STUDENT - KNOWLEDGE ASSESSMENT TASK Task Number 1 of 2 Task Name Knowledge Questions National unit code CPCCBC4009 National unit title Apply legal requirements to building and construction projects National qualification code CPC50220 National qualification title Diploma of Building and Construction (Building) RMIT Program code C5415 RMIT Course code BUIL6437C Section A - Assessment Information Duration and/or due date: Refer to CANVAS for due date Task Instructions Summary and Purpose of Assessment This is the first of two (2) assessment tasks you need to complete satisfactorily, in order to be assessed as competent in this unit. By completing this assessment, you will demonstrate the knowledge required to correctly apply legal requirements to building and construction projects involving residential and low-rise commercial buildings. Assessment Instructions What This is an individual assessment task involving a series of questions. You must answer all questions. How There are a total of fifteen (15) questions in this assessment. Answer ALL questions in the space provided. Where applicable, answer questions in in 30-50 words unless otherwise stated. Where This assessment will be carried out during class time under supervision. Additional Instructions for Students: Performance requirement: Satisfactory (S) performance - able to answer all questions correctly. Not Yet Satisfactory (NYS) performance - unable to answer all questions correctly. You need to achieve satisfactory (S) results in both assessments to be deemed Competent. Conditions for assessment This is an individual assessment task. Please ensure your full and correct name is written on this assessment task (do not use nicknames or abbreviations). You must complete the task within the maximum allowed duration as directed by the assessor. You can make arrangements with the assessor at least one week prior to the assessment due date if you [Knowledge Questions] [1 of 2] [13/04/2022] Student knowledge assessment task © Content is subject to copyright, RMIT University FINAL APPROVED – STUDENT KNOWLEDGE ASSESSMENT TASK TEMPLATE – June 2019_Version 2.0 Page 1 of 10 RMIT Classification: Trusted STUDENT
require special allowance or allowable adjustment to this task. Students found in breach of assessment conditions can be charged with academic misconduct, have their results cancelled, be excluded from the program and receive other penalties. Plagiarism is the presentation of the work, idea or creation of another person as though it is one’s own. It is a form of cheating and is a very serious academic offence that may lead to expulsion from the University. Plagiarised material can be drawn from, and presented in, written, graphic and visual form, including electronic data, and oral presentations. Plagiarism occurs when the origin of the material used is not appropriately cited. Students with a disability or long-term medical or mental health condition can apply for adjustments to their study and assessment conditions (Reasonable Adjustments and Equitable Assessment Arrangements) by registering with the Equitable Learning Services (ELS) at https://www.rmit.edu.au/students/support-services/equitable-learning If student already registered with ELS and his /her study plan is approved, please remind the student to inform the teacher if this assessment task is not adjusted in line with approved study plan. Student will be assessed as satisfactory or not yet satisfactory. Student can appeal the assessment decision according to the RMIT Assessment Appeal Processes RMIT special consideration is to enable student to maintain their academic progress despite adverse circumstances. You can access further information regarding assessment, including Recognition of Prior Learning , Reasonable Adjustment and Assessment Appeals . Instructions on submitting your knowledge assessment Complete all questions and submit to CANVAS by the due date provided. Equipment/resources students must supply: Equipment/resources to be provided by RMIT or the workplace: Laptop Onsite computer and internet access [Knowledge Questions] [1 of 2] [13/04/2022] Student knowledge assessment task © Content is subject to copyright, RMIT University FINAL APPROVED – STUDENT KNOWLEDGE ASSESSMENT TASK TEMPLATE – June 2019_Version 2.0 Page 2 of 10 RMIT Classification: Trusted STUDENT
Section B – Student Answer Sheet Student Name Student ID Students provide your responses in the boxes below each question Questions Satisfactory Y NYS Q1. In what situation/s must a builder be registered? A: builders must be registered or licensed to legally carry out certain types of building work however this may vary in states. Q2. Name and briefly describe the main classes of Builder Registration categories. (30-50 words each ) A: Commerical builder: Commercial builders allowed to undertake construction work on commercial, industrial, and institutional buildings. Commercial builders are typically involved in larger-scale projects Demolition builder: Builders that demolition work, which involves the dismantling or tearing down of structures Supervisor or site manager: supervisors are site managers responsible for overseeing and managing construction projects but may not physically perform the building work themselves. Q3. List five (5) types of Limited builder registration and describe when they are required to be registered. [Knowledge Questions] [1 of 2] [13/04/2022] Student knowledge assessment task © Content is subject to copyright, RMIT University FINAL APPROVED – STUDENT KNOWLEDGE ASSESSMENT TASK TEMPLATE – June 2019_Version 2.0 Page 3 of 10 RMIT Classification: Trusted STUDENT
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
Renovation Builder A renovation builder with limited registration is authorized to carry out renovation work on existing buildings. They are typically required when a builder specializes in renovation work and is not engage in new construction or other types of building projects. Kitchen and Bathroom Builder Builders who focus on the construction or renovation of kitchens and bathrooms, they covers tasks like installing fixtures, cabinetry, and related elements in these areas. Builders specializing in kitchen and bathroom projects may need this limited registration. Carpentry Builder A carpentry builder with limited registration is specifically trained and authorized to carry out carpentry work. They are responsible for framing, formwork, installing timber elements, and other carpentry-related activities. They are required for builders who primarily perform carpentry work and do not engage in other types of building activities. Deck and Patio Builder This limited registration category is for builders who specialize in the construction or renovation of decks and patios. Their task is like designing, building, and finishing outdoor living spaces. Their type of registration for Builders who primarily work on outdoor deck and patio projects may need this limited registration. Fencing Builder Fencing builders with limited registration are authorized to work related to the installation and construction of fences and enclosures. Their job is to measure, cut, and secure fencing materials. Fencing builder limited registration is typically required for builders who specialize in fencing projects and do not engage in other types of building work. Q4. What types of Trades are not required to be registered? List four (4) examples in your answer. A: Painter: There are usually no registration requirements for painters. They may, however, need to follow other local regulations regarding quality standards, environmental regulations, and safety regulations. [Knowledge Questions] [1 of 2] [13/04/2022] Student knowledge assessment task © Content is subject to copyright, RMIT University FINAL APPROVED – STUDENT KNOWLEDGE ASSESSMENT TASK TEMPLATE – June 2019_Version 2.0 Page 4 of 10 RMIT Classification: Trusted STUDENT
Landscaper: Landscapers, gardeners, and horticulturists are typically not required to be registered. A business permit or certification may, however, be required for specific activities. Tiler: Many places do not require individual registrations for tilers, who install tiles on a variety of surfaces. The industry standards and best practices should, however, still be followed. Flooring Installer: It may not be necessary for flooring installers to register individually. Flooring materials (such as hardwood, laminate, and tile) have to be installed by competent individuals. It is more likely that they will work under the umbrella of a registered contractor or builder instead. Q5. In what situation/s must an un-licensed trade be registered? (15-25 words) A: Certain certifications or registrations may be required for unlicensed trades in certain situations. Standards in an industry are generally maintained, regulations are followed, and public safety is ensured. Q6. Explain the unlimited domestic builder registration process and minimum requirements. (100-150 words) A: Qualifications: A formal education in construction management or a related field is required for applicants with relevant qualifications in building and construction. Experience: A minimum number of years working in construction, often as a journeyman or apprentice. Insurance: In the event of an accident or damage during construction, proof of adequate liability coverage and workers' compensation coverage is required. Financial Stability: A credit check may be required or financial statements may be required as proof of financial stability. References: Proof of the applicant's competence and reliability from former employers, colleagues, or industry contacts. Character Assessment: Potential employees are typically subjected to a character assessment to ensure they have a clean criminal record and a history of ethical business behavior. Exam/Assessment: Completion of an exam or assessment that evaluates an applicant's understanding of building codes, regulations, and construction practices. Continuing Education: To stay up-to-date with industry standards and regulations, some jurisdictions require builders to participate in ongoing professional development or continuing education programs. Application and Fees: A formal application must be submitted to the appropriate licensing authority along with the required fees. Compliance with Codes and Standards: Adherence to local building codes, zoning regulations, and industry standards while performing construction work. [Knowledge Questions] [1 of 2] [13/04/2022] Student knowledge assessment task © Content is subject to copyright, RMIT University FINAL APPROVED – STUDENT KNOWLEDGE ASSESSMENT TASK TEMPLATE – June 2019_Version 2.0 Page 5 of 10 RMIT Classification: Trusted STUDENT
Renewal and Compliance: Builders are required to comply with all licensing requirements and are sometimes subject to periodic renewals and audits Q7. Apart from the trades controlled by the Building Commission, list two (2) other trades that work on domestic building sites that are legally required to be registered, and state which organisations regulate them. A: Plumbing: There are regulations governing the plumbing trade in most Australian states and territories. Queensland Building and Construction Commission (QBCC) oversees the plumbing industry, while the Plumbing Industry Commission in Victoria oversees the industry. In order to legally perform plumbing work in domestic buildings, such as installing, repairing, and maintaining plumbing systems, plumbers must hold a valid plumbing license. Electrical Work: Regulatory Organizations: Various state-specific electrical safety and regulatory organizations regulate electrical work. Electric Safety Offices (ESOs) regulate it in Queensland, while Energy Safe Victorias (ESVs) regulate it in Victoria. Registration Requirement: Domestic electrical installations, repairs, and maintenance must be performed by an electrician who holds a valid electrical license. Q8. In what situation/s must warranty insurance be taken out? (15-25 words) A A builders warranty or home warranty policy protects homeowners in the event that a builder fails to complete certain projects. Depending on the type of construction project and the jurisdiction, warranty insurance may be required. Major Renovations or Extensions: A warranty insurance policy may be required by some jurisdictions when a significant renovation or extension is carried out on a residential property. The new additions or renovations to the home are covered by this policy . Q9. When does a builder have to renew warranty insurance? A: A builder's warranty insurance is typically required to be renewed for each new construction project they undertake. Generally, builders are covered by warranty insurance on a project-by-project basis. [Knowledge Questions] [1 of 2] [13/04/2022] Student knowledge assessment task © Content is subject to copyright, RMIT University FINAL APPROVED – STUDENT KNOWLEDGE ASSESSMENT TASK TEMPLATE – June 2019_Version 2.0 Page 6 of 10 RMIT Classification: Trusted STUDENT
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
Construction insurance covers a specific project for a builder Q10. A builder’s financial capacity to take out warranty insurance includes what factors? List two (2). A: Solvency and Financial Standing: Assessing the builder's overall financial health is part of this process. In addition to evaluating the assets and liabilities of the company, it may also examine its cash flow and financial reserves. Strong financial standing increases the likelihood that a builder would be trusted to fulfill their obligations, including potential warranty claims. Insurance Premium Payment Ability: An important consideration is the builder's capacity to pay the necessary insurance rates. Insurance companies want to make sure the builder has the resources to pay for the cost of the insurance. Examining the builder's cash flow and payment history may be necessary. Q11. What does warranty insurance protect? (50-100 words) A: Warranty insurance, commonly referred to as builders warranty or house warranty insurance, protects homeowners from certain flaws or incomplete construction work. It often encompasses structural flaws, improperly finished or incomplete work, and violations of statutory warranties. This insurance guarantees that, should such problems emerge within the policy period, the insurer would intervene to address or finish the job, giving homeowners financial security and peace of mind. Q12. When setting up a payroll system list the eleven (11) entitlements you have to include for employees. A: Basic Salary/Wages: The regular income a person receives for their labor is known as their basic salary or wages. Overtime Pay: Extra remuneration for time put in beyond the typical workweek or workday, often at a higher rate. Bonuses: Additional payments made to employees in response to performance, business success, or other factors. Commissions: Payments paid to sales or commission-based workers based on a portion of the revenue or sales made. Allowances: Additional payments or perks given to employees for certain purposes, such as uniform, [Knowledge Questions] [1 of 2] [13/04/2022] Student knowledge assessment task © Content is subject to copyright, RMIT University FINAL APPROVED – STUDENT KNOWLEDGE ASSESSMENT TASK TEMPLATE – June 2019_Version 2.0 Page 7 of 10 RMIT Classification: Trusted STUDENT
housing, or travel expenses. Leave Entitlements: Annual Leave (Vacation): Paid time off provided to employees for leisure and relaxation known as an annual leave (vacation). Sick Leave: Paid time off for employees who are sick or injured and unable to work. Public Holidays: Paid time off for officially recognized public holidays. Health Benefits: Financial assistance with employees' medical expenses or other medical perks. Retirement Benefits: Retirement benefits are contributions made to pension or retirement programs by either the company or the employee. Social Security and Payroll Taxes: Payroll taxes and social security contributions are deductible, including both employer and employee payments. Employee Stock Options or Equity: Include any stock options or equity awards made to employees as part of their overall remuneration package, if appropriate. Other Benefits and Perks: Other Perks and Benefits: These might be things like wellness programs, flexible spending accounts, and tuition reimbursement. Q13. When must a builder register for GST? (15-25 words) A: A builder must register for GST (Goods and Services Tax) in Australia when their annual turnover reaches or exceeds $75,000 Q14. Explain Pay Roll Tax and when is it to be paid. A: payroll taxes are those that employers must deduct from employees' paychecks and pay to the relevant government agencies. Social Security, Medicare, and unemployment insurance are just a few of the social programs and benefits that are supported by these levies. Employers must be aware of the local tax laws that apply to them and make sure that they meet all filing and payment requirements on time. Additionally, businesses may effectively handle their payroll tax obligations by using payroll software or seeking the advice of a tax expert. Q15. List the requirements for Tax Invoices. In your answer, show how is GST shown on a GST invoice with a value of 2000 dollars, GST inclusive? A: 1. Supplier details 2. invoice number and date [Knowledge Questions] [1 of 2] [13/04/2022] Student knowledge assessment task © Content is subject to copyright, RMIT University FINAL APPROVED – STUDENT KNOWLEDGE ASSESSMENT TASK TEMPLATE – June 2019_Version 2.0 Page 8 of 10 RMIT Classification: Trusted STUDENT
3. description of goods and services 4. price of goods and services 5. GST amount 6. total amount payable Quanty: 10 units Unit price : $200 each Total price: (exc GST): $2000 GST (10%):$181.82 Total amount payable (inc GST): $2,181.82 Section C – Feedback to Student Has the student successfully completed the task? Yes No Feedback to student: Assessor Name Date [Knowledge Questions] [1 of 2] [13/04/2022] Student knowledge assessment task © Content is subject to copyright, RMIT University FINAL APPROVED – STUDENT KNOWLEDGE ASSESSMENT TASK TEMPLATE – June 2019_Version 2.0 Page 9 of 10 RMIT Classification: Trusted STUDENT
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
  • Access to all documents
  • Unlimited textbook solutions
  • 24/7 expert homework help
[Knowledge Questions] [1 of 2] [13/04/2022] Student knowledge assessment task © Content is subject to copyright, RMIT University FINAL APPROVED – STUDENT KNOWLEDGE ASSESSMENT TASK TEMPLATE – June 2019_Version 2.0 Page 10 of 10 RMIT Classification: Trusted STUDENT

Browse Popular Homework Q&A

Q: Find dy/dx and d²y/dx². x = et, y = te¬t dy dx dzy dx2 For which values of t is the curve concave…
Q: Solve the following system s of linear equations by using the method of elim ination by equating the…
Q: Provide the IUPAC name for the condensed structural formula shown here. H₂C H₂C. H₂C CH₂ H₂C. -HC…
Q: PH is a measure of _______ and _____ in a solution (which is dissolved in H2O)
Q: What is the maximum speed (in m/s) of a 4.9 g particle that oscillates between x = 2.0 mm and x =…
Q: You are give an array which contains the following integers : 9, 10, 12, 15, 7, 2, 1, 16, 18, 5, 6.…
Q: 12 V Μ Μ R1 120 Ω R2 120 ΩΣ R3 330 Ω
Q: AH Changes sign when a process is reversed Click on the button within the activity and analyze the…
Q: For each bond, show the direction of polarity by selecting the correct partial charges. Si-S Si-Cl…
Q: What is the reason 0 degree sun angle? What is the implication in terms of day length
Q: A spherical snowball is melting. Find the approximate change in volume if the radius decreases from…
Q: Name two organelles found in a stratified squamous epithelial cheek cell.
Q: Programming Question Will you update the code using the instructions & code I provided. Please…
Q: A block of mass m moving with an initial speed vo slides to rest in a distance D on a horizontal…
Q: A coffee manufacturer claims that the mean amount of coffee in its  6 -ounce jars is  6.1  ounces.…
Q: f(x) = x³ − 15x² +27x2. F
Q: Rectangle Gate AB has length L and width b into the paper is hinged at B and has negligible weight.…
Q: Use the following information to complete parts a and b below. 1(x) = (1 + x)~2, approximate 1.082…
Q: What are the 4 important items covered in chapter 2 of John Green's "crash course series in U.S…
Q: According to the Adlerian approach, client insight is determined by awareness and action.  True…
Q: A power diode used in a cell phone tower power supply dissipating power during the conduction…
Q: company has 5 stores {1, 2, 3, 4, 5}. The sales for each store is as follows: {200, 300, 400, 500,…