and performance rating is given as 110%. Hence, the normal time is 9.46 seconds.
Calculate the normal time fill bag:
The normal time is calculated by multiplying average time and performance rating. Average time is calculated as 37.75 seconds, and performance rating is given as 85%. Hence, the normal time is 32.09 seconds.
Calculate the normal time to seal bag:
The normal time is calculated by multiplying average time and performance rating. Average time is calculated as 16.60 seconds, and performance rating is given as 105%. Hence, the normal time is 17.43 seconds.
Calculate the normal time to place bag on conveyor:
The normal time is calculated by multiplying average time and performance rating. Average time is calculated as 7.67 seconds, and performance rating is given as 90%. Hence, the normal time is 6.90 seconds.
Calculate the total normal time:
The normal time is calculated by adding the normal time to grasp and place bag, fill bag, seal bag, and place bag on conveyor.
Hence, the total normal time is 65.88 seconds.
Calculate the standard time:
The standard time is calculated by dividing normal time with the value attained by subtracting allowance factor from 1. Normal time is calculated as 65.88 seconds and allowance factor is calculated as 23%
Hence, standard time is 85.56 seconds.
b)
To determine: The number of sample sizes required.
Introduction: Thesample size is required to determine the number of observations that are necessary to find the true cycle time.
b)

Answer to Problem 29P
Thesample size to grasp and place bag is 83, to fill bag is 14, to seal bag is 70, and to place bag on conveyor is 107 samples.
Explanation of Solution
Given information:
Confidence level is 99% and accuracy is ±5%.
Element | Performance rating | Observation (seconds) | ||||
1 | 2 | 3 | 4 | 5 | ||
Grasp and place bag | 110% | 8 | 9 | 8 | 11 | 7 |
Fill bag | 85% | 36 | 41 | 39 | 35 | 112a |
Seal bag | 105% | 15 | 17 | 13 | 20 | 18 |
Place bag on conveyor | 90% | 8 | 6 | 9 | 30b | 35b |
Formula to determine the required number of observations:
n refers to the number of observations required
z refers to the table value for confidence level
s refers to the standard deviation
h refers to accuracy level
x(bar) refers to the average observed time
Determine the proper number of observations required:
Element | Mean observed time | s | Sample |
Grasp and place bag | 8.6 | 1.52 | 8 |
Fill bag | 37.75 | 2.75 | 14 |
Seal bag | 16.6 | 2.7 | 70 |
Place bag on conveyor | 7.67 | 1.54 | 107 |
Calculate the standard deviation to grasp and place bag:
The standard deviation can be calculated by dividing two values. The first value can be calculated by adding the square of the value attained by subtracting the mean observed value from each observation. The second value can be attained by subtracting 1 from the number of samples and the result should be square rooted. The standard deviation to grasp and place bag is 1.52.
Calculate the standard deviation to fill bag:
The standard deviation can be calculated by dividing two values. The first value can be calculated by adding the square of the value attained by subtracting the mean observed value from each observation. The second value can be attained by subtracting 1 from the number of samples and the resultant should be square rooted. The standard deviation to fill bag is 2.75.
Calculate the standard deviation to seal bag:
The standard deviation can be calculated by dividing two values. The first value can be calculated by adding the square of the value attained by subtracting the mean observed value from each observation. The second value can be attained by subtracting 1 from the number of samples and the resultant should be square rooted. The standard deviation to seal bag is 1.
Calculate the standard deviation to place bag on conveyor:
The standard deviation can be calculated by dividing two values. The first value can be calculated by adding the square of the value attained by subtracting the mean observed value from each observation. The second value can be attained by subtracting 1 from the number of samples and the resultant should be square rooted. The standard deviation to place bag on conveyor is 1.54.
Calculate the
It is calculated by multiplying the z value of 2.58, the standard deviation that is given as 1.52, and dividing the result with the multiple of the accuracy level and average observed time that is given as 0.05 and 8.6, respectively. Hence, the required number of observations is 83 samples.
Calculate the sample size to fill bag:
It is calculated by multiplying the z value of 2.58, the standard deviation that is given as 2.75, and dividing the result with the multiple of the accuracy level and average observed time that is given as 0.05 and 37.75, respectively. Hence, the required number of observations is 14 samples.
Calculate the sample size to seal bag:
It is calculated by multiplying the z value of 2.58, the standard deviation that is given as 2.7, and dividing the result with the multiple of the accuracy level and average observed time that is given as 0.05 and 16.6, respectively. Hence, the required number of observations is 70 samples.
Calculate the sample size to place bag on conveyor:
It is calculated by multiplying the z value of 2.58, the standard deviation that is given as 1.54, and dividing the resultant with the multiple of the accuracy level and average observed time that is given as 0.05 and 7.67, respectively. Hence, the required number of observations is 107 samples.
Hence, the standard time for the process is 85.56 seconds. Sample size to grasp and place bag is 83, to fill bag is 14, seal bag is 70, and to place bag on conveyor is 107 samples.
Want to see more full solutions like this?
Chapter 10 Solutions
EBK PRINCIPLES OF OPERATIONS MANAGEMENT
- Sarah Anderson, the Marketing Manager at Exeter Township's Cultural Center, is conducting research on the attendance history for cultural events in the area over the past ten years. The following data has been collected on the number of attendees who registered for events at the cultural center. Year Number of Attendees 1 700 2 248 3 633 4 458 5 1410 6 1588 7 1629 8 1301 9 1455 10 1989 You have been hired as a consultant to assist in implementing a forecasting system that utilizes various forecasting techniques to predict attendance for Year 11. a) Calculate the Three-Period Simple Moving Average b) Calculate the Three-Period Weighted Moving Average (weights: 50%, 30%, and 20%; use 50% for the most recent period, 30% for the next most recent, and 20% for the oldest) c) Apply Exponential Smoothing with the smoothing constant alpha = 0.2. d) Perform a Simple Linear Regression analysis and provide the adjusted…arrow_forwardRuby-Star Incorporated is considering two different vendors for one of its top-selling products which has an average weekly demand of 70 units and is valued at $90 per unit. Inbound shipments from vendor 1 will average 390 units with an average lead time (including ordering delays and transit time) of 4 weeks. Inbound shipments from vendor 2 will average 490 units with an average lead time of 2 weeksweeks. Ruby-Star operates 52 weeks per year; it carries a 4-week supply of inventory as safety stock and no anticipation inventory. Part 2 a. The average aggregate inventory value of the product if Ruby-Star used vendor 1 exclusively is $enter your response here.arrow_forwardSam's Pet Hotel operates 50 weeks per year, 6 days per week, and uses a continuous review inventory system. It purchases kitty litter for $13.00 per bag. The following information is available about these bags: > Demand 75 bags/week > Order cost = $52.00/order > Annual holding cost = 20 percent of cost > Desired cycle-service level = 80 percent >Lead time = 5 weeks (30 working days) > Standard deviation of weekly demand = 15 bags > Current on-hand inventory is 320 bags, with no open orders or backorders. a. Suppose that the weekly demand forecast of 75 bags is incorrect and actual demand averages only 50 bags per week. How much higher will total costs be, owing to the distorted EOQ caused by this forecast error? The costs will be $higher owing to the error in EOQ. (Enter your response rounded to two decimal places.)arrow_forward
- Yellow Press, Inc., buys paper in 1,500-pound rolls for printing. Annual demand is 2,250 rolls. The cost per roll is $625, and the annual holding cost is 20 percent of the cost. Each order costs $75. a. How many rolls should Yellow Press order at a time? Yellow Press should order rolls at a time. (Enter your response rounded to the nearest whole number.)arrow_forwardPlease help with only the one I circled! I solved the others :)arrow_forwardOsprey Sports stocks everything that a musky fisherman could want in the Great North Woods. A particular musky lure has been very popular with local fishermen as well as those who buy lures on the Internet from Osprey Sports. The cost to place orders with the supplier is $40/order; the demand averages 3 lures per day, with a standard deviation of 1 lure; and the inventory holding cost is $1.00/lure/year. The lead time form the supplier is 10 days, with a standard deviation of 2 days. It is important to maintain a 97 percent cycle-service level to properly balance service with inventory holding costs. Osprey Sports is open 350 days a year to allow the owners the opportunity to fish for muskies during the prime season. The owners want to use a continuous review inventory system for this item. Refer to the standard normal table for z-values. a. What order quantity should be used? lures. (Enter your response rounded to the nearest whole number.)arrow_forward
- In a P system, the lead time for a box of weed-killer is two weeks and the review period is one week. Demand during the protection interval averages 262 boxes, with a standard deviation of demand during the protection interval of 40 boxes. a. What is the cycle-service level when the target inventory is set at 350 boxes? Refer to the standard normal table as needed. The cycle-service level is ☐ %. (Enter your response rounded to two decimal places.)arrow_forwardOakwood Hospital is considering using ABC analysis to classify laboratory SKUs into three categories: those that will be delivered daily from their supplier (Class A items), those that will be controlled using a continuous review system (B items), and those that will be held in a two bin system (C items). The following table shows the annual dollar usage for a sample of eight SKUs. Fill in the blanks for annual dollar usage below. (Enter your responses rounded to the mearest whole number.) Annual SKU Unit Value Demand (units) Dollar Usage 1 $1.50 200 2 $0.02 120,000 $ 3 $1.00 40,000 $ 4 $0.02 1,200 5 $4.50 700 6 $0.20 60,000 7 $0.90 350 8 $0.45 80arrow_forwardA part is produced in lots of 1,000 units. It is assembled from 2 components worth $30 total. The value added in production (for labor and variable overhead) is $30 per unit, bringing total costs per completed unit to $60 The average lead time for the part is 7 weeks and annual demand is 3800 units, based on 50 business weeks per year. Part 2 a. How many units of the part are held, on average, in cycle inventory? enter your response here unitsarrow_forward
- assume the initial inventory has no holding cost in the first period and back orders are not permitted. Allocating production capacity to meet demand at a minimum cost using the transportation method. What is the total cost? ENTER your response is a whole number (answer is not $17,000. That was INCORRECT)arrow_forwardRegular Period Time Overtime Supply Available puewag Subcontract Forecast 40 15 15 40 2 35 40 28 15 15 20 15 22 65 60 Initial inventory Regular-time cost per unit Overtime cost per unit Subcontract cost per unit 20 units $100 $150 $200 Carrying cost per unit per month 84arrow_forwardassume that the initial inventory has no holding cost in the first period, and back orders are not permitted. Allocating production capacity to meet demand at a minimum cost using the transportation method. The total cost is? (enter as whole number)arrow_forward
- Foundations of Business (MindTap Course List)MarketingISBN:9781337386920Author:William M. Pride, Robert J. Hughes, Jack R. KapoorPublisher:Cengage LearningFoundations of Business - Standalone book (MindTa...MarketingISBN:9781285193946Author:William M. Pride, Robert J. Hughes, Jack R. KapoorPublisher:Cengage Learning